ID Organisation 2009 P. Wells (Project Leader) A. Catinaccio (Project Engineer) (A. Cattai) + ? (ATLAS) Thermal management DCS & online monitoring S. D’Auria.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
TRT LAr Tilecal MDT-RPC BOS Pixels&SCT 1 The Atlas combined testbeam Thijs Cornelissen, NIKHEF Jamboree, Nijmegen, December 2004.
Forum on Tracking Detector Mechanics 2013 University of Oxford June 19 th -21 th C 2 F 6 /C 3 F 8 saturated fluorocarbon cooling blends for the ATLAS SCT.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
18/05/2005Kamil Sedlak1 ATLAS Data Acquisition and Controls DAQ … data characterised by event and run number. DCS … data characterised by (valid for) some.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
The Detector Control System for the ATLAS SemiConductor Tracker
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
TB & Simulation results Jose E. Garcia & M. Vos. Introduction SCT Week – March 03 Jose E. Garcia TB & Simulation results Simulation results Inner detector.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Solenoid Magnetic Field Mapping Paul S Miyagawa University of Manchester Introduction Mapper machine Mapper software - Simulation - Corrections - Fitting.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Introduction & News SCT Weekly during ID Week Dave Robinson Cambridge University.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
ATLAS Radiation Monitor integrating monitor integrating monitor Igor Mandić, Vladimir Cindro, Andrej Gorišek, Gregor Kramberger, Marko Mikuž, Marko Zavrtanik.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Online Radiation Dose Measurement System for ATLAS experiment I. Mandić a, V. Cindro a, I. Dolenc a, A. Gorišek a, G. Kramberger a, M. Mikuž a,b, J. Hartert.
Status of ID sonar developments Greg Hallewell Centre de Physique des Particules de Marseille (CNRS/IN2P3) ATLAS ID week, CERN, October 28 th - November.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
ATLAS Inner Detector Magnetic Field I am responsible for providing the magnetic field map for the ATLAS Inner Detector.  6m long x 2m diameter cylindrical.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
MICE Preparations for CM18 Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Video Conference April 12,
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
IDE DCS developments Ewa Stanecka INP Kraków ID Week,
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
Joint Meeting ATLAS-CERN Detector Group / PH-Detector Technology Group Overview of the PH-DT group: Group Structure Current Projects Services White Paper.
ATLAS Tracker Group PPD Staff Talk 28/Nov/2005 Steve McMahon 1 Steve McMahon : An Introduction Backgrounds and Pre-History –Imperial College London
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai, Kazuhiko Hara (Univ. of.
60kW Thermosiphon control system
6 th September 20061S. Eicher, M. Battistin Upgrade Thermal Management Workshop September 6 th 2006 Bdg 40 Sara Eicher, Michele Battistin CFD Calculations.
U.S. ATLAS Executive Meeting Silicon M&OWBS 3.1 August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Status of the DCS Richard Brenner (Uppsala University) " Structure of the DCS " Cabling of DCS sensors " Interlock " Status and near future plans.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
Preparations for Run 6 Don Lynch February 13, 2006.
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
Валидация TRT DCS CONDITIONS SERVICE Евгений Солдатов, НИЯУ МИФИ “Physics&Computing in ATLAS” – 22/09/2010.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
ATLAS ITk - Activities Common Mechanics group (Lukasz Zwalinski, Paolo Petagna, … ) Plant →PP1 DEMO & BABY DEMO 14/03/2016C. Rossi - INFN Genova1 Detector.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
The ATLAS detector … … is composed of cylindrical layers: Tracking detector: Pixel, SCT, TRT (Solenoid magnetic field) Calorimeter: Liquid Argon, Tile.
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
`` ATLAS inner detector JV Els KoffemanAtlas - Inner Detector1 Tracking in solenoid 2 Tesla field – 3 pixel layers with 50 um x 400 um cells – 4.
ورود اطلاعات بصورت غيربرخط
Update on ATLAS insertable B-layer
Presentation transcript:

ID Organisation 2009 P. Wells (Project Leader) A. Catinaccio (Project Engineer) (A. Cattai) + ? (ATLAS) Thermal management DCS & online monitoring S. D’Auria Beam conditions M. Mikuz D. Dobos (runco) Risk analysis D. Giugni SR1 ?? Detector Operation Trigger J. Baines Trigger Off-line run coordination Ch. Schmitt (dep. T.Cornelissen) Alignment J. Schieck (dep. S. Marti) Data Prep Software M. Elsing Computing/ Software Physics Tracking Performance S. Haywood A. Wildauer Last modified 3/3/2009

Notes: Approximate correspondence between ID tasks and the five ATLAS activity areas are indicated Pixel, SCT and TRT subsystem tasks are shown elsewhere Solenoid is operated by ATLAS magnet group (H. ten Kate). ID monitors the field (NMR probes + DCS project) Cooling is overseen by the ATLAS cooling unit (A. Cattai), but with day-to- day operation under ID responsibility –The cooling plants are operated by CERN-EN/CV (M. Battistin) –Operation of the environmental gas systems is by the CERN PH/DT gas group (M. Capeans) –ID areas are detailed on the next slide. Many activities in the offline go across areas. All aspects of software tasks are detailed here:

(A. Cattai) + ? ID parts of ATLAS thermal management Evaporative Cooling K. Nagai A. Bitadze E. Stanecka Thermal enclosure heaters (pads) Env Gas H. Danielsson S. Katunin Cable Cooling N. Hartman G. Viehauser K. Egorov ??? Hardware Firmware J. Pieron Operation Future developments and test stands H. Danielsson S. Katunin NB also need a person for TEH FSM project!

M. Mikuz, H. Pernegger Beam conditions Run coordinator BCM M. Mikuz BLM I. Mandic Radmon D. DobosA. Gorisek

DCS & online monitoring S. D’Auria Cool L. Luisa A. Micelli Gas Y. Pylypchenko + Genova PVSS projects (FSMs)ID Athena online Monitoring H. Sandaker Sensors Mag S. Snow Env B. Wynne TEH ?? Mag M. Kayl BCM J. Moss Radmon J. Harts BLM A. Gorisek ID DCS Monitoring L. Luisa U. Bitenc B. Murray Subsystem contacts: Pixel T. Flick SCT S. D’Auria,K. Shaw TRT S. Kovalencko Subsystem contacts: Pixel B. Heinemann SCT J. Garcia, M. White TRT Cwetanski, Degenhardt