1 FY 2006 Department Overview Presentation Sal Chiarelli, Director of Physical Plant July 19, 2005.

Slides:



Advertisements
Similar presentations
THE LUBRECHT REPORT: A MID-WAY ASSESSMENT OF THE 10 -YEAR WILDERNESS STEWARDSHIP CHALLENGE Developed By: The Wilderness Advisory Group April 2010.
Advertisements

B O R N T O L E A D. Department of Facilities Management Strategic Planning Update December 6, 2005.
Department of Environmental Quality Environmental Management System Overview.
October 7, 2014 A Presentation to the Caddo Parish School Board by: Evergreen Solutions, LLC.
A relentless commitment to academic achievement and personal growth for every student. Redmond School District Graduates are fully prepared for the demands.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
The Pit Crew: Strengthening the M&O and Facilities Parthership APRIL 3-6, 2013, LONG BEACH, CA.
Revised: 11/08/2010 Environmental Health & Safety (EH&S) Management David L. Patterson Director, Environmental Health & Safety Cal Poly Pomona Web:
1 Institutional Support Services Capital Project Process.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
Facilities Management and Planning Horace Bomar, Director November 1, 2011.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
University of California New Business Architecture Project 2010 Jan00 meeting notes.doc April 15, 2004 Accelerating the New Business Architecture UC Employment.
College Strategic Plan by Strategic Planning and Quality Assurance Committee.
Integrating work flows of five utilities utilizing Oracle’s WAM
The Necessity of Collaboration A State-Wide Plan Ray Walker CIO UVU.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Developing A Comprehensive Facilities Plan At UVM Sal Chiarelli, Director of Physical Plant, UVM.
Clean Cities / 1 COALITION NAME Workplace Charging Challenge Presenter Title Date.
Workplace Charging Challenge / 1 Organization Name Workplace Charging Challenge Presenter Title Ambassador Organization Date.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Energy Management System (EnMS) Awareness
City of Edmonton Strategic Approach to Environmental Management Office of the Environment.
Saint Charles, IL IASBO Facilities Management Committee Presentation 1 What Don’t I Know About Facility Management ? 60 th Annual Conference.
The Training Needs of University Sustainability Managers David DuBois, PhD The Social Design Group Cathy DuBois, PhD Kent State University Presented at.
Passion and performance on every page. Sustained Solutions from Webcrafters, Inc., an Original MPower ChaMpion October, 2012 Jac Garner, CEO, Webcrafters.
Presented by: Sal Chiarelli, Director of Physical Plant Panel: Terry Robbins, Facilities Zone Manager, Davis Zone Andy Galaczy, Senior Plumber, Davis.
1 Physical Plant Department Organizational Needs Presentation Sal Chiarelli, Director of Physical Plant March 14, 2007.
Managed Competition: Part of a Successful City’s Strategy Teresa Curlin City of Charlotte May 2007.
June 20, 2012 Outsourcing Physical Plant Should I ???
1 Professional Development Training – Enhancing the Delivery of Services Marcela E. Stanislaus facilitator Blackmon Roberts Group, Inc.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
Clean Facilities… Sustainable Solutions Local Touch… National Reach.
© Huron Consulting Services LLC. All rights reserved. © Huron Consulting Group Inc. All rights reserved. Neither Huron Consulting Group Inc. nor any of.
Resource Conservation Program November 2003 Kelley Gonzales Resource Conservation Manager.
1 Strategic Thinking for IT Leaders View from the CFO Seminars in Academic Computing Executive Leadership Institute.
Department of General Services Strategic Capital Asset Management (SCAMP) “You Can’t Manage What You Can’t Measure” COUNTY OF SAN DIEGO.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
Mooo’vin Forward In Vermont Developing A Comprehensive Facilities Plan At UVM.
The Year of the Customer FE&P Reorganization: Improving for Our Customers.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT (802) (802) fax
Bringing Facilities Certification to your School District Scott Mackall Director of Facility Management & Transportation Park Ridge - Niles School District.
Alliance Texas Small Business Fair GSA, PBS Fort Worth, TX June 26 th, 2008.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
African Regional Director
Organizational Study of Inspectional Services City of Springfield, Massachusetts February 21, 2008.
FMDG FMDG at Virginia Tech: A Synergestic Approach Virginia Tech Facilities Managers' Development Group : A Synergistic Approach Dawn Maxey, Facilities.
DOE ASSET MANAGEMENT PLAN
Embedding Carbon Management within Public Sector Organisations 17 th November 2015.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
H. Authoring Division Name File Name Security Notice (if required) H Agenda - 8:30 am Aptos room Team and Planning Meeting Schedule for Monday and Tuesday.
FACILITIES MAINTENANCE PLANNING
Budgeting 101. Class Activity Describe what you think the school district budget process looks like – steps and time lines. Completing some of the steps.
. 1.  EH&S Strategic Plan ◦ Review Mission, Vision, Values ◦ Strategic Objectives  Projects and Action Plans to support Objectives  Aligning Working.
1 COALITION NAME Workplace Charging Challenge Presenter Title Date.
Estates across STFC This presentation is to give PPD the opportunity to respond to proposals for the future management of Estates across STFC The proposals.
Office of Facilities & Property Management STEPHEN SALBER, DIRECTOR.
GENERAL MOTORS ENVIRONMENTAL MANAGEMENT SYSTEMS Al Hildreth, Global Energy Manager May 29, 2014.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
FACILITIES SERVICES NEW EMPLOYEE ORIENTATION. FUNCTION OF FACILITIES SERVICES  Facilities Services has 55 full time employees who are responsible for.
A Risk Based Approach to Asset Management of Alcoa’s Civil Infrastructure in WA Presented by DENNIS FOO, Industrial Maintenance Roundtable ( IMRt )
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Town of Watertown Staffing and Operational Assessment of the Public Works Department September 10, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
The University of Vermont Physical Plant Overview
Phoenix Public Works Support Services
Technology Department Annual Update
Montana State University - Administration and Finance
Brian Robinson, Deputy HR Director
Presentation transcript:

