Seminar on Legal, Economic and Implementation Issues in PPP Projects

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

Regional Workshop on Public-Private
Competitive Selection of Concessionaires
Contract Management and Regulation Vickram Cuttaree The World Bank St. Petersburg – May 24, 2008.
An Overview of Concession Laws Regional Workshop on Public-Private Partnership in Transport Cesar Queiroz Roads and Infrastructure Consultant World Bank.
Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 4: Objectives of Procurement Regimes and Non-Discrimination and Preferences.
The Implementation Structure DG AGRI, October 2005
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
1 Why the World Bank Successful Privatisations are Useful for the Audit of Privatisation? The World Bank rich experience worldwide through providing technical.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Session 8 Implementing PPPs
Procurement in PPPs February 27, When do you start thinking about procurement? Preliminary Scoping & teaming Viability assessment Choice between.
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU CONCESSIONS IN TURKISH LAW İbrahim BAYLAN Legal Adviser Public.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU PROCUREMENT PROCEDURES FOR THE AWARD OF CONCESSION/PPP CONTRACTS.
Procurement of Consultancy Services. 2 Differences between.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
1 Business Opportunities Istanbul, Turkey 30 April 2010 Asian Development Bank.
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
ZHRC/HTI Financial Management Training
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Financing Urban Public Infrastructure
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Martin Oder, LL.M. The Emerging Role of the Competitive Dialogue.
Overall Considerations
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Main Achievements in Public Procurement in Ministry of Finance of the Republic of Moldova Public Procurement Agency Batumi, 2015.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Building Blocks for a Successful Public- Private Partnerships Presented by Igor Abramov Counsel & Co-chair, Eurasia and Russia Practice Group, Heenan Blaikie.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
SELECTION PROCEDURE Clivio CASALI, Project Officer EM ECW Erasmus Mundus and External Cooperation Call for Proposals for mobility activities starting in.
State Agency on Public Procurement and Material Reserves under the Government of the Kyrgyz Republic Public Procurement System of the Kyrgyz Republic.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy United Kingdom.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
1 APPLICATION ON THE SPANISH CONCESSIONAL MODEL TO CENTRAL AND ESTERN EUROPE WORLD BANK WORKSHOP ON PPP IN HIGHWAYS: INSTITUTIONAL, LEGAL, FINANCIAL AND.
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Presentation to the Joint Oireachtas Committee on Transport Assessment, Approval, Public Sector Benchmark and Procurement of PPPs 23rd September 2003.
Financial Simulation of Public- Private Partnership (PPP) Projects in Highways Cesar Queiroz World Bank, 3 April 2006 Transport Forum and Learning Week.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Supplying ITS Equipment to World Bank Projects
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
Evaluation Grids Evaluation Grids.
INTERCONNECTION GUIDELINES
Latvian MOT and World Bank Workshop on PPP in Highways
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
Toolkit for Public-Private Partnership in Highways
Latvian MOT and World Bank Workshop on PPP in Highways
PROCUREMENT POLICIES AND GUIDELINES
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Presentation transcript:

Seminar on Legal, Economic and Implementation Issues in PPP Projects Ministry of Economy of Poland and World Bank Seminar on Legal, Economic and Implementation Issues in PPP Projects Warsaw, Poland, June 17 and 18, 2008

Ministry of Economy of Poland and World Bank Seminar on Legal, Economic and Implementation Issues in PPP Projects Competitive Selection of the Private Partners. Use of Standard Bid Documents Cesar Queiroz Roads and Transport Infrastructure Consultant World Bank Warsaw, Poland, June 17 and 18, 2008

Procurement and Public-Private Partnerships (PPP) Procurement arrangements should be undertaken in a competitive manner PPP includes the full range of concession type arrangements for the provision, upgrading, maintenance, and operation of infrastructure projects PPP also includes long-term service contracts, management contracts, leases, and divestiture

Definition of Public-Private Partnership A Public-Private Partnership (PPP) constitutes a sustained collaborative effort between the public sector (government agencies) and private enterprises to achieve a common objective (e.g., a motorway or railway project) while they pursue their own individual interests.

