WEST OAKLAND SPECIFIC PLAN (WOSP) & DRAFT ENVIRONMENTAL IMPACT REPORT Update to WOSP Steering / Technical Advisory Committees April 3, 2014 1.

Slides:



Advertisements
Similar presentations
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Advertisements

Performance Measures CTP 2040 Policy Advisory Committee August 19, 2014.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Planning & Community Development Department Amendment to Fuller Master Plan 135 North Oakland Avenue Predevelopment Plan Review City Council Meeting June.
San Mateo Rail Corridor Transit Oriented Development Plan ABAG/MTC/ULI Workshop September 29, 2006.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
The HiAP Concept We all have a role to play in creating healthy communities.  Environments in which people live, work, study and play impact health 
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
City of Brisbane Open Space & Ecology Committee April 27, 2006 Baylands EIR Scoping.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
NUMMI New United Motor Manufacturing, Inc. Automobile manufacturing venture of General Motors Corporation and Toyota Motor Corporation.
Land Use Study for the Community of Winchester July 9, 2012.
Beyond the Environment: Socio- Economic Sustainability & Meaningful Community Input in Land Use Decisions Sarah Muller March 7 th, 2008.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Where the Home Is Matters Planning for Healthy and Equitable Communities Julie West, MPH Jim Krieger, MD, MPH Public Health – Seattle & King County May.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
David Rizk, DirectorKevin Colin Development Services DepartmentLamphier-Gregory, EIR Consultant South Hayward BART/Mission Blvd Form-Based Code Draft Supplemental.
1. Hybrid Planning Application Detailed Application = Stadium and related infrastructure Outline Application = Enabling development sites 2.
Skyline Heights City of Corona Scoping Meeting March 4, 2014.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
WEST BERKELEY PROJECT Master Use Permits (MUP) May 15, 2012 Response to Concerns & Issues.
Miami-Dade County Department of Planning and Zoning - pg 1 Evaluation and Appraisal Report 2010.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
F O R W A R D L A P O R T E What are the city’s top 3 economic development priorities? n=300.
JUNE 27, 2013 ARB INFORMATIONAL UPDATE: ASSOCIATION OF BAY AREA GOVERNMENTS’/ METROPOLITAN TRANSPORTATION COMMISSION’S DRAFT SUSTAINABLE COMMUNITIES STRATEGY.
Village of Villa Park Comprehensive Plan Update CPAC Meeting December 2 nd, 2008.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
13 th – 15 March, 2006 New Perspectives in Real Estate Development In Port of Spain Welcome.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Comprehensive Plan Update. General, far-reaching vision to benefit the whole community Takes a long term view of issues Focuses on physical development.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Defining Alternative Scenarios MTC Planning Committee and ABAG Administrative Committee May 13, 2011.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Prepared by: Alex Fisch Planning Services Division.
The NH Climate Action Plan and the need for Adaptation Sherry Godlewski NH Department of Environmental Services
DRAFT INNER MELBOURNE ACTION PLAN Presented by Elissa McElroy IMAP Executive Officer January 2016.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
Airdrie Land Use Bylaw Presentation to City Council May 2, 2016.
City Council Meeting October 15, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of Element.
Proposed Research Plan Fiscal Year Today’s Proposed Action Approve Fiscal Year Research Plan Allocate $6 million in four research.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Vista Verde Ranch Revised Draft Environmental Impact Report Vesting Tentative Tract & Oak Tree Permit Project Description :70 unit single.
Environmental Impact Report (EIR) Update May 2, 2016.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Buena Park General Plan Update Overview Presentation.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Facebook Campus Expansion Project EIR
Updates to the Traffic Reduction and Transportation Improvements Fee (TR/TIF) City Council July 24, 2017.
Overview What is the CEQA environmental review process?
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager.
Hercules Planning Commission
Brackish Water Desalination Project Draft EIR
Mayors’ Commission on Climate Change
Mayors’ Commission on Climate Change
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

WEST OAKLAND SPECIFIC PLAN (WOSP) & DRAFT ENVIRONMENTAL IMPACT REPORT Update to WOSP Steering / Technical Advisory Committees April 3,

Project Status  Comment Period concluded March 17, 2014  24 Comment Letters Received  50 + Persons Submitted Oral Comments  Currently revising Draft Specific Plan & DEIR in response to comments to produce Final Plan & EIR for Council consideration in July

Recap: Specific Plan Contents Attracting new businesses & industries Retaining Industrial land and jobs Ensuring equity in economic development Improving area infrastructure Addressing crime Combating blight Fostering the arts Preserving historic resources Establishing appropriate land use policies & regulations Identifying preferred development concepts Fostering community health Enhancing transit Encouraging open space Enhancing residential neighborhoods Increasing residential development Attracting more retail establishments Supporting affordable housing Retaining educational resources Remediating contaminated sites Augmenting design guidelines 3

SPECIFIC PLAN COMMENTS Major Themes  Avoid Gentrification / Displacement:  More Details Requested re: how existing West Oakland social / equity Issues will be addressed (e.g., Social Services, Business Development/ Employment Training, Community Benefits )  Concern that Plan will encourage Gentrification / Not Increase Affordable Housing  Concern that Plan doesn’t go far enough to help particular populations (Artist community, African Americans, Youth) 4

SPECIFIC PLAN COMMENTS Major Themes, cont.  Land Use / Zoning Concerns:  Proposed rezoning of Mayway site  New regulations that could effect existing operations at select sites: Schnitzer Steel property EBMUD West Grand Ave property  Possible Conflicts between Proposed Overlays and Base CIX Zones 5

