Overview of the recommendation on LHC Splices Consolidation Frederick Bordry, head of the CERN Technology Department, has called for a series of three.

Slides:



Advertisements
Similar presentations
An Introduction to On-line Partial Discharge Surveys
Advertisements

MQXF Quench Protection Analysis HiLumi workshop – KEK, Tsukuba Vittorio Marinozzi 11/18/2014.
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
February 2009 Summary of Chamonix 09 Steve Myers.
GENERATOR PROTECTION.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
CRYOGENICS AND POWERING
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
Motor Testing (Motor Only)
Herman ten Kate and Alexey Dudarev MCS 600A sextupole circuits (update on study performed in May 2010) Content: References General observations Electrical.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Workshop on Beam losses, heat deposition and quench levels for LHC magnets, Geneva, 3-4 March 2005 Liquid helium heat transfer in superconducting cable.
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
LMC 30 LPC A. Verweij, TE-MPE. 30 Sept 2009, LMC meeting 1.9 K, 0 T, 7.5 kA run Heat pulse.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IR Quad Heaters.
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
Technology Department Second LHC Splices Review Review of actions from last review List of recommendations of the first review Status Category A.Various.
Third LHC Splices Review Review of actions from 2 last reviews Double shunt on quadrupole bus Insulation system Spiders and lyras electrical insulation.
MPP Meeting Sandor Feher Inner Triplet Powering Should include the IR quads and the DFBX especially the power leads. DFBX commissioning doc was.
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
Fourth LHC Splices Review Quality Assurance Review Introduction Why this 4 th review ? Committee, mandate Questions to the reviewers Overall Quality Assurance.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
E. Todesco EXPERIENCE WITH FIELD MODELING IN THE LHC E. Todesco CERN, Geneva Switzerland Thanks to the FiDeL team CERN, Space charge th April 2013.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Actual Circuit Total inductance:15.4 H (154x0.1H) Total resistance:1 m  RB output current:13 kA RB output voltage:190 V Main Power Converter RB circuit.
Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
FRESCA II dipole review, 28/ 03/2012, Ph. Fazilleau, M. Durante, 1/19 FRESCA II Dipole review March 28 th, CERN Magnet protection Protection studies.
Third LHC Splices Review Production Readiness Review Introduction Why this 3 rd review ? Planning, committee, mandate Evolutions since last review: SMACC.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Study of the HTS Insert Quench Protection M. Sorbi and A. Stenvall 1 HFM-EuCARD, ESAC meeting, WP 7.4.1CEA Saclay 28 feb. 2013,
B. Todd, A. Apollonio, M. Kwiatkowski, R. Schmidt, S. Wagner, J. Walter a Risk-Based Approach 1v2 to Machine Protection Systems.
Ruben Carcagno, Sandor Feher, George Velev (team leader) MQXFS1 status meeting Summary of the MQXFS1 Investigation.
SC Undulators protection and commissioning W. Venturini Delsolaro Acknowledgements: R. Denz, R. Maccaferri.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Electrical Current & Circuits. Components of an electrical circuit Source of electrical energy (battery) A conductor of electrical energy (wire) Device.
CHATS-AS 2011clam1 Integrated analysis of quench propagation in a system of magnetically coupled solenoids CHATS-AS 2011 Claudio Marinucci, Luca Bottura,
Ranko Ostojic AT/MEL 1.Beam heat loads 2.Magnet design issues related to heat loads.
Closing Session Report
First LHC Splice Review Introduction
Task 5: High-Tc superconducting link Summary of work-package
Quench Simulation at GSI
LHC Enhanced Quench Protection System Review
Circuits description and requirements
MMI^2T limits for magnets, what are they and how where they developed
Powering the LHC Magnets
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
the CERN Electrical network protection system
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Circuits description and requirements - Closed Session-
Other arguments to train two sectors to 7 TeV
BBQ (BusBar Quench) 1st STEAM Workshop June 2019
F.Pasdeloup, H.Prin, L. Williams
Presentation transcript:

Overview of the recommendation on LHC Splices Consolidation Frederick Bordry, head of the CERN Technology Department, has called for a series of three reviews with the general mandate “to review CERN’s plans and consolidation actions concerning the superconducting splices in the LHC machine for 7 TeV operation”. –all splices… not only RB and RQF/D The first of the three reviews, intended to focus on the design of the repairs of the superconducting splices for the main 13 kA bus bars, was held at CERN on October The review committee consists of Daniel Bresson (Alstom), George Ganetis (BNL), Toru Ogitsu (KEK), Frédéric Savary (ITER & CERN), Jim Strait (Fermilab, Chair), and Pierre Vedrine (CEA Saclay).

