Evian LHC BC workshop 19-20 January 2010 1 LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
SECTOR TEST PREPARATION W. Bartmann, C. Bracco, J. Uythoven LIBD Meeting, 10-Feb-2015.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
Injection and Extraction Losses W. Bartmann with many inputs from: R. Appleby, R. Assmann, P. Baudrenghien, V. Boccone, C. Bracco, B. Dehning, E. Gianfelice,
Status of the LHC optics T. Persson on behalf of the OMC-team.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
LHC Beam Operation Comitte24. April INJECTION AND TRANSFER LINE STABILITY L.Drøsdal For the injection team.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LHC orbit system, performance and stability LHC Beam commissioning workshop, Evian, 19./20. Jan 2010 Kajetan Fuchsberger Thanks for Help and discussion:
June 2006LHCCWG / J. Wenninger1 Orbit response measurements and analysis J. Wenninger AB-OP Principle Software status Example from SPS ring and lines Potential.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
STABILITY STUDIES OF THE PSB-TO-PS TRANSFER W. Bartmann, J. Abelleira With many inputs from: O. Berrig, J. Borburgh, S. Gilardoni, GP di Giovanni, B. Goddard,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
26 January 2006Chamonix LHC Project1 Chamonix 2006 – LHC Project Workshop Proposed tests with beam B.Goddard AB/BT Input from L.Bottura, B.Dehning,
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
Aperture measurements during LHC commissioning 2017
DRY RUNS 2015 Status and program of the Dry Runs in 2015
LHC Commissioning with Beam
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
SPS extraction, transfer lines, injection
Emittance growth AT PS injection
Chamonix 2009 – LHC Performance Workshop
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Thursday morning – optics correction
CNGS Primary Beam Results 2010
Sector Test - General objectives
LHC Injection and Dump Protection
Lost at 12:05 to power converter (RTQX2.R1) problem
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
Planning at 5 o’clock meeting Friday
450 GeV Preliminary Commissioning: Measurement Programme
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Programme for Friday 9 July
Wednesday 23/2 Thanks CRYO!!!.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
LHC An LHC OP guide… under construction J. Wenninger
Presentation transcript:

Evian LHC BC workshop January LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all contributors In particular: K.Fuchsberger, S.Fartoukh, V.Mertens, J.Uythoven, M.Barnes, E. Carlier, W.Bartmann, C.Hessler, L.Jensen, R.Jones, M.Lamont, R.Giachino, G.Mueller, S.Redaelli, W.Herr, F.Schmidt, OP crews on shift…

Evian LHC BC workshop January Scope 1.LHC transfer lines – 2009 optics studies Trajectory Dispersion Kick response Aperture 2.Injection regions Injection steering MKI wave form Injection protection Injection aperture 3.List of subjects to follow-up

Evian LHC BC workshop January LHC Transfer line Transfer line BPMs: - calibration performed and included in the measurements -Rhodri, Lars and team + essential data from kick response measurements (Kajetan) - request for additional BPMs upstream of TT60 – hidden trajectory bump – available for 2011 start-up - more robust dispersion measurements in TI 8 thanks to the dual plane reading and the additional BPMs in the LHC injection area in TI 2, same improvements will be available for the 2011 start-up – BI teams Main outcomes from all transfer line beam time measurements – trajectory, kick response and dispersion measurements:

Evian LHC BC workshop January Trajectory examples TI 8 bare trajectory TI 8 corrected trajectory -few correctors, <20  rad

Evian LHC BC workshop January Transfer line magnetic model: TT60 MBE CC switched to MBB – vertical bare trajectory as expected MQIs DK/K = ~1.006 MQI measurements by magnet group MBI sext. component of ~ r=25mm (idea from S.Fartoukh) Confirmed by magnet group from 2D calculations MBI quad. component of r=25mm Feed-down from systematic horizontal offset in MBI Nominal Idem + Dk/k+b2+b3 Idem + initial cdts Rematched optics with b2,b3 components and use new MQI CC

Evian LHC BC workshop January Kick response measurements – TI 8 - V plane – Before rematching ~ 0.7% over-focussing in vertical plane apparent cf model Kick response measurements – TI 8 - V plane – After rematching Courtesy: Kajetan

Evian LHC BC workshop January TI 8 1 st and 2 nd order dispersion with rematched optics Dx D’x

Evian LHC BC workshop January TI 2 and TI 8 aperture studies - Momentum aperture: +/ to 0.4%, as expected. - Physical aperture explored in both lines in H and V, at different phases, 30 deg intervals, using on-line model and dedicated knobs

