Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Nura-Ishim River.

Slides:



Advertisements
Similar presentations
Water policy development in Uganda
Advertisements

Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
Sustainable Regional Water Resource Management By: Tucson Regional Water Coalition and Southern Arizona Leadership Council.
Improvement of Water Resources Management in Egypt Hesham Moustafa.
Chinese – EU cooperation on water - Partnerships on Water Challenges 2014 CEWP High Level Conference, 4 th December 2014 Marta Moren Abat DG ENVIRONMENT,
Legal Protection of Transitional Waters in Albania Bajram Mejdiaj/ Aferdita Ponari TWReferenceNet Nomos + Physis.
Hydropower Development: Experience of Nepal
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
NatStats ‘08 Conference “The importance of water data for National Water Reform” Ken Matthews Chairman and CEO National Water Commission Friday, 21 November.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
The SEEAW in the context of Integrated Water Resource Management Roberto Lenton Chair, Technical Committee Global Water Partnership.
International Cooperation in Water Management and Pollution Control in the Danube River Basin Joachim Bendow, ICPDR Executive Secretary 1.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Integrated thematic assessments: outlook on water, data and.
Kazakhstan and Central Asia Information in Transboundary Water Cooperation & The Value of National IWRM & Water Efficiency Plans Tim Hannan UNDP Water.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
EU, SIXTH FRAMEWORK PROGRAMME Optimisation for Sustainable Water Management EU funded Project: OPTIMA INCO-MPC Partner: INTERGEO Environmental Technology.
Introduction to the Session 6 - Theme 4 – on “Water Resources Management and Governance”
America’s Water Upmanu Lall water.columbia.edu.
IWRM as a Tool for Adaptation to Climate Change
«Проект по экономической реабилитации и построению мер доверия» Integrating interests and institutions in water resource management 25 th June, 2013 Eng.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
Project Implementation Plan and Principal Activities
INKOMATI CATCHMENT MANAGEMENT AGENCY Science & Management.
Training of Trainers Integrated Water Resources Management Enabling Environment and Institutions.
An Integrated Water Resources Planning (IWRP) perspective Information needs for Water Resources Management to be addressed by WRIM Information Systems.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
Kavala Workshop 1-2 June 2006 Legal protection of Transitional Waters [in the Cadses area]: A comparative analysis Dr. Petros Patronos / Dr. Liliana Maslarova.
TOPIC 3.2 ENSURING ADEQUATED WATER RESOURCES AND STORAGE INFRASTRUCTURE TO MEET AGRICULTURAL, ENERGY AND URBAN NEEDS.
Sustainable Regional Water Resource Management By: Tucson Regional Water Coalition and Southern Arizona Leadership Council SUMBER:
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
ANA AGÊNCIA NACIONAL DE ÁGUAS SESSION 5 - WATER GOVERNANCE IN BRAZIL Gisela Forattini Voorburg, the Netherlands May 2006 USER-PRODUCER CONFERENCE:
Integrated Water Management Valentina Pryazhinskaya Water Problems Institute of the Russian Academy of Sciences Problems and Challenges: Conflicting interests.
River Basin Management in Southern Africa Barbara Schreiner.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Collecting, Processing and Distributing of Water Statistics in the Republic of Belarus Zhanna Vasilevskaya, Belarus International Work Session on Water.
1 REPUBLIC OF KAZAKHSTAN MINISTRY OF AGRICULTURE COMMITTEE FOR WATER RESOURCES Identification of Priority Issues in 7 Major River Basins in Kazakhstan.
Stanley Liphadzi Sustainability of shared freshwater resources in the South Africa Dialogue on Water Governance 2015, Fortaleza, Brazil, November 2015.
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
California Water Plan Update Advisory Committee Meeting January 20, 2005.
 Learn how to identify and categorise stakeholders.  Consider different stakeholder structures and responsibilities in groundwater management.  Get.
Group Work IWRM Integrated River Basin Management.
Joint bodies according to the UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes Francesca Bernardini United.
BASIN SCALE WATER INFRASTRUCTURE INVESTMENT EVALUATION CONSIDERING CLIMATE RISK Yasir Kaheil Upmanu Lall C OLUMBIA W ATER C ENTER : Global Water Sustainability.
International Network Of Basin Organizations topic 3.1: “Basin Management and Transboundary Cooperation”. Operational tools  Long term basin management.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
A Presentation to the Kenya Water Towers, Forests and Green Economy National Dialogue; By: Eng. Philip J. Olum CEO- Water Resources Management Authority.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
Legal Framework for Transboundary Water Management Towards supranational mechanisms in addressing the challenges of water scarcity in WANA Raya Marina.
Framework for Water Management – challenges at national/local and trans-boundary scale Water Framework Directive implementation Gordana Kozhuharova, REC,
INTRODUCING INTEGRATED WATER RESOURCE MANAGEMENT IN THE ANDEAN STATES
Collection and use of data on Water Abstraction and Use in Georgia Mariam Makarova, Head of Water Resources Management Division, Ministry of Environment.
Under 4.7 Habitat of the MTDS, Working Group 2 deals with:
UNESCO-IHP Contribution to SDG 6 on Water and Sanitation
Concepts in Water Resources Management
Republic of Kazakhstan Priority Issues in 7 Major River Basins
Overview of Bank Water Sector Activities
Viet Nam Water Management Country Status Factsheet
Honduras Water Management Country Status Factsheet
Transboundary Aquifer Management Obligations
Kazakhstan Water Management Country Status Factsheet
Guatemala Water Management Country Status Factsheet
Ghana Water Management Country Status Factsheet
LIFE and the implementation of the Water Framework Directive
LIFE and the implementation of the Water Framework Directive
Presentation transcript:

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Nura-Ishim River Basins Water Management Project Purpose: to improve management of water resources throughout Kazakhstan. Goal: sustainable access to safe, reliable and affordable water supply for all. This is a Capacity Building project aimed at strengthening the WRC and the RBOs

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Nura-Ishim River Basins Water Management Project Phase 1 -Legal Reform and Institutional Capacity Building –Reviewed the institutional structure of water management and made recommendations for building capacity –Reviewed and recommended improvements in the Water Code to support effective, river basin oriented Integrated Water Resources Management –Both of these components are continuing now, into the Phase 2 period

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Nura-Ishim River Basins Water Management Project Phase 2 - Integrated Water Resources Planning and Management Focuses on the Nura and Ishim River Basins as pilot basins Develops institutional and technical processes and methods to support the adoption of Integrated Water Resources Management Two main outcomes of Phase 2: 1) An Institutional Development Strategy to support improved planning, development and management of water at the river basin level 2) A Water Resources Development Strategy for the river basins

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Nura-Ishim River Basins Water Management Project Phase 3 –Replication of Integrated Planning Procedures –Extends the methods and procedures developed in the Nura and Ishim Basins to all the river basins of Kazakhstan –It is the first step in the adoption of Integrated Water Resources Management (IWRM) across Kazakhstan

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Why Water Management Must Change Reliable access to safe water supplies is not sufficient Insufficient access is less a resource problem and more a management problem Water quality is poor Environmental and ecological needs of water are not addressed

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Why Water Management Must Change to meet international commitments to provision of safe water for all –UNGA – to halve, by the year 2015, the proportion of people who are unable to reach or afford safe drinking water –To stop the unsustainable exploitation of water resources through developing water management strategies at local, regional and national levels Government has an obligation to ensure provision of safe water to all

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Why Water Management Must Change Water is essential to economic and social development Inappropriate and ineffective water management results in: – wasted money – wasted water – reduced availability of and access to water – reduced economic and social development

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Integrated Water Resources Management (IWRM) Integrated planning and management of water resources and land Takes account of social, economic and environmental factors together Integrates surface, groundwater and the ecosystems through which they flow

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Integrated Water Resources Management (IWRM) Emphasises the importance of public participation in water decision making –Water is managed for the sole purpose of providing water to the people and the environment Emphasises accountability and transparency in water decision making Emphasises that the River Basin is the appropriate level for effective water management

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Integrated Water Resources Management (IWRM) The change to IWRM requires: Institutional development of RBOs, WRC and other organisations to ensure the capacity to adopt IWRM Government support for adoption of IWRM –Financial –Legal

