Ventilation of the LH2 Target GHS In MPF-35: The target gas handling system (GHS), target cryostat, and part of the vent stack are covered by a tent that.

Slides:



Advertisements
Similar presentations
The Care and Feeding of Silane Art Garcia FM Global March 23, 2006.
Advertisements

G ENERAL C RYOGENIC S AFETY T RAINING 1 April 2010.
Carbon Dioxide Systems 1.Carbon dioxide properties 2.Storage 3.Uses 4.Limitations 5.Types of systems 6.Local Application 7.Total Flood.
North Carolina Crawl Spaces – Vented and Closed ACI Home Performance 2008 Melissa Malkin-Weber.
Fluid Mechanics.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building ®
1 Expansion Tanks. 2 3 Expansion Tanks WHY USE THEM TYPES LOCATION SIZING.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Fluid Mechanics 07.
AIR FLOW IN DUCTS Shaharin Anwar Sulaiman
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
Fluids Review.
Problems from old midterm 3
HCS Series Screw Compressor Packages. 2 HCS Series.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
TEAM MEMBERS: SKIP POND KENNETH SIMPSON
Examples Review for first exam. Learning Objectives for 1 st Exam Be able to define accident and loss statistics (OSHA Incident rate, FAR, Fatality rate)
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Enclosure Fire Dynamics
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
Butch G. Bataller Lecture on ChE 192
HVACR416 - Design Pressure Measurement Part 2. Pressure Measurement Several pressure measurements exist. They all measure the same things, the force of.
Fire vs. Water Flow. What’s the best size for an “attack line?”  Maximum flow  Maximum mobility  Speed-How fast and how much  Ease of deployment and.
DIFFERENTIAL MANOMETER
Specifying and Sizing Control Valves A design equation used for sizing control valves relates valve lift to the actual flow rate q by means of the valve.
Patrick Thornton, SNS/FPE June 9, 2008
NPDGamma - LH2 Target - Relief/Ventline Systems Seppo Penttila NPDGamma Project Manager Predicted A  =5x10 -8 We are aiming to 10% measurement.
Unit 2 Terms & Definitions.  Legal requirements designed to protect the public by providing guidelines for structural, electrical, plumbing, and mechanical.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
NFPA 31 Standard for the installation of Oil- Burning Equipment
The 2nd NPDGamma Experiment Safety Review - Liquid Hydrogen Target Seppo Penttila NPDGamma project manager June 09, 2008 SNS.
Constant Volume Regulators
Ben Larson 1 November th Avenue NE, Seattle, WA (206)
Barry's Advanced Construction of Buildings, Second Edition, by Stephen Emmitt and Christopher A. Gorse. © 2006, 2010 by Stephen Emmitt and Christopher.
Washington University ChE 433 Digital Process Control Laboratory Pressure and Level Control Lecture.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
Air Conditioning International Mechanical Code
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
MECHANICAL ENGINEERING FOR SYSTEM BALANCE ASHRAE MEETING 2/15/2007 NORTHERN NEVADA CHAPTER 126 MATT BRENNAN, TBE.
WILO MVI Vertical Multi-Stage Pumps Multi-Stage Pumps for Commercial, Municipal and Industrial Applications Presentation Date – Revised Sept 2006.
Objectives Finish air cleaner problem Measure ventilation rates Focus on smaller buildings.
Formative Assessment. 1. Water flows at m/s down a pipe with an inner diameter of 1.27 cm. If the pipe widens to an inner diameter of 5.08 cm, what.
Nitrous Oxide Properties Temperature (ºC) Vapor Pressure (Bar Abs.) Liquid Density (kg/m 3 )
Filter Sizing. Pressure drop determines filter size.
Ships Service Air System
SAFETY WITH CRYOGENIC SYSTEMS. Safety aspects 1. Physiological 2. Suitability of materials and construction 3. Explosions and flammability 4. Excessive.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
1 Pressure Reducing valves. 2 3 Fill Valve / PRV Pressure Reducing Valve.
Hydraulic System.
Day 3 Part 3 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
UITF ODH Assessment UITF Safety Review May 10, 2016.
Objectives - Air Distribution Systems -Diffuser selection -Duct design Reading Assignment: Chapter 18.
FLUID FLOW FOR CHEMICAL ENGINEERING Dr Mohd Azmier Ahmad Tel: +60 (4) EKC 212 CHAPTER 8 (PART 2) TRANSPORTATION SYSTEM.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
6.5 Recommended Velocity Of Flow In Pipe And Tubing.
Power – Energy Relationships
2 K Coldbox Safety and ESH
SABRE PoP Fluid Handling
HFM Test Station Main Cryostat
Stainless Steel Water Well Casing.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Real Solutions Product Introduction
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Presentation transcript:

Ventilation of the LH2 Target GHS In MPF-35: The target gas handling system (GHS), target cryostat, and part of the vent stack are covered by a tent that is ventilated by a 10” diameter duct outside of the building. At ER2: GHS is boxed to an enclosure that is ventilated outside of ER2. Sizing of the ventilation is effected by – because of the membrane purifier H2 flow is limited to 10 SLM. – supply pressure to the purifier is 200 psi. – after the purifier pressure is limited to 15 psid by relief valves.

H2 flow is limited to 10 SLM at 200psi

Sizing of the GHS ventilation line at ER2 - maximum H2 leak can be 10 SLM because of the flow restriction. - to stay below 2% H2 concentration level, we need 10/0.02=500 SLM (=18CFM) air flow through the enclosure. From fluid physics we have Stack effect -z = 45 ft height of the stack -  lb/cft difference in densities This gives to driving pressure  p = lb/sq ft from Ashrae nomograph for 8 ” pipe and 100 ft long we get air flow rate of 60 CFM.  H2 concentration in the enclosure will be always bellow 2% even in the worst-case incident. What is the requirement for the ventilation line -----> stainless steel pipe or just a duct?