From the executive summary… Most of the executive summary is dedicate to the consolidation of the RB and RQF/D splices….not discussed here Part is related to other circuits… A systematic risk assessment has begun, that is surveying all of the superconducting circuits, and which is planned to develop into a more complete risk analysis of the higher risks identified. This is a very important activity, which seems to be well launched, and which needs to be well supported to ensure that it is completed in a timely fashion. We look forward to seeing the results of the risk analysis when the committee meets next.

Recommendation II.2. Ensure that an integrated, systems approach is being followed, covering both electrical and mechanical issues, neighboring systems, operations,. Need to develop electrical diagrams that shows information of the circuit that integrates both mechanical and electrical information in a single document. Use detailed electrical circuit models to analyze the peak voltages that could develop during quench and fault conditions. What are the difference in voltages is between components of different circuits during various conditions. Emphasis was put on the potential causes of electrical arcs due to high voltage breakdowns in the circuits. It was also mentioned that over-temperature of components can also cause electrical arcs due to conductor melting and or damaging conductor insulation. On the low current spool circuits there is only a ground fault current interlock that is alarmed if it goes above a pre-set value. The current is not recorded in the control system.

Comments to recommendation II.2. Integrated electrical/mechanical circuits diagrams along with circuit analysis models are an important tool needed for performing a comprehensive risk analysis. It is important to do a comprehensive survey of mechanical components in the circuits to assess the potential for voltage break- down risk. (e.g. the spider on dipole and quad busses) It is a very good idea to use independent experts to analyze the systems, which gives a new set of eyes to look for potential issues. There is a lack information on the maximum temperature rise due to a quench on the lower current circuits. This information can be very useful in determining how much margin is in the maximum temperature attained during a quench.

contd. We note that the previous comment concerning the lack of information about maximum temperatures might not need to have been made had a related recommendation from the LHC Enhanced Quench Protection System Review, February 2009, been carried out. It stated, “Collect and review existing MIITs limit calculation documentations for all components in all circuits and generate a summary document for design and reference. Use it to verify existing circuit protection designs.” The monitoring and recording of ground leakage currents during operations and electrical high potential testing is needed to allow the tracking of performance of the electrical isolation for the various circuits.

My comments A lot of simulation work and comparison with measurements was done in the past (more than 10years ago). This activity was stopped around the year A lot of information is still available, but scattered in notes, reports, …. The circuit models (done in SABER) are still available, but nobody works with them, and it would take time to re-activate these activities What questions do we have today? –can we damage a magnet during operation, with and without beam? taking into account realistic operational currents…. –can we avoid tripping of circuits? –can we relax the QPS threshold, and under what circumstances? –do we need to consolidate circuits during the long shutdown? Needed… –requires calculation of maximum voltage hot spot temperature in magnets and bus bars as a function of current –cross-talk between circuits

My comments Not all possible question can be addressed in finite time Priorities need to be defined My priority: develop circuit drawings and models together Have the tools to reply to the above questions Use the tools for some case studies … and to address question coming up during operation

Reports I Quench Simulations for the LHC Undulator / Hilaire, A (CERN) ; Völlinger, C (CERN), LHC-PROJECT-NOTE Geneva 2003 Principles developed for the construction of the high performance, low-cost superconducting LHC corrector magnets / Ijspeert, Albert ; et al., IEEE Trans. Appl. Supercond. 12 (2002) 90-93, 17th International Conference on Magnet Technology, CERN, Geneva, Switzerland, Sep 2001, pp.90-3 Simulation of the Effect of a Series of Superconducting Magnets on a Quenching Magnet using a Controlled Current Pulse / A.Hilaire et al. LHC-Project-Report- 527; CERN-LHC-Project-Report-527, 2002 Protection of the Superconducting Corrector Magnets for the LHC / R.Schmidt, et al., LHC-Project-Report-419; CERN-LHC-Project-Report-419, CERN, 2000 Quench propagation and heating in the superconducting 600 a auxiliary busbars of the LHC / R.Herzog, R et al. Joint Cryogenic Engineering Conference And International Cryogenic Materials Conference, Madison, WI, USA, Jul 2001 Quench Propagation and Heating in the Superconducting 600 A Auxiliary Busbars of the LHC / M.Calvi et al., LHC-Project-Report-511; CERN, 2004 Resistive transition and protection of LHC superconducting cables and magnets / F.Sonnemann, CERN-THESIS , CERN, p.

Reports II Protection of the MCS Sextupole Corrector Magnets / Schmidt, R (CERN), LHC- Project-Note-85: CERN, 1997 Protection of LHC superconducting corrector magnets / D.Hagedorn, et al., LHC- Project-Report-63; CERN, p. ….there are more