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Management by Basin Organisation Typical overall structure to support River Basin IWRM: Central government National level coordinating and policy body River Basin Organisation River Basin Council

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Role of Central Government Central government is obliged to ensure that all people and the environment have access to water of adequate quantity and good quality. This means: Ensuring water management is properly financed Ensuring cooperation between all organisations and institutions related to water management Ensuring the legal framework supports effective water management

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Role of Central Government The WILL TO CHANGE exists -- in the new Water Code -- in international commitments -- in this World Bank project

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Role of Central Government Steady reduction in budgets for water management institutions over the last few years Loss of competencies for groundwater WRC lost independence WRC move under Minister of Agriculture – impossible to balance water needs equitably Only a portion of water fees collected is returned to water management activities.

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Role of National Level Body The National Body leads the work of Central Government in key areas: Developing Water Policy Coordinating all organisations and institutions related to water management Decision-making on national programmes, laws, regulations Planning and management at national level, including inter-basin and international trans- boundary issues Raising public awareness and understanding

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Role of Basin Organisations Basin organisations are the main authority for water resources planning, development and management Planning for water resources development within the basin Day-to-day management of water resources (allocation, licensing, etc.) Raising local awareness of problems and solutions A Water Council serves also to coordinate with stakeholders

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ The Water Code

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ The old Water Law Problems NO Integrated water management policy NO Planning goals and competencies NO Need-based budgeting, No self-financing NO Regulation of relationships between Government and private entities NO Legal obligation to share information NO Integration of national and transboundary water management NO Focus on river basin management Possible conflicts of interest – regulator, monitor, licensee, manager of facilities

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Practical problems with old Water Law Did not allow privatization of water facilities Lack of clear obligations and procedures between governmental organizations –Example: exchange of information No transboundary problems with different States Did not define rights and obligations of water users, public Did not regulate private water management companies

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Why the New Water Code? Law is a foundation and a framework Water is everybody’s business Kazakhstan involved in several transboundary disputes on water UN Watercourses Convention (1997) We must unite national and international water management

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ The new Water Code Objectives and Principles New Competencies New Obligations Strong Basin Organisations Stronger Enforcement Possibilities of financing and growth

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ New Water Code - New Competencies Integration of water management responsibilities in government Coordination on water issues (RBOs) Licensing of ground and surface waters by one agency (WRC, RBOs) Regulation and Rule-making (WRC) Information and Public Participation (WRC, RBOs)

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ New Water Code Transboundary Waters Definition (Art. 15.1) includes surface & groundwater Legal basis (Art. 15.2) –The present Code –laws of the Republic of Kazakhstan on the State Border –international agreements ratified in accordance with the established procedure Primacy of International Law (Art. 2.2) –If the International Agreements contain rules different from the Code, the rules of the International Agreements apply

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Nura-Ishim River Basin Management Decision Support System

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System OBJECTIVES Information System to assist in river basin planning and management Database of water resources and water quality data for each river basin Assessment of current water use in each river basin Prediction of future water usage over 20 year planning horizon Assessment of current and future predicted water balance in each basin Basis for determining basin-wide water allocations Analysis of alternative water management strategies Analytical tool for evaluating alternative water development options Application of systematic approach to development of river basin plans

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System COMPONENTS Geographic Information System (GIS) GIS database showing location of catchment areas, rivers, river gauging stations, reservoirs, lakes, aquifers, river abstraction points, wellfields, trans-basin diversion schemes and principal demand centres for municipal, industrial and irrigation water users; Database MicroSoft Access database, containing detailed data for use in the integrated water resources model, such as historic monthly time-series river flow data, groundwater yields, water quality data, rainfall data, evaporation data, reservoir characteristics and water demand projection data for municipal, industrial and irrigation water users; Integrated Water Resources Planning Model Integrated Water Resources Planning Model for simulating the water resources system within each river basin, for the purposes of assessing the present water demand/supply balance across each basin and for evaluating alternative future water resources development scenarios as well as assessing their impacts, in terms of both water quality and quantity, across each basin

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System SYSTEM STRUCTURE MicroSoft Access Database ArcView 8.2 GIS Integrated Water Resources Planning Model

