AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.

Slides:



Advertisements
Similar presentations
Page 1 Koasis II Specifications & Operation. Page 2 1.System Design Map Water Tank Fertilizer Tank A Fertilizer Tank B Fertilizer Tank C Filter Automatic.
Advertisements

Small cryotrap – control rack Nov Piano temporale Mid Jan: RR Begin Feb:order of the cryostat May:cryostat on site, rack ready.
ILIAS WG1 meeting - Birmingham1 Cryogenic Trap Vs Brewster window & noise coupling through windows J. Marque.
HS-30 Hydrostatic Pressure Sensor Presented By Peter Ward Hydrological Services Pty Ltd.
Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
HEAT PUMPS.
VISION! HP CVT TRACTOR. VISION! /10 150HP CVT TRACTOR Engine : Caterpillar Rated 130ps Max. 150ps Transmission (CVT) 50km/h Front.
Piping and Instrument Diagrams
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
SINGLE-PHASE HOPPER LOADERS ENG. FEEDING SINGLE-PHASE FEEDER 2.
Hydronic Mechanical Controls
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
Test Mass Discharging System (TMDS) Design Review 20 Nov 2014 Rich Abbott, Dennis Coyne, Eddie Sanchez, Calum Torrie 1 LIGO-G v1.
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
NFPA 31 Standard for the installation of Oil- Burning Equipment
MarsⅡ On-Line UPS Series
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
1 VAC – Vacuum system modifications ERC telecon, 24Mar09 A.Pasqualetti for the VAC team.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
Stephen Schuh Vacuum Controls Hardware 27 February 2006 LCLS Vacuum Controls Hardware Meeting 27 February 2006.
Vacuum tests of the accelerating structure mock-up The main outputs of the tests would be the following: Feasibility of the assembly of the vacuum manifold.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
2004 South Carolina Dairy Products Contest Milker Parts Identification Study Guide.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
Hydraulic Kit (pump and tank) Pictures from prototype.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,
AdV-VAC meeting 21Apr’09 Agenda 1) results from the reviews (A.Pasqualetti) 2) present wbs, present project planning, baseline design (A.Pasqualetti) 3)
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
CUE – Make Any Pump an E-Pump
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Cryo Pump Limitations Recent operating issues with helium Mick Mann ANSTO – Lucas Heights - Australia.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
ET Vacuum System 3 x (low frequency cryo-interferometer + high frequency warm-interferometer) Baseline solution Build one detector, the other two will.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
18 MW TURBINE CONTROL PANEL
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Installation of the T600 at Fermilab
HYDRAULIC & PNEUMATIC CIRCUITS
Heat to air update August 9th, 2017.
1.3-GHz Cavity Vacuum Furnace at IB4
Proximity Cryogenics P&IDs meeting
Professor Robert L. Heider, PE
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Effective Methods to Test the Fuel Pressure Regulator in your Car.
Advanced Virgo – Nikhef tasks
1MB/sec streaming data out 32 data lines in 4 RS-232 ports Cryopanel
AdV - Internal Review of VAC subsystem
Periodical meeting about the 'control system ‘
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
Presentation transcript:

AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or 3 x pumps 4K 2Hz?) Remote_scroll 300mN Ions: DT or SR? Ions: IB or PR? Ions: MC pipe near MC tower Ions: near NI DN651 Warm=Narm DN400? _ SR, PR permanently connected to BS _ 5 ions groups to be used during data taking. Positioned near IB,DT,MC,NI,WI or PR,SR? Depend on link geometry...(5000l/s nominal) _PR suspension to be dismounted, viroles used for IB/DT (and filters also?) _ bench towers height /gas load shall increase, air too. 27K traps? Or just turbos? 77K traps? Installed on a 1000mm port, with a 500mm valve. _Two large new turbos fixed on ground floor near PR/SR to be used during commissioning (4000l/s) Turbo2_SR Turbo2_PR DN651 DN1000

Cryotraps 1of2, preliminary 2 systems like this one per each trap Manual valve CF with position indicator 2 gauges to be purchased, normally same to the ones we have, but not necessarily manual valve with position indicator Large valve / tower link Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters Automatic valve with position indicator 2 gauges Automatic valve with position indicator Local scroll and also remote scroll? Automatic valve with position indicator existing large valve, to be linked to the control PE RGA PI PE 2 TSP fil. sets Manual valve with position indicator New or from 0m/3000m? Not from NI/NE... vent Manual valve with position indicator

Cryotraps 2of2, preliminary. Cryogenic controls, pid for level control and external tank Electronics driver to be read (tbc) by remote, normally with a few low level output or rs232 or other Automatic proportional valve, with position indication (profibus...) Automatic valve to be linked to the temp control existing large valve, to be linked to the temp control Level 1 External Tank LN2 Electronics driver to be read by remote, normally with a few low level output or rs232 or other Level 2 PID PID level regulator to be read by remote, normally with a few low level output or rs232 or other. Could retransmit the level and valve status Temperature Some temp readouts to be acquired. The controller will have relays to close also valves in case of high temp alarms Pressure 1 Pressure 2 Pressure signals (2), normally 4-20mA, to be recorded Comments: add readouts of LN2 tanks pressures