1 FY 2006 Department Overview Presentation Sal Chiarelli, Director of Physical Plant July 19, 2005

2 Physical Plant Department 255 Employees Heat Plant(11) HVAC(16) Controls(5) Plumbing(12) Electric shop(11) CPR Shop(18) Custodial(102) TCO Asbestos/Lead(10) Automotive (3) Medical Complex(13) Recycling Sol. Waste(6) Administration(13) Energy Management(1) Service Ops.(2) Material Management(3) Grounds/Moving(16) Project Management(2) Med. Complex Proj.(6) Trinity(5)

3

4 Internal Partners (customers) UVM Staff UVM Faculty UVM Administration Students Residential Life Parking and Transportation Police Services Athletics Risk management Campus Planning Architectural/Engineering All other AFS departments.

5 Customer Expectations Be invisible Like a utility I paid already (grants 50%) Varies according to the individual Be right over service Everything is an emergency Sometimes there is little or no planning

6 External Partners Local Utilities, VGS,BED,BPW State Organization APPA,NECERAPPA FAHC City of Burlington Vendors/Suppliers A/E Firms Contractors

7 Some Current Physical Plant Issues Deferred Maintenance Longer hours of operation More events/set ups. (not staffed for this) Research requires less tolerance for down time Energy efficiency Higher than average turnover Limited space for implementing zone maintenance New codes/regulatory requirements eat at the budget. Operating dollar increase is creating a buying power issue Significantly less management of the Physical Plant as a result of cuts.

