DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL)

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Director’s Review July 25-27, 2006 T. Shaw1 DES Review DES Front End Electronics WBS 1.3 T. Shaw.
Pre-Director’s Review Findings & Recommendations RecommendationManagerStatus 9Update BOE for AlN boardsShawDone 10Establish the budget profile ASAPFlaugherDone.
ESODAC Study for a new ESO Detector Array Controller.
1. THE OSIRIS TUNABLE FILTERS  OSIRIS uses two 100 mm aperture Fabry-Perot tunable filters. One of them is optimized for short wavelengths, and one for.
7 January 2005MDI Workshop M. Breidenbach1 SLD VXD3 Pickup Experience.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
SDW2005, juin, Taormina The Corot Space instrument.
A compact, low power digital CDS CCD readout system.
DES Collaboration Meeting, Chicago, December 11-13, 2006 T. Shaw1 DES Collaboration Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky,
DES Collaboration Meeting, Chicago, December 11-13, 2006 T. Shaw1 DES Collaboration Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky,
Todd Moore for the DES CollaborationPSTalkJune 13 th, DES MONSOON LINEAR POWER SUPPLY SELECTION Todd Moore University of Illinois, at Urbana-Champaign.
Todd Moore for the DES CollaborationApril 20 th, Quick Summary of Noise Test Results. Noise test software & hardware setup. Earth grounding/shielding.
ZTF Interconnecting Scheme Stephen Kaye
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Clock Board Test and Preliminary Acceptance Criteria Ciemat (Madrid), April 2009 Juan de Vicente, Javier Castilla, Gustavo Martínez.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Juan Estrada July 25, Focal Plane Detectors WBS 1.2 this talk Breakout session L. Buckley-Geer J.E. T.Diehl H. Cease Multi CCD (part of WBS 1.5)
Todd Moore for the DES CollaborationApril 3 rd, Quick Summary of Noise Test Results. Noise test hardware & software setup. Earth grounding/shielding.
Differential Preamp Stephen Kaye New Preamp Design Motivation Move preamplifier from controller to the Vacuum Interface Board (VIB) Amplifies.
Single Board Controller Comments Roger Smith Caltech
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Todd Moore for the DES CollaborationNov 28, Noise test hardware & software setup. Earth grounding scheme utilized for noise tests. Block diagram.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Julian David Rodriguez Javier.
Dark Energy Survey Status John Peoples Presentation to the Fermilab PAC 6 March 2009.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.
CCD Cameras with USB2.0 & Gigabit interfaces for the Pi of The Sky Project Grzegorz Kasprowicz Piotr Sitek PERG In cooperation with Soltan Institute.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
UV - Visible Systems Peter Moore AURA / NOAO / ETS.
Status of NA62 straw electronics Webs Covers Services Readout.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
HIE REX / ISOLDE New Instrumentation electronics - Main functionalities - S.Burger BI-PM
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Brenna Flaugher July 6, DECam Project Summary Outline –WBS 1.1 Management –WBS 1.2 Focal Plan Detectors –WBS 1.3 Front End Electronics –WBS 1.4.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Single Board Controller Comments Roger Smith Caltech
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
Instrument Control Systems Seminar 2014, 20 th -24 th October 2014 Instrument Control Systems 2014 NGC controller Leander Mehrgan.
Differential Signal Path for 64 ch ZTF Mosaic Roger Smith and Stephen Kaye California Institute of Technology.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
New Coil Drivers Time Line Alberto Gennai I.N.F.N. Pisa.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
LKr status R. Fantechi.
Mini-drawers, FE-ASIC , Integrator
CMS EMU TRIGGER ELECTRONICS
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL) T. Moore, V. Simaitis (UIUC) M. Barceló, L. Cardiel (IFAE) J. Castilla, J. DeVicente, G. Martinez (CIEMAT) P. Moore, R. Schmidt (NOAO)

DES PMG Meeting, January 26, 2007 T. Shaw2 Monsoon at FNAL Moonsoon Experience is improved in 2006! Feb 2006 Delivery of two additional complete Monsoon Systems. One was shipped to Barcelona Mar 2006 With “short” cable run, we are able to achieve ~6.5e - noise at ~6us/pixel April 2006 With a pre-amp located outside of dewar wall, we are able to achieve ~6.5e - noise at ~6us/pixel with a long cable July 2006 Delivery of fourth Monsoon system for FNAL August 2006 FNAL Director’s review recommends use of JFET source follower close to CCD video output October 2006 Begin instrumenting the Multi-CCD test Dewar (MCD) November 2006 Simultaneous readout of two CCDs in MCD.

DES PMG Meeting, January 26, 2007 T. Shaw3 DES Changes to Monsoon To use the Monsoon System for Production DES Electronics, we will customize the boards for our specific application: –Build a 12 channel CCD Acq Module with Transition Module which will provide customized bias voltages, RTD readout, and Vsubstrate ramp control. Tested and working at the bench. Getting prepared to readout a CCD at SiDet. –Build a customized Clock Board to better address our clocking needs; greater fanout ability to drive more clocks. Engineers from CIEMAT (Madrid) are doing the main Clock Module. Engineers from IFAE (Barcelona) are doing the Transition Module. –Slight modification to the Master Control Board to allow for switch to S-Link as the fiber optic link; also, look into multi-crate synchronization. Engineers from IFAE are working on upgrading the Master Control Board –Goal to have a working example of the S-Link implementation within a couple of months.

DES PMG Meeting, January 26, 2007 T. Shaw4 12 Channel Acq. Board (Top View) Two Socketed Channels

DES PMG Meeting, January 26, 2007 T. Shaw5 New Clock Board is being designed by engineers at CIEMAT (Madrid) which will drive many more clock lines. The current NOAO board provides 32 clocks, the new board will provide 135, or enough for 9 CCDs. Status: –Board is being assembled –Firmware ready for testing –Monsoon station on order Future work: –CB testbench installation in Madrid (Monsoon based) –Prototype validation and characterization Clock board status

DES PMG Meeting, January 26, 2007 T. Shaw6 Vacuum Interface Board Kapton Cable AlN Board & CCD Camera Vessel Instrumentation JFET Board Pre-amp Board

DES PMG Meeting, January 26, 2007 T. Shaw7 R&D Continue work on developing power supply solution; UIUC is exploring use of Vicor switching power supplies; FNAL engineers will begin to look into this as well Test fanout of clock signals using the new Clock Board; current plan uses common clock rail settings to drive a group of three CCDs Complete transition from Systran to S-Link for Monsoon communication link Cabling noise studies with multi-CCD test vessel -> refine JFET, pre-amp placement and design; look into alternate channel designs; test a differential driver and pre-amp; finalize kapton cable design Development/test of V2 CCD pedestal package Complete system testing of 12-Channel Board and Clock Board Test multi-crate synchronization