UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Remediation of the Tuyuk Suu Tailings Pond “Appraisal of the Minkush.

Slides:



Advertisements
Similar presentations
Radiation Protection Legislation Stephen McCallum
Advertisements

Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Problem of Remediation of the Legacy Tailings Sites in Central Asia December 21, 1991 at a conference in Almaty, the Central Asian republics declared sovereignty.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
RELIABLE SUPPLIERS Supply Chain Management and Procurement policies in place Supply Chain Management and Procurement policies in place Register all suppliers.
Status Quo Assessment of Wastewater Ponding Systems.
January 20 th, BudgetActual% YTDChange from prior year Ad Valorem Taxes $ 36,469,256$ 27,782, %$ 1,020,143 Sales Taxes 10,781,313 2,638,615.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
DEPARTMENT OF MINES AND ENERGY Image positional only placement optional Washout feature in PPP 70/30 Daly River Management Advisory Committee - Katherine.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
IAEA International Atomic Energy Agency HPS Annual Meeting Current Situation and Future Challenges on Occupational Radiation Protection in Latin America.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina.
Suzanne Reister, Program Manager Paula Vanderpool, Program Assistant North Central Washington Workers’ Comp Trust Chemical Hygiene – Hazardous Chemicals.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Sultanate of Oman Oman Drinking Water Safety Plan.
TRP Chapter Chapter 4.2 Waste minimisation.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
First Technical Meeting on EMRAS II - proposal for a new working group / sub group Astrid Liland and Malgorzata Sneve, Norwegian Radiation.
1 “TRANSBOUNDARY WATER COOPERATION IN CENTRAL ASIA” Dr. Saghit Ibatullin, Chairman Executive Committee of International Fund for saving the Aral Sea.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
NATO Project Plan URANIUM EXTRACTION AND ENVIRONMENTAL SECURITY IN THE CENTRAL ASIAN REPUBLICS NATO Project Plan Project Duration 2 years.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
WM-2010, ENVIRONET section Phoenix 7-11 March 2010
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
UMREG2012 Meeting, IAEA, Vienna, November 7, 2012
“MAINTAINING ENVIRONMENTAL INTEGRITY IN MINING ” Tashana Redmond Senior Environmental Officer.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Needs and Assistance which can be provided Christian Kunze WISUTEC Wismut Umwelttechnik GmbH ENVIRONET Kick-Off Meeting Vienna, 23 – 27 November 2009.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Azerbaijan.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ESTONIA.
Institutionalizing Drinking Water Security: Making the Issues Real for Small System Capacity Development Joy Barrett Rural Community Assistance Partnership.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Regulatory Approach to Radioactive Waste Management and Remediation in Central Asia Tamara Zhunussova Vienna, IAEA, 6-8 November, 2012.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
56th Regular Session of the IAEA General Conference
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
“ OVERALL DECISION MAKING IN PLANNING FOR REMEDIATION OF URANIUM MINES” Presentation to the Senior Regulator’s meeting at the 56 th IAEA General Conference.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Republic.
Regulatory Framework for Uranium Production Facilities in the U.S.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
IAEA International Atomic Energy Agency. IAEA Dr. Abraham Gregorio de Rosa,Sp.Rad Radiologist in HNGV Dili, Timor Leste 2 Perspectives on regulatory models.
Nuclear Research and consultancy Group European Radiation Survey Site Execution Manual Leo van Velzen ENVIRONET Kick-off meeting Vienna 23 – 26 November.
SWANA - Saskatchewan Landfill Capital and Operational Costs By Steve Johnson M.Eng., P.Eng. November 2015.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
The Male’ Declaration Proposal for Phase III. Looking back to think ahead Policy Dialogue Background Materials Ministerial agreement Capacity building.
International Labour Standards INTERNATIONAL LABOUR STANDARDS ON OCCUPATIONAL SAFETY AND HEALTH Catherine BRÅKENHIELM ILO Expert OCCUPATIONAL SAFETY AND.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Tailings Dam Stability
Technical Services. Objectives To identify the technical services needed within the infrastructure for an effective implementation of regulatory programme.
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Safety and Regulatory Aspects of Remediation
Update of 2017 Activities of the ENVIRONET NORM Project
INDOT Storm Water Management
Radwaste: status & way forward
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Remediation of the Tuyuk Suu Tailings Pond “Appraisal of the Minkush Legacy Taillings Ponds and their Economically and Environmentally Balanced Remediation.” Alex Jakubick, UMREG with use of material provided by Isakbek Targoev, Kyrgyzstan and Don Metzler, USDOE

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Challenge and Constraints of Remediation of the Legacy Tailings Sites in Central Asia December 21, 1991, at a conference in Almaty, the Central Asian republics declared their sovereignty over their natural resources. Based on this declaration the legal responsibility for the U mining legacies is with the national governments of these republics. In most of the Central Asian countries the present state of legacy sites is in violation of their standing public health standards However, so far only Kazakhstan was able to fund a national remediation program of the legacy sites. The GNP of the other Central Asian countries is considerably smaller or insufficient to fund the remediation of the legacy sites from the national budget To commence remediation in Kyrgyzstan, Tajikistan and Uzbekistan requires international funding.