8 What Else Is Making Our Jobs Challenging More Research facilities Longer hours All spaces open to all people Eating/drinking normal More access to food and drink More utilization of space Everyone wants Air Conditioning There is a general feeling that all services should be free Building are getting older Newer buildings are more sophisticated Limited hiring pool in our area Construction/capital projects eats up PPD resources Limited IT resources in AFS

9 Where do we use technology FAMIS KRONOS Boiler controls Energy Management Card Access Thermography Building Automation Text Paging Cell Phones Predictive Maintenance Gas Purchasing Elevator Controls Water Treatment Metering Invoicing CADD All Typical Office Applications Many other areas

10 How Have We Changed The Department Self Study Increased Communication Increased Visibility Job Order Contracting FAMIS KRONOS NEXTEL Paging Boiler Control System Facilities Assessment

11

12 The goals for the project are as follows: Capture the relevant historical information Provide new information about customer satisfaction, employee issues, staffing, industry changes and innovations; Identify opportunities for increasing efficiency within the department; Develop priorities that will clarify funding requirements for the department and assist in the budgeting process; Develop an understanding of the external and internal drivers that force choices and changes within the department; Make recommendations for change and innovation for programs and services; Develop a replicable process that also increases the capacity of the staff to undertake similar studies in the future; Identify the consequences of not taking specific action or making sustainable changes; and Improve the department’s morale by creating a participatory process of self-study.

13 How Did We Get Info Focus groups –Faculty –Students –PPD Staff –Colleagues Surveys SWOT History Other Institutions APPA Current Database WO system Wellness Survey PPD Customer Surveys

14 S.W.O.T.’s Strengths (Internal)Weaknesses (Internal)Opportunities (External)Threats (External) Campus Location Customer Service Employee Expertise and Dedication Well-respected work force Knowledgeable leadership Diverse Work Force Team Work Customer Feedback Campus Location Preventive Maintenance Loss of Corporate Knowledge Lack of Centralization Formal Training Program Communication Deferred Maintenance Organizational Structure Performance Measures and Accountability Employee Recognition Morale Inadequate Financial Resources Information Technology (IT) Undefined Priority Management Financial Systems & Tools Bench marking with similar institutions Partnering (Utilities, Services and Purchasing) Creative Financing (Grants, Loans and Bonds) Utilizing Faculty (Staff Development and Technology) Centralization of Similar Campus Services Outsourcing Customer Input Senior (Upper-administrative) Level Direction Change of Customer Expectations Utility Deregulation Outsourcing Insufficient Funding Code Compliance Issues Media (Television, newspaper and radio) Changes (Technology, Environmental and Socioeconomic) Legal Issues (Personnel and Environmental) Changes in Upper-administrative, senior positions Wages and Salaries not competitive Unforeseen expenditures (Personnel and projects) Key Personnel Retiring Institutional Competition Customer Dissatisfaction Utility Cost Fluctuations Common Denominators

15 Strategic Planning Re-evaluate our mission Create our Vision Develop goals Create strategies to reach goals Align with the University

16 Mission To maintain facilities, perform related services and provide responsible stewardship of the University of Vermont’s physical assets in support of the University’s mission.

17 Vision To be a highly effective facilities organization through: –Continuous improvement and innovation –Maximizing resources –Encouraging employee growth and job satisfaction –Promoting the values of UVM’s Common Ground and supporting the needs of the Campus Community

18 Benchmarking/Surveying

19 Outsourcing Of Services ‘01 Data

20 Services Analysis Charts Page 97 SS

21 Physical Plant (Non-Utility) Budget Cuts Over The Years. This equates to approximately 21% of today’s budget YearRescission/Cut TOTAL (06)$3,359,094 Cumulative Total Over The Years. Lost Spending $36,581,000 Today’s Dollars lost Spending Over The Years $59,745,000

22 Some Regulatory/Code Issues That Have Forced Change ADA Elevator Life Safety Carbon Monoxide Historical Preservation Asbestos Abatement Lead Mold/Fungi Pesticide Application Energy Codes Backflow prevention Spill Prevention Underground Storage Tank Asbestos Awareness Bloodborne Pathogens Radiation Safety Personal Equipment Protection ADA FMLA Confined Space Lock-Out Tag-Out Right To Know (Haz Com) Fall Protection Respiratory Protection