Concessions Types of Concessions: Build, Operate, Transfer (BOT) Build, Own, Operate (BOO) Build, Own, Operate, Transfer (BOOT) In BOO and BOOT schemes the private operator retains ownership of the facility Concessions usually include some regulatory provisions to set the prices to be charged and the quality of service to be provided The assets are returned to the state at the end of the concession term (except BOO)

Evaluation Criteria for ICB Selection of Concessionaires May Include The amount of subsidies required from the public sector The performance specifications of the facilities offered The cost charged to the users Income generated for the Client by the facility The concession term (number of years)

Selection of the Strategic Investor or Concessionaire For relatively large projects, it is recommended to carry out: 1. Prequalification 2. A Two-Stage Bidding

World Bank Standard Bid Documents Prequalification Document for Procurement of Works & User's Guide, May 2007 - used in prequalifying applicants who express an interest in bidding Standard Bidding Document for Procurement of Works & User's Guide, April 2007 - http://web.worldbank.org/WBSITE/EXTERNAL/PROJECTS/PROCUREMENT/0,,contentMDK:20062006~menuPK:84284~pagePK:84269~piPK:60001558~theSitePK:84266,00.html http://www.worldbank.org/procure

International Competitive Bidding (ICB) Ensures transparency Provides a market mechanism for selecting the best proposal Stimulates interest among a broad range of potential bidders

Single versus Two Stage ICB The concession project is not complex and technical and performance requirements are clearly defined ➨ Single Stage ICB The concession project is complex and both technical and performance requirements are not clearly defined ➨ Two Stage ICB

Single Stage Bidding The Client prepares and issues the bid documents Bidders submit their technical and financial proposals The Client evaluates the proposals (technical and financial)

Two-Stage Bidding The First Stage Client prepares bid documents, including performance specifications; shares with pre-qualified bidders Pre-qualified bidders offer comments, suggestions Client evaluates feedback received and amend bid documents as/if appropriate The Second Stage Client sends pre-qualified bidders the final bid documents and invites proposals Bidders submit technical and financial proposals Client evaluates technical proposals; then financial proposals

Prequalification Process Objective Determine, among all interested applicants, those who are qualified for the main bidding process Required conditions Prequalification is strict so that the government can make an adequate selection Applicants are provided with sufficient information on the concession In the case of joint ventures, qualified small operators are allowed to join large contractors or banks to compete with traditional concessionaires

Prequalification Documents Information to Be Provided by the Client Demand forecasts with the estimated revenue and demand elasticity Progress on various critical actions relevant to the project Scope of the proposed concession An outline of bid selection and evaluation criteria

Main Requirements to Prequalify Candidates The financial, technical, and managerial capacity Expertise to build, finance and operate the facility Experience of bidding successfully for similar concessions and mobilizing project finance Demonstrated commitment and competitive enthusiasm to participate in the main bidding process Experience in the host country

Prequalification Advertising Notice requesting expressions of interest to pre-qualify to be published locally and internationally Investor feedback Meeting with selected potential investors/ concessionaires (“Road Show”) Public information Information dissemination on the financing and construction of the proposed project Pre-qualification documents Should include financial and operational criteria to ensure bids are invited from only qualified candidates

Examples of Prequalification Criteria Country Transaction Prequalification Procedure Technical Criteria Financial Criteria Mexico Concession of rail freight lines Registration through written statement of interest; authorization of registered parties by the Ministry of Communications and Transportation based on uniform criteria Demonstrated legal, technical, and administrative capacity Demonstrated financial capacity Hungary BOT for toll road Invitations for prequalification based on approved preliminary design plans evaluated by expert assessment committee Capacity of bidders to design, build, maintain, and operate toll road Capacity of bidders to finance road without state aid Source: Kerf and et al. (1998)

Prequalification Procedure Pre-qualification for the St. Petersburg Western High Speed Diameter Motorway Country Transaction Prequalification Procedure Technical Criteria Financial Criteria Russia Concession for the Design, Construction and Operation of the WHSD Motorway Estimated Cost: Euro 3 billion Registration through submission of application and relevant documents, following a deposit of 500,000 Rubles Deadline for submission: 28 February 2007 Minimum experience: Two 10 billion-ruble road construction projects Operation of two toll motorway concessions, minimum 30 km, 20,000 pcu/day Ruble 60 billion minimum annual turnover Experience in mobilizing finance for PPP No bankruptcy proceedings Source: http://www.whsd.ru