Evian LHC BC workshop January In both planes in both lines: -No bottlenecks Note: aperture restriction between P8 MSI and Q5 solved after re-alignments - Measured aperture ≥10 nominal  Few phases in TI 2 to complete

Evian LHC BC workshop January Injection region Injection steering Injection region aperture Kick response – dispersion measurements MKI waveform TDI and TCLIA/B setting up around orbit, LHCb BeamCdtMonitor, setup of TDIs to golden orbit – see Wolfgang’s talk Checked losses on TDI & IR8 for MKI off/over-injecting – see Christos’ talk Tests of injection and matching with xing/sep bumps on – see Werner’s talk Injection kicker timing in Injection of multiple bunches … Much injection checks and setting-up work performed through the LHC beam commissioning

Evian LHC BC workshop January TI 2-TI 8 Steering 11  TI 2+S23 and TI 8+S78 selections of the steering display now by default: o TL trajectory o Ring First turn - Closed orbit = injection oscillation  Closed orbit is estimated from average of 50 first turns >> ensures that TL steering always brings beam onto the CO FT-COTrajectory

Evian LHC BC workshop January Injection Autopilot 12  Feedback tools inside steering program to correct injection oscillations: o Same tool used for SPS injection oscillations & SPS target steering. o Manually activated. o Algorithm can be configured (DB). Presently:  Fit a betatron oscillation to the ring FT-CO (in H subtract dp/p error).  Interpolate fit to a virtual start point (pos + angle).  If pos/angle out of tolerance, correct with 2 correctors at end of line. >> tested & works well !  May need to tune algorithm because of TL collimation. o Global MICADO (towards ref) better? >> need more experience !

Evian LHC BC workshop January Kick response measurements -1 Data in very good agreement with model. All measurements were done at deltap/p = permil. Figures show a comparison between measurements (blue) and model (red). Beam from left. H plane V plane Courtesy Kajetan

Evian LHC BC workshop January H+V response of horizontal kicker MCIAH for TI8 and LHC sector 78. Kick response measurements -2 H+V response for vertical kicker MCIAV for TI8 and LHC sector 78. Vertical (blue background) couples to horizontal (red background) Courtesy Kajetan

Evian LHC BC workshop January Point 2 / 8 TDI and TCLIA/B setting up Transfer line protection devices: setting up partially done TDI / TCDI : done –See Wolfgang Bartmann presentation

Evian LHC BC workshop January MKI 2 and 8 waveform measured Looks OK except for 2% overshoot, both MKI2 and 8 – being corrected Courtesy M.Barnes

Evian LHC BC workshop January Injection kicker timing in Beam1 Beam2 Both beams timed in –Adjusted with OASIS signals –Configured for abort gap keeper –Checked beam injected OK with acceptable oscillations –Need to check the fine timing to fit full SPS batch

Evian LHC BC workshop January Multiple bunch injection (and fixes) 4 bunch injection sequences worked after timing in MKI and MKD Need to be aware that injecting near to abort gap needs consideration –bunch is always at the head of the injection kicker pulse – always 11  s gap as result after last bunch –may need to reorder some injection sequences, especially with ‘trailing pilot’ –may need to change order of injection for some bunches. Setting up of protection devices to (re)do for high intensity

Evian LHC BC workshop January Transfer lines: Importance of: –Regular survey checks and re-alignment –Steering with minimum corrector number and strength –Accurate characterisation of the main magnets –Noise on QPS from TF pulsing? Worry about other EMC sources around ring? Injection region: –FT-CO evaluation is presently based on FIFO acquisition: Works only when injecting into EMPTY ring. –To be able to work on ANY injection (also with circ. beam): FT-CO from capture data. Code written – needs testing. Capture data must be automatically configured and enabled to trigger on the buckets corresponding to the injected bunches (>> injection sequencer). –‘Interference’ with PC interlocks of TLs: Corrector interlock margin presently  rad (from CNGS experience). Must find a compromise between protection (small tol.) and steering flexibility (larger tol.). Note that shift crews have the right to change the corrector reference settings (not the tolerance). 3- List of subjects to follow-up

Evian LHC BC workshop January Injection region (cont’d): –Still investigate how to over-inject without interlocking Puzzle of losses in P8 on MQX – issue of BLM range –Fine synchronisation of injection kicker pulse to bucket 1 –Setting up of TCDIs and TCLIA/Bs –Losses on TCDQ/TCSG for B1 at injection– (more) checks to make –BQM information for IQC – to be made operational –Injection sequences to revisit with ‘trailing pilot’ May need to change order of injection for some bunches. Need adequate (re)commissioning time