Springfield Metro Sanitary District's new Spring Creek WWTP project benefits from managing project information electronically.

Slides:



Advertisements
Similar presentations
Internet Contracting Estimating and Accounting System ICEAS Multi-Client Software Presented By: I C E A S.
Advertisements

Sustainability Implementing Sustainable Practices for Productivity Enhancement for Productivity Enhancement Presented by Ryte Byte, Inc.
A Producer’s Guide to Chubb’s SMART Application Platform
Capital Improvement Program City of Snoqualmie Public Works Department.
“Upgrading the collection and wastewater treatment system in Ploiesti City”
HURRICANE SANDY PASSAIC VALLEY SEWAGE COMMISSION AIR MONITORING PROJECT JEFF MEYER NORTHERN REGIONAL OFFICE AIR COMPLIANCE AND ENFORCEMENT.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
REDUCING BURDEN WHILE INCREASING QUALITY AT A GOVERNMENT AGENCY David A. Marker (Westat), Mary K. Dingwall (Westat), and Marla D. Smith (U.S. EPA) Presented.
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
0 Scoring Community Development Block (CDBG)Grants Water/Sewer Apps April 8, 2013 SEIRPC CDBG Scoring Committee.
Montana Builders Exchanges. Montana’s Pipeline to Bidders.
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Demonstration of Energy- Efficient Developments. Experience the Power of DEED.
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc.
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc. Ozette Brown, BidX Product.
Trimble Connected Community
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Skanska Scholarship at University of Portland Skanska USA
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
© Dr. John T. Whiting All Rights Reserved Slide 1 The Rationale for Integrating IT Assets into the Strategic Business.
Imaging, Document Management and the Future Nick Zinser Northeastern University Jim Slattery The College Board MASFAA Conference 2002.
Introducing Paperless Bill Management and Accounts Receivable Processing.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
Welcome to Lunch & Learn Simplify Your Digital Workflow with Smarter Solutions.
Project History Town of Newport Population: 550 Vermillion County Seat.
Youth Ambassadors & Site Liaison Training. How does the partnership between my site and Connecting Generations work? The AmeriCorps member is the bridge.
A Web Based Workorder Management System for California Schools.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Leveraging Web Based Collaborative Project Management Applications- the CM’s perspective Michael Warriner, P.E.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
DHHS COE Meeting Agenda May 19, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Grants and Contracts Jim Butterfield and Kathy Blackwood October 5, 2004.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
DHHS COE Meeting Agenda February 11, 2010 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
The Benefits of Mobile Electronic Inspection Tools 12/11/2015 Presented to:
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
DHHS COE Meeting Agenda February 16, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update Group Exercise.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
Component D: Activity D.3: Surveys Department EU Twinning Project.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
WASTEWATER TREATMENT IN BULGARIA STATUS AND CHALANGES ORLIN DIKOV – INFRASTRUCTURE CONSULTANT.
CTC 450 Review WW Sludge Processes.
EServices represents all the components of New Castle County’s new online plan review system for users to submit Land Development and Building plans and.
Green Line Extension Project
Drinking Water State Revolving Fund and Performance Based Infrastructure Janet Cherry, PE Office of Drinking Water.
Sun City Lift Station Odor Control Improvements
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
COSCDA Program Managers Training Conference 2015
City of Noblesville Wastewater Utility
North Carolina’s Transition to CMDP
Electronic Products Workshop Division of Air Resource Management -DEP
Your Facility Your Information
Indiana Department of Environmental Management Office of Water Quality
Construction Management Services April 16, 2018
Presentation transcript:

Springfield Metro Sanitary District's new Spring Creek WWTP project benefits from managing project information electronically

PRESENTERS Gregg Humphrey PE, PLS Director/Engineer with the Springfield Metro Sanitary District Christy Crites PE – Construction Administrator with Crawford Murphy & Tilly MODERATOR Eric Law Founder & CEO of EADOC