SPECIFIC PLAN Comments Major Themes, cont.  Traffic/Transportation Concerns:  Road diets for West Grand Ave, Adeline Street & 14 th Street  Roundabouts on Adeline Street  More detail Needed on Proposed ‘O’ Transit Loops & Bike Networks 6

SPECIFIC PLAN Comments Major Themes, cont.  Infrastructure / Utilities:  More details requested regarding how Infrastructure improvements will be guaranteed / funded  More info requested regarding improvements necessary to address West Oakland Climate Control / Flooding issues 7

SPECIFIC PLAN Comments Major Themes, cont.  Historic Preservation / Cultural Resources:  More details requested regarding strengthening viability of various historic resources & locations, such as: 7 th Street corridor 16 th Street Train Station Brotherhood of Sleeping Car Porters 8

SPECIFIC PLAN Comments  Comments in Support of Plan:  “…most complete package of thoughtful planning I’ve seen in Oakland…”  “…Plan will help City & BART achieve shared vision for Transit-Oriented Development…”  Support for Plan’s Intents to Strengthen Industrial / Business Development overall 9

Prospective Plan Amendments  Reorganize Plan layout to present Land Use discussion earlier & make Plan easier to locate topics  Eliminate Mayway rezoning  Replace proposed Overlays with new CIX Zones that reflect intent of overlays  Revise Plan to address most comments, however some issues are beyond the scope of Specific Plan so must be addressed through other tools 10

Prospective Plan Amendments  Loosen Home Occupation regs to allow more home businesses  Make it easier to add Secondary Units  Create new HBX Type to encourage true live/work  Reconsidering Road Diet & Roundabout recommendations 11

Recap: Draft EIR Contents Aesthetics, Shadow & Wind Air Quality Biological Resources Geology & Soils Cultural & Historic Resources Greenhouse Gas Emissions/Climate Change Public Services & Recreation Hydrology & Water Quality Land Use & Planning Noise Transportation / Traffic Utilities & Service Systems Population, Housing & Employment Hazards & Hazardous Materials 12 Analyzes impacts of development recommended in the West Oakland Specific Plan [see DEIR Table 2-1 (page 2-9) for details] Environmental Topics Analyzed include :

Draft EIR, cont. Less Than Significant Impacts  Aesthetics  Cultural Resources  Public Services  Agricultural  Geology & Soils  Selected Air Quality Impacts  Hazards & Hazardous Materials  Land Use  Noise  Selected Traffic  Biological  Hydrology/Water Quality  Selected Greenhouse Gas Emissions  Utilities & Service Systems 13

Draft EIR, cont. Significant & Unavoidable Impacts 14 Topic ImpactMitigation Air Quality Air-3 Odor: substantial number of new people to existing and new objectionable odors Air-5: Construction emissions Air-7: LI Manufacturing, diesel generators Air-9: SCA B: Exposure to Air Pollution (Toxic Air Contaminants), BAAQMD Regulation 2, Rule 5 Air-10: contaminants (TACs) Mit-3: No feasible Plan policies or mitigation measures Mit-5: SCA A: Construction-Related Air Pollution Controls for Dust and Equipment Emissions Mit-7: SCA 24, Parking and Traffic Mgt. Plan Mit-9: Risk Reduction Plan Mit-10: SCA B: Exposure to Air Pollution (Toxic Air Contaminants) Greenhouse Gas Emissions GHG-3: Individual industrial and commercial projectsMit-3: SCA Traf-1: Parking and Transportation Demand Management SCA Util-1: Waste Reduction and Recycling, Landscape Requirements and Tree Replacement, Stormwater Mgt. SCA F: Greenhouse Gas (GHG) Reduction Plan

Draft EIR, cont. Significant & Unavoidable Impacts, cont. Topic ImpactMitigation Queuing and LOSCity of Emeryville Traffic and Transportation Trans-1 (Existing plus Project) and -3 (Cumulative plus Project) at Hollis and 40th Street Trans-2 (Existing plus Project) and -4 (Cumulative plus Project) at San Pablo Avenue and 40th Street Mit-1: Extend the southbound left turn lane queue storage to 175 feet. Mit-3: Increase the actuated cycle length. Extend the westbound left turn queue storage to 425 feet Extend the southbound queue storage to 175 feet Mit-2: a) Add an additional eastbound left turn lane b) Optimize signal timing parameters (i.e., adjust the allocation of green time for each intersection approach) Mit-4: Optimize signal timing parameters (i.e., adjust the allocation of green time for each intersection approach) Trans-5 (Cumulative plus Project) at Mandela Parkway and West Grand Avenue Mit-5: to LOS C in the AM peak hour and LOS D in the PM peak hour, conflict with the City’s plans and policies for roadways in the area: Retain three existing westbound through lanes by terminating the proposed road diet before the intersection and add an exclusive right-turn channelization Add an additional eastbound left-turn lane to provide two left-turn and two through lanes Modify the traffic signal timing 15

DEIR Comments Major Themes  Air Quality:  Concern about locating residences near freeways & Port  BART and rail noise and BART TOD:  Concern about impact on residents & whether mitigation can be implemented  Transportation, including the “O”:  Concern about Traffic analysis adequacy re: varying density analysis 16

DEIR Comments Major Themes, cont.  Sea Level Rise/ Climate Change Adaptation Plan:  Concern that the EIR doesn’t adequately address impacts  Population & locally-owned business displacement:  How well does the DEIR provide mitigation for the plan impact on existing residents, businesses and employees 17

Upcoming Actions 18  April – May 2014: o Revise Draft Plan & Draft EIR in response to Comments  Late May 2014: o Distribute Final Specific Plan & Final EIR  June 2014: o Planning Commission consideration of Final Plan & Final EIR  July 2014: o Council Committee & Full Council Consideration of Final Plan & Final EIR