Designing Performance Indicators While in the Prequalification Process Clients should design performance indicators that assist in the supervision of the concession Indicators Expansion of the service to be provided under the concession The quality of the technical operation of the system The quality of maintenance of concession facilities The quality of attention to customers The consistent economic and financial soundness of the concessionaire

The Bidding Process Bidders should be given enough time (e.g., three to six months) to prepare their bids, depending on the complexity of the project and the levels of detail required During this period the Client should promptly answer bidders’ questions and comments on a consistent and open basis The Client should hold a pre-bid conference to provide bidders with information on the government’s expectations, clarifications New information should be provided to all bidders Governments should address the inconsistencies and issues identified by the bidders in the bid documents and amend the documents accordingly

Bid Documentation Contents A detailed definition and description of the project A draft concession schedule A technical performance specification (both construction and operations) Any other key agreements (e.g., details on the government’s proposed support for the project) Details on any external support agreed for the project (e.g., IFIs)

Bid Documentation The document should contain: Bidders should be made aware that the information is provided in good faith and the government shall not be liable contractually for the information The document should contain: Detailed, independently validated underlying demand forecasts and revenue projections, with assumptions and methodology used Survey reports including detailed soil or ground condition tests that may be relevant; detailed environmental assessment of the project Information on existing and proposed legislation that will affect the project (e.g., environmental regulations or guidelines)

Proprietary Information Ownership of all data, materials, and documentation originated and prepared by a bidder shall belong exclusively to the Client and be subject to public inspection Trade secrets or proprietary information shall not be subject to public disclosure. However, the bidder must invoke the protection of the Law either before or at the time the data is submitted The specific words, figures, or paragraphs that constitute trade secret or proprietary information must be identified The classification of an entire proposal document, line item prices, and/or total proposal prices as proprietary or trade secrets is not acceptable

Evaluation of Bids Bidders’ proposals are more likely to match the government’s critical objectives if the evaluation criteria are precise and transparent This also enables the Client to evaluate tenders easily and rapidly The bids should be evaluated based on the criteria specified in the bid documents

Defining the Successful Bidder Objective: Selecting the bidder who offers the best proposal, according to the bid documents When the concessionaire might seek to impose charges in return for the services provided Assess the cost to the government of the charges required by the concessionaire over the concession period This can be done by calculating the present value of the charges imposed by each bidder The lowest evaluated bidder in this case will be the bidder who offers the lowest present value of the charges

Technical Evaluation Some Criteria Whether the bidder’s technical and management proposals are likely to meet the requirements of the performance specification Technical and design risks of the proposals The proposed construction timing and the likelihood of its attainment The proposed operating and maintenance procedures and the likelihood of their attainment

Technical Evaluation Evaluation of technical aspects relating to the construction and operating period could be simplified by: Specifying stringent technical standards Providing for penalty points to be given for noncompliance Adopting prequalification Only proposals that meet the required technical standards should be put forward for a financial evaluation

Financial Evaluation The Client must assess the credibility of the commercial and financial aspects of the bidders’ plans over the concession period The underlying assumptions in each bid should be strictly reviewed Track records of the bidders’ sponsors, financial advisors, and supporting financiers should be assessed The credibility of a bidder’s proposal will be assessed with respect to the bidder’s own capital structure and the sources and availability of funding

Final Selection of the Successful Bidder Recommended Approach: Apply the formula or formulae provided in the bid documents and obtain the numerical assessment for each bid that passed the technical and financial evaluations The bidder with the best score, according to the terms of the bid documents, should be declared the successful bidder Prepare a Bid Evaluation Report Invite the successful bidder for negotiations

Final Concession Contract Points to Include: The definition of the services to be provided by the concessionaire under the contract The concession area The rights and obligations of the Client and concessionaire The performance indicators of the quality of the service The regulations to be applied The power of the regulator to inspect installations and books