Springfield Metropolitan Sanitary District's Spring Creek WWTP project SMSD along with Crawford, Murphy & Tilly are using the EADOC web based project management application to manage the four phase, 3 year, $125M construction of the new Spring Creek WWTP project. Owner perspective

SMSD – THE EARLY YEARS

The Springfield Metro Sanitary District was formed in 1924 under the Sanitary District Act of 1917 to provide sewage treatment to Springfield, Illinois. At that time, all of the 66,000 residents were discharging their sewage directly to Spring Creek that ran along the northwest perimeter of the town. Concern for public health drove the residents to create an entity to collect, treat and discharge the communities sewage. History of SMSD Wastewater Treatment Plant Improvements Owner perspective

The Spring Creek facility began construction in 1926 and was completed in 1928 and put into operation in Numerous plant expansion and renovations have been completed from 1928 through In 1973, a second treatment plant was constructed which divided the original plant’s service area into two planning areas. Beginning in the mid 1970’s, surrounding municipalities began pumping their waste streams to SMSD for treatment. This trend continues as more stringent effluent requirements are added to communities discharge permits. The District foresees continued interest from other surrounding communities. Owner perspective

In 2005, the Illinois Environmental Protection Agency notified the SMSD they were hydraulically and biologically overloaded at both the Spring Creek WWTP and the Sugar Creek WWTP. SMSD retained Crawford, Murphy & Tilly, Inc. to prepare a study proving that the treatment facilities were adequately treating the additional flow and biological loading while maintaining effluent quality within the limits of their discharge permit. IEPA approved the plan and rerated the treatment facilities with the stipulation that SMSD begin the planning process for plant improvements.

Owner perspective It was agreed the oldest facility, the Spring Creek Plant, would be designed and completed first and then renovations to the Sugar Creek Plant would follow. Following the rerating, SMSD and CMT began the planning process. Existing facilities were evaluated for expansion and plans for a green grass facility were studied. The plan was approved by IEPA and design of the Spring Creek facility began. The planning process projected in 2030, SMSD would be serving approximately 143,000 people and require an average capacity of 32 million gallons per day (MGD) with a peak treatment capacity of 80 MGD

Planning for Growth & Expansion Present Westward Expansion White Oaks Mall South of I-72/Lake Area Rochester and Sherman 1976 Study 1988 Study Spring Creek Plant Sugar Creek Plant West Side Trunk Lift Station 2000 Study

Owner perspective The construction of the Spring Creek Plant was divided into four phases to maximize Illinois Environmental Protection Agency State Revolving Loan funds which provides low interest rate loans. Phases 1 and 2 bids were taken in July River City Construction from Peoria, Illinois was the low bidder on both phases of construction and was awarded the work. Phase 3 bids were taken in February Plocher Construction from Highland, Illinois was awarded the work. Phase 4 will bid in As construction neared, CMT approached the District about using a construction software package.

THE PLAN: Spring Creek SMSD – Spring Creek SITE LAYOUT PLAN December 2007 Design Development (as proposed) Back up Generators Disinfection Aeration Tanks Secondary Clarifiers Primary Clarifiers Administration Building Headworks Operations Building Sidestream Treatment Cannibal * Sludge Thickener * * * * Anaerobic Digesters * Excess Flow Treatment * Existing Buildings to be reused as maintenance storage

Owner perspective Benefits of the software during the construction process: Receive notification of all construction paperwork Keep up-to-date on responses to RFIs, new Field Orders, submittals, daily field logs Shop drawings are available for review by Owner and Staff Change Orders are tracked and reports available Financial information is continually tracked and the financial status of the project is known at all times. The software has streamlined the process of multiple phases of construction with different contractors and all the documentation generated by the construction process.

Construction Manager/ Design Engineer perspective

Why use an internet based construction management solution?  Multiple phases of construction on one large project mean multiple prime contractors.  Multiple phases of construction occurring at the same time with multiple prime contractors means lots of paperwork and coordination.  Multiple engineering design subconsultants requiring access to information in a timely manner.  Multiple offices of lead designer requiring access to information in an up-to-date fashion.

