LBT Q3 2007 Engineering Review DYB. 26-Oct-2007LBT Q3 2007 Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Decay Solenoid – what do we have to do to make it work?
Status of Vacuum Control System MACS week June 2011 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Engineering and Software Review ENGG Engineering General.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
LBT Q Engineering/Software Review ROTRotators.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
ELENA installation progress F. Butin / ELENA collaboration.
CBETA Technical Review
LIU Wire Scanner Milestones June 2017
PLC-based control systems at SOLEIL - ICALEPCS 2017
ATF2 Magnet Power Supplies
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
Status of the cryogenic system for B180
IBBelle: Status Commissioning at MPP Transport to KEK
First Assembled Rod in US
Xoserve IX Refresh Update
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Operator Training Requirements
Prototype cryomodule development
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
LCLS Undulator System Production Management
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
ODH Phase 1 Hazard Analysis, Monitor Placement, Installation Progress.
Teleconference ACS – FREIA 19th June 2017
Progress in the ITER Neutral Beam Test Facility
UPPSALA UNIVERSITY_GERSEMI PROJECT
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

LBT Q Engineering Review DYB

26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning Phase Vast majority of hardware and electronics installed. Vast majority of hardware and electronics installed. Bypass valves and level sensors still need to be installed. Bypass valves and level sensors still need to be installed. Pipe insulation work in progress Pipe insulation work in progress System test in progress. System test in progress. Software tests are in progress. Software tests are in progress. Current Completion Date is November 30th, 2007 (Slip from Nov 16 th due to late valves and sensors). Current Completion Date is November 30th, 2007 (Slip from Nov 16 th due to late valves and sensors).

26-Oct-2007LBT Q Engineering Review Open Issues Technical Technical Installation of bypass valves, level sensors, and vent lines in cable drape still pending. Installation of bypass valves, level sensors, and vent lines in cable drape still pending. Schedule Schedule Level sensors in customs should release next week. Level sensors in customs should release next week. Bypass valve delivery due 2 nd week of November. Bypass valve delivery due 2 nd week of November. Financial Financial None None Resource Resource Will need electrical techs to wire up level sensors. Will need electrical techs to wire up level sensors. Need mechanical tech help for installing level sensors and vent hose in cable drape. Need mechanical tech help for installing level sensors and vent hose in cable drape.

26-Oct-2007LBT Q Engineering Review Progress (Q3/2007) Procurement Procurement Mechanical Components ( Planned Sep) (Completed except for pump bypass valves, due in 2 nd week of November) Mechanical Components ( Planned Sep) (Completed except for pump bypass valves, due in 2 nd week of November) Pipe Insulation will be last item procured. (Completed in October) Pipe Insulation will be last item procured. (Completed in October) Electrical Components (Planned July/Completed in August except for level sensors.) Electrical Components (Planned July/Completed in August except for level sensors.) Software Development Software Development First cut of PLC Code (Planned July/Completed in August) First cut of PLC Code (Planned July/Completed in August) Bench Test (Planned July – Aug/Completed in September) Bench Test (Planned July – Aug/Completed in September) Changes made based on testing (Planned Aug/In progress) Changes made based on testing (Planned Aug/In progress) Installation Installation Tank Installation (Planned July/Completed in July) Tank Installation (Planned July/Completed in July) Electrical Installation (Planned Aug/(Completed in October) Electrical Installation (Planned Aug/(Completed in October) Will need to replace z-axis flowmeter cable with longer one due 2 nd week of Nov. Will need to replace z-axis flowmeter cable with longer one due 2 nd week of Nov. Piping Piping Select vendor/Issue Contract (Planned July) (Completed in August) Select vendor/Issue Contract (Planned July) (Completed in August) Begin Piping Installation (Sep 10) (Started on time and completed ahead of time) Begin Piping Installation (Sep 10) (Started on time and completed ahead of time) Piping Insulation (In progress 60% complete/planned to be completed in Oct) Piping Insulation (In progress 60% complete/planned to be completed in Oct)

26-Oct-2007LBT Q Engineering Review Progress Cont. (Q3/2007) Flowmeter Transmitters 24 V Box 480 V Box PLC Rack Y Vent Tank -Y Tank

26-Oct-2007LBT Q Engineering Review Progress Cont. (Q3/2007) Flowmeter Motorized Valve Pump Modified RH -Z-Tank Insulated Pipe

26-Oct-2007LBT Q Engineering Review Planning (Q4/2007) Procurement Procurement Bypass Valves, Level Sensors, Longer and Flowmeter Cable (2 nd week Nov.) Bypass Valves, Level Sensors, Longer and Flowmeter Cable (2 nd week Nov.) Installation Installation Insulation (Oct) Insulation (Oct) Bypass Valves, Level Sensors, and vent lines through cable wrap (Nov) Bypass Valves, Level Sensors, and vent lines through cable wrap (Nov) Commissioning Commissioning Software Tests (Oct ) Software Tests (Oct ) Commission Level Sensors and Calibrate Overflow Sensors (Nov) Commission Level Sensors and Calibrate Overflow Sensors (Nov) Acceptance Tests and Handover (Nov) Acceptance Tests and Handover (Nov) Documentation (Nov) Documentation (Nov)