1 1.8.1 WBS activity and Cost Summary (Focus on Design) Clement Wong TBM Conference Call Oct. 27, 2005.

Slides:



Advertisements
Similar presentations
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
US TBM Meeting INL, August 10-12, 2005 B. J. Merrill and D. A. Petti Fusion Safety Program Safety and Tritium R&D.
US ITER TBM DCLL TBM Design, Analysis and Development C. Wong, M. Dagher, S. Smolentsev and S. Malang FNS/TBM Meeting UCLA, September 19-20, 2007.
Summary of Current Test Plan for US DCLL TBM in ITER Neil Morley and the US TBM Participants INL, August
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
A design for the DCLL inboard blanket S. Smolentsev, M. Abdou, M. Dagher - UCLA S. Malang – Consultant, Germany 2d EU-US DCLL Workshop University of California,
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Project Management Considerations B. Nelson US ITER TBM Meeting INEL August 11, 2005.
Strawman R&D Tasks and R&D Costs Neil Morley and Alice Ying INL, August
TBM WG Meeting UCLA, December 12 th -14 th, 2005 Brad Merrill/Fusion Safety Program TBM Safety Update.
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
From Research Prototype to Production
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
DCLL PbLi Loops Design and Fabrication Plan and Cost B. A. Pint ORNL.
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Special assignment, OFES, USA 1 ITER, Cadarache, January 26, 2007 Clement Wong, General Atomics, USA Valery Chuyanov, Chang Shuk Kim, at this time the.
TBM Costing Lessons from Recent ITER Activities Scott Willms Los Alamos National Laboratory Presented at INL August 10, 2005.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Tritium Extraction from a DCLL Blanket Prepared by: Scott Willms (LANL) Collaborators: Brad Merrill (INL), Siegfried Malang (Consultant), Clement Wong.
Conference Call, June 23, 2005 Remarks on US Costing Activities for the US ITER-TBM Mohamed Abdou.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
IMPACT OF FRAME DESIGN AND FRAME REPLACEMENT PROCEDURE ON DCLL TBM By Mo Dagher Presented by Clement Wong TBWG-16 meeting, November, 15-17, 2005, Beijing,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
DCLL TBM R&D Summary Compiled by Neil Morley for the TBM Conference Call Oct 27, 2005.
Planned Document Management Improvements Rob McKercher, Iain Goodenow, George Angeli.
Pacific Northwest National Laboratory U.S. Department of Energy Initial Cost Estimates for Development of DCLL TBM Ferritic Steel Structural Components.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
1 -TBWG next meeting 8 - Presentation of Parties, in particular on action 17 and action 19 (TBWG-15), including: Progress of work Impact on TBMs of frame.
US Test Blanket Module Partially Integrated Testing Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Camera PDR/CD1 Planning 19 September 2008
Some General Guidelines for the US TBM Costing
DCLL TBM Reference Design
DCLL TBM Design Status, Current and future activities
DCLL TBM Safety Status Brad Merrill, Fusion Safety Program
VLT Meeting, Washington DC, August 25, 2005
Experimental equipment Edgar L. Black February 17, 2019
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
DCLL TBM Design Status FNST Meeting, August 12-14, 2008, UCLA
Project Management Considerations
ITER-TBM Planning and Costing Meeting
DOE Review of the LCLS Project October 2006
Compiled by Neil Morley for the TBM Conference Call Nov. 17, 2005
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Presentation transcript:

WBS activity and Cost Summary (Focus on Design) Clement Wong TBM Conference Call Oct. 27, 2005

2 Basic WBS and costing approach for all elements Consider Three design phase, Title I, II and III Work on WBS elements, sub-elements and respective definitions Review TBM program schedule Propose WBS element schedule Cost estimate for 10 years, (Assumption: 2006 and 2007 are leveled budget )

3 Draft 04/10/05

4 Preliminary Design and Analysis, Title I This WBS includes the administration and evolving the conceptual design into the preliminary design provides the depth and details to allow the DCLL to take shape and form. Complete the process of converting the conceptual design to a design appropriate for procurement and fabrication. The % complete is about 20-35% of the total design effort. Requirements for the DCLL Reference design are to be defined, the preferred design solution is identified, all critical issues resolved, R&D has started, costs are known to a rough order of magnitude design drawings and analyses necessary to document the solution exist, essential features and interface details have been prepared. Contingency levels are high (up to 40% or more). (From ) Detailed Design, Title II This WBS includes the administration and the detailed design is the last phase of development prior to fabrication. The purpose of the detailed design phase is to prepare final drawings, technical specifications and contract documents required to obtain bids and quotes for procurement and construction. The final design should also include clear statements of testing requirements and acceptance criteria for the safety and functionality of all subsystems. Requirements, design details, estimates and schedules are mature enough to establish the project performance baselines for scope, cost and schedule. Technical specifications are defined, R&D work is well along, and bids may be appropriate on long-lead procurement items. (From 2010 to 2012) Title III This WBS includes administration and vendor costs for technical support for procurement, fabrication, inspection, testing, as-built drawings, and other technical activities for the DCLL TBM. Documentation and QA is also included in this WBS. The cost of personnel providing technical support to procurement, installation, fabrication, inspection, testing, as-built drawings and other technical activities. (From 2010 to 2011)