Renegotiation Why Renegotiation? The concession designs and regulations are incomplete The conditions in the original contract are largely changed Governments interfere with contract clauses Cost of Renegotiation Undermines the competitive bidding process, consumer welfare, and sector performance Increases public opposition to PPP Compromises the credibility of the reform program Source: Guasch (2004)

Unsolicited Proposals to Governments Origin of most controversial private infrastructure projects In theory, generate beneficial ideas In practice, some unfavorable experiences; attempt to avoid competition; exclusive negotiations behind closed doors Usually sole-source negotiations take much longer than expected

In summary… Avoid, to the extent possible, unsolicited proposals Renegotiations may undermine the competitive bidding process Competitive bidding leads to efficiency and economy. ICB better for larger projects Consider a two-stage bidding procedure for complex projects

Thank you!

Suggested steps to select the concessionaire Carry out prequalification The Grantor provides the prequalified bidders information on the concession as complete as possible (e.g., traffic studies, geometric and structural preliminary design, preliminary design of toll collection facility) to avoid the bidders incurring unnecessary time or expense seeking for clarification, and to enable them to meet the government’s requirements The bid documents should include a statement that all such information is provided in good faith and the Grantor shall not be liable contractually for such information The bidding documents should include the requirements for horizontal and vertical alignments (including, for example, minimum height in tunnels, minimum clearance under bridges), number of traffic lanes, the level of riding quality to be provided by the Concessionaire during the life of the concession (e.g., maximum acceptable roughness of IRI not greater than 2 m/km), and any other parameters considered essential

Suggested steps to select the concessionaire The bidders offer comments on the bid documents The Grantor reviews and may prepare addenda to the bidding documents, including revisions to the technical requirements made in the light of feedback from the bidders The Grantor invites the bidders to submit their technical and financial proposals The bidders offer bids containing their final technical proposal and a financial proposal The Grantor evaluates the technical proposals on a pass-fail basis, and selects those technically satisfactory bidders for evaluation of their financial proposals The Grantor evaluates the financial proposals, according to the method specified in the bidding documents (for example, net present cost to the Grantor, or specific evaluation formulae), and selects the successful bidder

Some Basic References Guasch, J. Luis (2004). “Granting and Renegotiating Infrastructure Concessions Doing It Right.” Washington, D.C.: World Bank. http://www-wds.worldbank.org/servlet/WDSContentServer/WDSP/IB/2004/05/06/000090341_20040506150118/Rendered/PDF/288160PAPER0Granting010renegotiating.pdf World Bank (2004). “Guidelines: Procurement Under IBRD Loans and IDA Credits.” (May). Washington, D.C. http://siteresources.worldbank.org/INTPROCUREMENT/Resources/Procurement-May-2004.pdf Queiroz, Cesar (2005). “Launching Public Private Partnerships for Highways in Transition Economies.” Transport Paper TP-9. (September). Washington, D.C.: World Bank. Kerf and et al. (1998). “Concessions for Infrastructure: A Guide to Their Design and Award.” Technical Paper no. 389. World Bank (1998). “Bidding for Private Concessions. The Use of World Bank Guarantees.” RMC Discussion Paper Series, no 120. Washington, D.C.

More Basic References World Bank Infrastructure and Law Website http://go.worldbank.org/NT9MT0XLS0 E18 Muurla–Lohja Motorway Project, Finland http://alk.tiehallinto.fi/e18/english/index.html Bar–Boljare Motorway Project, Montenegro http://www.vlada.cg.yu/eng/minsaob/index.php?akcija=vijesti&id=160129 St. Petersburg Western High Speed Diameter Motorway, Russia http://www.whsd.ru/index.php?lng=en&page=3 Queiroz, Cesar and Ada Karina Izaguirre. 2008. “Worldwide trends in private participation in roads: Growing activity, growing government support.” Private Participation in Infrastructure Advisory Facility (PPIAF) Gridline Note No. 37. Washington, D.C. http://www.ppiaf.org/documents/gridlines/37trends_private_participation_in_roads.pdf

Cesar Queiroz Road and Transport Infrastructure Consultant World Bank, 1818 H Street NW Washington DC 20433 USA Tel +1 202-473 8053 Email: cqueiroz@worldbank.org