Meriden Comprehensive Sidewalk Analysis and Strategy Report Developing a financially sustainable maintenance program.

Slides:



Advertisements
Similar presentations
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Advertisements

State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
1 Complete Streets: Guide to Answering the Costs Question Companion Presentation, Part 3.
Harris Road Question 2. Contract Zone In February, Justin Fletcher requested the Town Council grant a Contract Zone for his property located at 3 Longwoods.
Walkability and Urban Form " Using GIS to measure walkability of neighbourhoods" URISA Ontario Conference May 5, 2009 Planning, Housing, and Community.
The Dyer Partnership Engineers and Planners City of North Bend Pavement Management Plan & Street Utility Fee Analysis February 11, 2014.
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
Gateway Smart Growth District proposed pursuant to M.G.L. c.40R Town of Reading – Board of Selectmen Public Hearing – Tuesday August, 28 at 7 PM Ted Carman,
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Non Powell Bill Street Repair & Maintenance Strategies October 8, 2012.
City of Atlanta Sidewalk Maintenance Best Practices and Policy and Funding Reform Subcommittee Recommendations Sidewalk Task Force February 14, 2013.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Sidewalk Inventory of Seguin, Texas A Wellness and Lifetime Knowledge Project (WALK ) Data Sources TIPHER (client), Chamber of Commerce, Seguin Police.
Using LDRs to Implement Ped/Bike Change. LDRs – Land Development Regulations The collection of laws and regulations that govern the use of land, zoning,
1 Rated “Excellent” 2009 September 15th Facilities Master Plan: Sept Board of Education began the process to include community in developing.
The SMART CHOICES PROGRAM and TRANSIT-ORIENTED DEVELOPMENT Presentation to ETS Annual Community Conference March 11, 2006.
Roads & Jobs For Riley County. The county’s roads and bridges are deteriorating and there are extremely limited funds available for replacement The county’s.
Document 51 1 Lansdowne Partnership Plan Business Model Document 5.
REGARDING RESERVES.  The operating budget for your association is prepared every year to project the next years expenses and determine the amount of.
Meeting Agenda Introduction (20 minutes)  Project Definition  Complete Street Goals  Existing Conditions Summary Work Session (1 hour)  Mapping Exercise.
SEATTLE LIGHT RAIL STATION AREA PLANNING City of Seattle Station Area Planning in Seattle SEATTLE LIGHT RAIL STATION AREA PLANNING.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
Tax Classification Hearing Fiscal Year 2013 Board of Selectmen December 17, 2012.
LLANO COUNTY MUD #1 ROAD PROJECT REVIEW PURPOSE DISCUSS POSSIBILITY OF COMPLETING REMAINING ROAD UPGRADE PROVIDE FACTS TO INFORM COMMUNITY TO MAKE DECISION.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force March 29,2007 Pavement Management Report Financing Plan Presenter:
Panel Discussion Arizona GFOA October 21,  Operating Budget  Budget-balancing Worksheet -- Interactive  Detailed Budget Reduction Prioritization.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Growth Management Legislative Discussion March 20, 2012.
Annexation Issues in Eden A History of Annexation in Eden Since 1968 NC Annexation History Current Annexation Issues in Eden January 2010.
Council Policy Forum Feb. 23, 2015 CAPITAL PLANNING & INFRASTRUCTURE.
Public Hearing August 11, :00 pm. On May 3, 2011, the West Bountiful City Council adopted a balanced tentative budget maintaining current service.
Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.
People are pedestrians by design join the movement at
Atlanta Regional Commission Tom Weyandt, Department Director Comprehensive Planning May 2008.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Bicycle Advisory Board September 2, 2015 Freight Master Plan.
Resource Development Where We Were Where We Wanted To Go How we Got There.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
City of Surrey Overview - Sustainable Futures: A Boot Camp for Long-Range Planners SFU – October 2007 Murray Dinwoodie City Manager.
Complete Streets Training
TOWN OF JUPITER Abacoa Property Owner’s Association Annual Meeting November 17, 2010.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Form & Function of Metropolitan America WALKABLE URBAN DRIVABLE SUB-URBAN WALKUPS: (Walkable Urban Places) DRVABLE EDGE CITIES WALKABLE NEIGHBORHOODS.
1 City of Cocoa Michael Burton - President Andrew Burnham - Senior Vice President Ashley Venturoni – Project Consultant Presented by: FY 2013 Water, &
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
JUNE 2016 Downtown Bozeman, MT Comprehensive Downtown Parking Plan.
Pedestrian Master Plan Update Seattle Planning Commission Michelle Marx, Ian Macek, Kevin O’Neill May 26, 2016.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
1. Accurate & Timely intelligence shared by all 2. Effective tactics and strategies 3. Rapid deployment of resources 4. Relentless follow-up and assessment.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Pedestrian Facility Improvement Program
Multi Agency Exchange May 16, 2017.
Chelan County Transportation Element Update
Finance Committee & City Council October 10, 2016
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Mayor R.T. Rybak August 14, 2008 City of Minneapolis
2017 Zoning Update New Sewickley Township.
Margarita Area Specific plan
Transportation Impact Fees and Funding
Walker Street Reconstruction Project 25% Design Public Hearing
Sidewalk Maintenance Program
Presentation transcript:

Meriden Comprehensive Sidewalk Analysis and Strategy Report Developing a financially sustainable maintenance program

Sidewalk Value

Rating Scale Good: 3 (No obvious flaws) Fair: 2 (Cracks and some misalignment) Poor: 1 (Portions missing, severe wear, or severe misalignment) Very Poor: 0 (Severe damage, hazardous conditions)

Amount of Sidewalk by Material and Condition for Major & Collector Streets

Condition Map

C.I.D.E.W.A.L.K. 65% for residential projects and 50% for non- residential projects 9 miles (approx. 47,520 linear feet) of sidewalk $1,731,201 of city funds and $1,079,768 of property owner funds $1,300,443 of the city funding was bond funds 40 applications held for 2014 and a balance of $50,000

School Walks Board of Education By school, what streets are expected to walk, which have access to bus service “Safe Routes to School” Good starting point to be expanded by “Safe Routes” or comparable program

Activity Centers Pedestrians will commute ¼ mile (accepted standard) Chose ½ mile radius around city resources (schools, hospitals, etc.) and commercial centers/plazas Provides us with a perspective of the network Can be used to better understand the network and predict pedestrian travel

Amount of Sidewalk by Material and Location for Major & Collector Streets

Strategy (PEEDS) Pedestrian Education & Involvement Plan of Actions (3) Funding PPrograms EEducation EEvaluation DDevelopment SSupport

Action 1 Continue with current strategy Expand current programs Determine feasibility of other programs and options

Action 2 Type of StreetMaterialSides of StSW width Typical Major and Collector Streets Concrete25Shown on SW map. Non-Intensive Major and Collector Streets Concrete15Shown on SW map. Streets located in exterior parts of the City that are or should be part of the sidewalk network but do not have sig. Commercial retail or MF res. development existing/allowed. A side of the street for SW should be identified in inventory of Major/Collector St. sidewalks SW when development occurs Typical Local Streets (Medium to High Density areas) Concrete24 Low Density Local Streets (areas with sig. existing concrete SW). Concrete14A side of the street for SW should be identified in inventory of Local St. SW when development occurs Low Density Local Streets (areas without sig. existing concrete SW) Bituminous14Replacement/new extensions of bit. SW should require street be added to an inventory of Local St. SW with side of street and material ID'd Local Industrial StreetsN/A0 Streets generally located in exterior parts of the City with Industrial uses/zoning with no sig. Commercial retail or MF res. development where SW should not be required for any non-res dev. or reuse

Plan Map

Action 3 Goal of linear feet to be replaced annually Amount determined by material lifespans 8,300 linear feet estimated to maintain current conditions A higher rate would be needed to improve the network

Funding Minimum annual budget: $460,000 Current spending: -$300,000 Needed funding: $160,000

Conclusion Funding $160,000 Education and outreach Adopt minimum sidewalk standards Adopt a sidewalk plan map Update condition map on a regular basis