5 Costing Input Table: one sheet per year

6 Status All WBS defined Most costing estimate completed except for some hardware, e.g. He and PbLi loops and interface equipment Assumptions: 2005, 2006 $ labor: burdened cost at $275k/FTE contingency not included risk factors not included Costing summarized

7 Most of the costs estimated, yearly costing distribution can be noted. DCLL program total is ~ $74M (~$42M is for R&D) incomplete cost as of 26/10/05 (not counting He and PbLi loops and interface equipment costs, marked in green) DCLL Costing Summary: EXCEL sheet distributed 26/10/05

Mechanical Design.1.1 Title I.2.1 Title II.3.1 Title III TBM Interface Title I.2.8 Title II.3.9 Title III Prepared by Mo Dagher TBM Conference Call Oct 27, 2005

9 TBM Mechanical Design Title I efforts. –Transition from conceptual design to preliminary effort –Set TBM design parameters –Generate 3D models and define TBM components and assembly –Start part design efforts –Define component fabrication processes and adjust design accordingly –Prepare to transition to Title II for detailed design Title II efforts –Transition from preliminary design to detailed design effort –Generate 3D models of all parts, assemblies and sub-assemblies –Generate detailed drawings, final check and shop drawing –Generate fabrication and assembly procedures. Title III efforts –Provide fabrication support, change order, design changes etc.. –Update TBM design with final design changes and generate as built models

10 TBM Components

11 TBM Interface Title I efforts. –Define TBM Interface areas, Frame, Piping, shielding Connections and RH. Title II efforts –Finalize Interface design points –Generate Assembly models –Finish components detail design and drawings for interface components Title III efforts –Support final TBM assembly efforts –Track and implement design changes –Develop as built drawings and models

12 TBM Interface Shielding Interface TBM Flexible Support Design Pipe and Connector penetrations TBM Frame Interface

13 TBM Interface

14 FS Engineering and fabrication Rowcliffe/Kurtz

15

16 Neutronics Sawan/Youssef

17

18 Update on DCLL Activation/Decay Heat input to PIE by M. Youssef

19 T/H MHD Smolentsev

20

21 Thermofluid Helium Sviatoslavsky

22 Helium Thermal-Hydraulic Analysis CFD Modeling and Analysis of : First Wall Top and Bottom Plate Grid Plates Back Plate Distribution System WBS Summary Cost Summary 5.9 FTE $ 1,630K (including travel) Estimate assumes design changes require continuing analysis

23 Structural Analysis Sharafat

24 Structural analysis cost summary

25 Engineering Diagnostics and Instrumentation for DCLL TBM Neil Morley TBM Planning and Costing Conference Call Oct 27, 2005

26 Diagnostics WBS definitions under (prelim) This WBS includes the selection and preliminary design of specialized diagnostic systems needed in the 1st TBM in the ITER electromagnetic and plasma environment and for subsequent TBMs subject to the nuclear environment. Input on needed R&D activities will be supplied to (detailed) This WBS includes the selection and detailed design of specialized diagnostic systems needed in the 1st TBM in the ITER electromagnetic and plasma environment and for subsequent TBMs subject to the nuclear environment. Input on needed R&D activities will be supplied to (title III) This WBS includes the fabrication support for specialized diagnostic systems needed in the 1st TBM in the ITER electromagnetic and plasma environment and for subsequent TBMs subject to the nuclear environment.

27 Diagnostic Comments Helium and PbLi loop WBS leaders should consider diagnostics and control systems needed for their loop operation and control. Experimental plan needs further detailed development do help determine the required/desired measurement, measurements locations and frequency. Very common area with International partners – only locations and integration into DCLL design unique to US DCLL TBM. Cost estimate – 0.1 FTE per year following detailed establishment of experimental plan up to the end of title III activities during fabrication (roughly 6 years – total 0.6 FTE = $170k.)

Helium Flow Loops Wong

29 US TBM PRIMARY AND INTERMEDIATE HELIUM COOLANT LOOPS IN TCWS

30

31 GA fission division costing group has accepted the Helium loops costing task and will deliver results in four weeks. Wong will meet the costing person next week.