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Country boundaries Oblast boundaries District boundaries River basin boundaries Sub-catchment areas Rivers Reservoirs, lakes & wetlands Protected conservation areas Recreation & angling facilities Commercial fisheries River gauging stations River abstraction points Groundwater aquifers Groundwater wellfields Wastewater discharge points Water quality monitoring points Trans-basin diversion canals Irrigation canals Water transfer pipelines Pumping stations Hydropower stations Water treatment plants Wastewater treatment plants Urban areas Industrial areas Irrigation areas Municipal demand centres Industrial demand centres Irrigation demand zones Rural water supply schemes River Basin Management Decision Support System Geographic Information System (GIS) GIS database to comprise a spatial data covering the following features:

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System Geographic Information System – ArcView 8.2 GIS

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System MicroSoft Access Database Time-series inflow data for each gauging station; Groundwater yields for each aquifer source; Water quality data for relevant contaminants at each source; Rainfall data from selected stations where data is available; Evaporation data from reservoirs; Reservoir characteristics; Municipal water demand data; Industrial demand data; Irrigation demand data; Development option data; Capital cost data; Operating cost data; Economic criteria. Database comprising the following non-spatial data:

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System Integrated Water Resources Planning Model Application to assist Integrated River Basin Planning and Management: Assessment of water resource yields (surface water and groundwater); Water demand forecasting (municipal, industrial and irrigation); Assessment of environmental/ecological flow requirements; Assessment of water quality requirements; Derivation of water demand/supply balance projections; Formulation of alternative demand management strategies; Formulation of alternative resource development strategies; Derivation of water allocations for licensing purposes; Estimation of cost of raw water delivery to principal users; Evaluation of range of development scenarios; Identification of least cost development scenario.

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System Integrated Water Resources Planning Model Water resources database; Water demand forecasting module; Water balance module; Water quality module; Water allocation/costing module; Resource management/development option module; Development scenario evaluation module. Time-series Water Balance Model, comprising the following:

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System Integrated Water Resources Planning Model Demand Forecasting module: Municipal water supply demands; Commercial/institutional demands; Industrial water supply demands; Irrigation water demands; Rural water supply demands; Environmental/ecological water requirements. Demand Forecasting criteria: Population projections for each identified urban centre; Projected service ratio (% of population served); Forecast per-capita consumption; Forecast un-accounted for water (leakage losses etc); Industrial economic forecasts; Agricultural forecasts (irrigated areas, crop mix, livestock etc); Ecological habitat criteria.

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System Integrated Water Resources Planning Model River network flow simulation; Reservoir operations simulation; Conjunctive use of groundwater/surface water; Simulation of abstractions/discharges; 70 year time-series simulation in monthly time-steps; Target supply reliability criteria; Operations optimization; System yield maximization; Demand/supply balance analysis. Basin Water Balance module: Water Quality module: Simulates variation in water quality through river network; Preserves dissolved solids balance for conservative parameters; Takes account of concentration effects of reservoirs / mixing.

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System Integrated Water Resources Planning Model New groundwater developments; Development of snow-melt interception reservoirs; Dam raising of existing reservoirs; Rehabilitation of water transfer schemes (Irtysh-Karaganda canal); River/reservoir clean-up projects (Nura river clean-up); Demand management options (leakage reduction, metering etc); Improved water and wastewater treatment. Resource development / Demand management options module: Development scenario evaluation module: Incremental yields for range of options; Capital and O&M costs for range of options; Option ranking; Evaluation of alternative development scenarios; Identification of optimum least-cost development scenario.

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ River Basin Management Decision Support System Use of the Decision Support System in this Study 1.Analysis of particular water supply issues relating to: Astana Karaganda Temirtau 2.Analysis of general water management issues in: Nura river basin Ishim river basin 3.Replication of generalised model into the other six basins: Irtysh river basin; Balkash-Alakol river basin; Shu-Talas river basin; Tobol-Torgay river basin; Ural-Caspian river basin; Syr Darya river basin.

Nura-Ishim River Basin Management Project DFID CWR Department for International DevelopmentCommittee for Water Resources KAZGIPROVODHOZ Integrated River Basin Management Decision Support System Nura-Ishim Water Resources Planning Model