Construction Manager/ Design Engineer perspective Evaluation of Software  Evaluated several software packages to determine which package matched our requirements for:  Ease of use, this was the most important selling point  Internet based package for off-site accessibility  Complete Financial package  Fast technical support  Customization  CMT checked references and found EADOCs received high praise for ease of use and quick response to questions and any needs for customization.  Evaluated ease of use by using a tutorial and found program to be intuitive and easy to understand.

Construction Manager/ Design Engineer perspective A Team Approach  CMT has offices in St. Louis, Indianapolis and Springfield involved in the design and construction.  Four design sub-consultants were under contract to continue support services throughout the construction phase.  Three field trailers would be onsite and need construction information in a timely manner.  Providing an efficient means of sharing information with all parties of the design/construction engineering team was critical.  The internet based approach with all of the paperwork submitted electronically was the best approach.

Construction Manager/ Design Engineer perspective Benefits to the Engineering Team Ability to forward a request for information (RFI) to design staff with a few key strokes and monitor progress through viewing the history.  Multiple disciplines are able to review shop drawings and merge the responses to create a final response package to the contractor even when the review staff and the contractor are in multiple locations.  Send information to field offices with a key stroke. Expedites delivery of construction paperwork and submittals.  Saves money on shipping submittals back and forth and reduces effort to markup multiple copies of submittals.  Access to the information anywhere and anytime.  Filing of paper documents is greatly reduced, only file documents requiring signature and final submittals

Construction Manager/ Design Engineer perspective Challenges for the Engineering Team  New processes, getting everyone trained on the program.  Some front end work to upload all information.  Getting stable internet connection at the job site for field staff which is consistently fast enough to download and upload information.  Getting everyone on the team to use the program as it is intended.

Construction Manager/ Design Engineer perspective Phases 1 & 2 bid July 2009 and have the same prime contractor. Phase 3 bid February 2010 and now we have a second prime contractor on board.  Both prime contractors were eager for an electronic submittal process.  EADOC hosted a training session for Phases 1 and 2 training both the design staff and the contractor.  CMT was able to provide training for the Phase 3 contractor after using the software for 9 months.  Both prime contractors have expressed satisfaction with the software package

Construction Manager/ Design Engineer perspective Benefits to the Prime Contractors  Quick means of submitting Requests for Information (RFI’s), submittals and proposals for change orders.  Reduces cost of shipping for submittals.  Expedites response time for questions since the answers are sent out electronically as soon as the RFI is answered.  Allows contractor to flag submittals that need to be expedited.  Meeting minutes are transmitted more quickly through EADOC than via mail.  Basically all communication is expedited and tracked.

Construction Manager/ Design Engineer perspective Challenges for the Prime Contractors  New and different.  Getting internet connection at the job site consistently fast enough to download and upload information.  Getting all supplier and subcontractors trained on program and using it correctly.  Making sure all involved parties have computer and internet access.  Some suppliers will not accept electronic submittals, but most accept the electronic version.  Software occasionally runs slow due to connection speeds.

Construction Manager/ Design Engineer perspective Achieve the Greatest Benefits  Learn and understand the features of the program.  Take advantage of training opportunities.  Utilize the features available.  Take advantage of the repository of information, specifications, drawings, memos, pictures,etc.  Get all stakeholders involved and utilizing the program.

EADOC Statistics Phase 1 started August organizations, 52 users 83 RFIs, 141 Submittals (25 day avg turnaround) 64 RFPs, 24 Change Orders Phase 2 started August organizations, 54 users 46 RFIs, 120 submittals (29 day avg turnaround) 59 RFPs, 26 Change Orders Phase 3 started December organization, 53 users 25 RFIs, 43 Submittals (11 day avg turnaround) 5 RFPs, 2 Change Orders

Questions Questions from the audience for the presenters? Contact Information Gregg Humphreys SMSD Christy Chrites Crawford, Murphy, & Tilly Eric Law EADOC LLC x704