PbLi Flow Loop Pint

33 PbLi Breeder Coolant Loop Dump Tank PbLi-He heat exchanger Expansion Tank Sump Pump Tank Tritium Extraction Cold Trap Unit Pressure Control Unit Rupture Disk Primary He coolant Line

34

ITER TBM Tritium Processing WBS, Description and Rough Cost Estimate Scott Willms Los Alamos National Laboratory October 27, 2005

36 WBS ElementsDescription Cost ($K) 1. Preliminary Design 1.1. Tritium Processing System AdministrationAccounts for managing the tritium processing system project and for project controls including reporting, statusing and scheduling R&D ModelingModeling is needed to predict tritium processing system performance and perform sensitivity analysis. This will guide both design and R&D Tritium extraction from PbLiA number of methods have been proposed for tritium extraction from PbLi, but little experimental work has been performed. This task will use both process analysis and experiments to determine the best strategy for extraction of tritium from the ITER TBM PbLi Tritium extraction from HeA number of methods have previously been used to extract tritium from helium. However, there are some unique challenges associated with this technology for the TBM. Experiments and analysis will be used to determine the best technology Fate of tritium in PbLiSeparation of tritium from PbLi will depend on the physical and chemical properties of this “binary” system. Examples of parameters needed are mass transfer coefficients, chemical speciation and liquid (PbLi side)-solid (tube wall) equilibrium. Experiments and model will be run to determine these parameters Design Tritium extraction from PbLiThis element will design systems for extracting tritium from PbLi. This may include a bubbler and a vacuum permeator. This must be closely integrated with the heat exchanger and other tritium-permeable surfaces Tritium extraction from HeThis element will design systems for extracting tritium from 1) the “dual-coolant” He stream and 2) the heat exchanger He. Permeators, oxidation/adsorption or other technologies may be used System integrationThis task will integrate all tritium processing systems as well as interfaces to other systems such as the Tritium Plant, safety systems, TBM diagnostics, control systems, etc. 50

37

38

X. DCLL/ITER System Integration.1 Administration.2 R&D.3 DCLL TBM System Integration.4 Fabrication & Procurement.5 Assembly, Testing, Onsite support Prepared by Mo Dagher TBM Conference Call Oct 27, 2005

40 DCLL/ITER System Integration.2 Design R&D –.2.1 Pb-Li Concentric pipe. Current DCLL system design uses a concentric pipe arrangement for the inlet/outlet Pb-Li flow. Internal pipe uses a slip joint to accommodate thermal expansion during operation. Design, Analysis, Mock-up and testing is required in order to develop a slip joint capable of handling the thermal expansion, and operating conditions of the DCLL. –.2.2 V.V and Transporter Expansion Bellows. Pipe penetrations through the VV plug need to maintain the Vacuum boundary and to allow for pipe movement due to thermal expansion. Bellows will be used to form a flexible seal between the OD of the pipe and the Boundary. Bellows will be used at the VV plug and at the Transporter wall to allows for pipe expansion between the two boundaries. Using ITER’s design guidelines and safety requirements, design development along with mock-up and testing is needed to develop applicable bellow design for DCLL system.

41 Test Port Configuration VV Port Extension VV – Cryostat Duct Cryostat Bio-Shield TBM Frame Assy VV Closure Plate Pb-Li Concentric Pipe. Internal Slip joint Design Transporter Port Cell Area Flexible Pipe Penetration Through VV closure plate

42 TBM Interface DCLL System Design Integration In-Vessel System Integraton Ex-Vessel System Integration and Interface Pb-li Loop Interface inside the transporter Pipe run design and interface with coolant loops and ITER facilities he Coolant loop interface with ITER RH System Integration. Develop process flow for the removal, replacement, transportation and installation of the TBM assembly utilizing ITER’s RH equipment. Define any special equipment and tooling specific to the TBM assembly that will be needed during this process. Develop maintenance procedures as well removal and replacement processes Engineering Design and Analysis. Design activities for all components identified under the integration task Piping Design modeling and detailed design activities for pipe runs identified under integration task RH tooling design. Develop design detail for any special tooling required for DCLL system

43 TBM Interface.4 Fabrication Procurement & shipping. –Administration, labor, Material and logistical support to Procure fabricate and ship al the components and assemblies needed under the System integration WBS..5 Assembly, Onsite testing and Support. –This WBS includes the administration and coordination on the installation and preliminary testing of TBM, making sure that ITER requirements are met and a close and smooth collaboration between ITER site management and operation with the TBM installation and testing personnel and operation.

44 System Integration Preliminary Project Plan

Safety and Regulatory Support Brad Merrill – INL

Safety and Regulatory Support This WBS includes the safety support, analysis, and design integration activities required to license for the DCLL TBM and TBM ancillary system Regulatory Support This WBS includes regulatory activities related to the DCLL TBM and TBM ancillary systems that will be required to obtain TBM regulatory approval. This includes the interaction with regulatory officials and the ITER IT to determine the regulatory requirements, safety rules, safety analyses, and reporting requirements needed to obtain licensing approval for the US DCLL TBM. In addition, this includes the presentation and defense of TBM safety results to regulatory officials and the ITER IT Safety Analysis and Reporting This WBS includes activities related to estimating the radioactive source terms mobilized from the TBM and TBM ancillary systems during accidents, performing the required safety analysis identified by TBM regulatory requirements, and the reporting of these results to regulatory officials and ITER IT in the form a TBM safety dossier and supporting safety documents Safety Design Integration This WBS includes activities related the interaction with the DCLL design team to integration of safety and regulatory requirements into TBM components that perform TBM safety functions. Of specific concern are the radiological confinement boundaries of the ITER device and the assurance that TBM and TBM system response to accidents in a manner that does not compromise the integrity of these boundaries.