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 A Preliminary Appraisal of the costs of a Remediation Project for the Min Kush Taillings Ponds 1_ Environmental Impact Assessment and Feasibility Study prelim.estimates: ($ 0.65 million) 2_Implementation of Remedial Works Min Kush Tailings ponds: Tuyuk Suu (relocation to “D”)($ 4.5 million) Taldy Bulak($ 0.7 million) 3 _Monitoring and Maintenance Program ($ 0.5 million per year) (MES funding for Minkush approx. 250 – 350 K Som) 4_Public information and consulting ($ 1 million) 5_Regulatory capacity building, training, ($ 1.9 million) environmental information management system, laboratory upgrading, monitoring equipment 6_Technical Assistance (International) ($ 0.3 million)

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Key Components of the Environmental Impact Assessment Needed Prior to Implementation of a Remedial Project  Project description;  Environmental assessment;  Contaminant transport modeling;  Pathways analysis;  Human health implications;  Radiation protection;  Occupational health and safety;  Training requirements;  Quality Assurance/Quality Control  Emergency response;  Project management;  Contingency planning;  Monitoring/maintenance  Socio-economics; and  Stakeholder consultation.

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Implementation of Stakeholder Involvement „Environmental Review Committee“ selected from local representatives who serve as „multiplicators“ Project “Open House” Events Education of local population

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Tuyuk Suu Tailings pond in Minkush

The potential route for relocation of the Tuyuk Suu tailings. Distance Tuyuk Suu - „Dalneye“: approx 12 km. Main Cost factor: Upgrading of the road

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Taldy Bulak in a side valley en route to “Dalneye”

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Taldy Bulak: Upstream management of inflow

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Road from Taldy Bulak to Dalneye tailings site

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Tailings deposit at the „Dalneye“ site. Sufficiently stable and large site to take all tailings from the Min Kush sites

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Tailings deposit at the „Dalneye“ site. Sufficiently stable and large site to take the Tuyuk Suu tailings

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 An example of succesfull tailings relocation project Case of the Moab UMTRA Project in USA The Moab UMTRA Project is the largest tailings relocation project in the world. Relocation gives full satisfaction to all stakeholders while maintaining a safety record free of lost time safety incidents, and execute work ahead of schedule and within budget. Courtesy of the US DOE UMTRA

An example of succesfull tailings relocation project Case of the Moab UMTRA Project in USA Courtsy of the US DOE UMTRA The Haul Road (Construction Road) for Tailings Relocation in a mountainous terrain Courtsy of the US DOE UMTRA Project

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 An example of succesfull tailings relocation project Case of the Moab UMTRA Project in USA Placement of the relocated Moab Site tailings into the „Disposal Cell“ at the new site Courtsy of the US DOE UMTRA

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Elements of Detailed Costing for the Tuyuk Suu Tailings Relocation Project Relocation of tailings to secure site and reclamation of existing site Stabilization of potential landslide areas Install, repaire or stabilize containment dams dams and dykes Establish or improve surface water management system to handle 1:100 year run-off event Repair, replace or decommissioning of subsurface drainage system Erosion protection of slopes, embankments and waterways Construction or repair of tailings cover Re-vegitation Fencing and signs Environmental/radiation monitoring and regular inspection Routine annual maintenance of slopes, drainage, structures and tailings areas

UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Economics of the „Metal Recovery from Tailings Option“ for Kyrgyzstan Some legacy tailings may contain marketable metals, e.g. gold (Ak-Tuz), Mo (Kara Balta), etc. However, - the distribution of these metals in the tailings varies horizontally and vertically according to the system and rhythm of discharge, and - compared to the ore- their geochemistry and mineralogy underwent considerable changes during processing and long storage. A complex sampling program is required to estimate the inventory of the respective metal and a “tailor made” technology of recovery must be developed. In case that metal recovery proves to be feasible the increased exposure of the workers and public to radiation must be added to the costs incurred in processing the tailings.