23 Some Departmental Licensing/Certifications Back Flow Prevention Electrical Joureyman Electrical Master Electrical Apprentice Plumber Apprentice Plumber Master Plumber Journeyman Natural Gas Certification Air Cond/Refrigeration Fire Alarm T-1 Fire Alarm TQP Professional Engineer Refrigerant Processing Lead Inspector Lead Contractor Entity Asbestos Inspector CDL Driving Fuel Oil Installer Operating Engineer Pesticide Asbestos Project Designer Asbestos Entity Asbestos Project Monitor

24 SOURCES OF FUNDS (2005) SOURCEAMOUNT General Fund21,535 Parking and Transportation365 Residential Life4,235 Bond Money (One Time Dollars)7,875 Departmental Projects1,130

25 Breakdown By Unit (05 Dollars) Shop/UnitAMOUNT (1000) Heat Plant725 HVAC/ Plumbing2,600 Controls CPR Shop1,415 Custodial3,975 Electric895 TCO Asbestos/Lead850 Automotive200 Medical Complex Projects Grants Administration1,400 Energy Management Project Management Service Operations Medical Complex Maintenance 1,350 Recycling Solid Waste600 Material Management100 Grounds management1,700 Utilities/Other11,455 TOTAL$27,265

26 Example of the complexity of 1 units responsibilities. (Hand Out) Grounds Tasks

27

28 Energy Conservation Pro-active Working with departments Formed a Utility Team More proactive in repairs Working with utilities Real time metering Get message out to students/faculty/staff

29

30 Some Actions Taken As A Result Of The Study Customer Focus Maintenance specialists Building contact person Road show Mastering the maze Surveys Monthly meetings/visits Building contact info sessions FAMIS

31 Some Communication Improvements Deans/Department Heads Unit meetings Cell phones Getting people out- seminars, training etc Emergency Logs Required Lists ESL Translators Bosnian/Vietnamese Web Site Services Day Lunch Annual report

32

33

34 Creating A Team Atmosphere Walk around Show up Discuss issues Support from the top Everyone is important All hands meetings Bring people to shops Dept heads come to meetings

35 All Hands Meeting Everyone attend Presentations of accomplishments Give people a chance to show off Get the message out Part of the big picture Invite guest speakers

36 Sharing Information/Resources More valuable if you share People holding back No interdepartmental sharing of resources Types Prints, specs, databases, vendors Look for best practices

37

38 Custodial Vendor Managed Inventory University Of Maryland Model Goals –Reduce inventory –Stop complaints –Let custodians/supervisors work –Standardization Solution –Looked for best practice –Vendor managed inventory

39 Business Partners Long term commitments Team approach Responsibility Help us reduce waste Assist with best practices

40 Facilities Standards One of everything on campus No consistency Negative impact on operations costs Not intended to limit design intent Partnering with A/E to create final document (Dartmouth Model)

41

42 Utilities Master Plan What are the opportunities Tri-generation (electric/steam/chilled water) Own more of our infrastructure Central chilled water plant Capacities Plan the campus Reduce demand Spend less per square foot as the campus grows

43 Facilities Management Software (FAMIS) Space management Work control Capital Projects Key Control Inventory Wireless interface Scheduling

44

45 Event and Room Scheduling Duplicates Conflicts 1000/1000/1000 Consistency Revisions Scheduled maintenance Block out rooms Hiring new position (PPD Events Coordinator)

46

47

48

49

50 Project Management Facilities condition audit New project management position Charge projects New project management module Consistency Job Order Contracting

51 Time and Attendance Computerized Free up resources for other use Fair Flexibility Reporting

52

53 Some Results So Far Accountable Reinvest in department/university Prioritization More proactive less reactive Better trained Less Down Time Participatory Process Highly effective Agile Reduction in emergencies and recurring problems Improved morale (in some areas) /reduce turnover