Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation.

Slides:



Advertisements
Similar presentations
Chapter 11 Standard Costs and Variance Analysis
Advertisements

CHAPTER 10 The Need for Standards Standards Are common in business They are often imposed by government agencies (and called regulations) Standard costs.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs Chapter 11: Flexible Budgeting and the Management of Overhead and.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
CHAPTER 15 Cost Analysis for Control. McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc., All Rights Reserved Decision Making Strategic, Operational,
Cost Analysis for Control
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
ACTG 321 Agenda for Lecture 14
Hilton Maher Selto. 16 Standard Costing, Variance Analysis, and Kaizen Costing McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Standard Costing and Variance Analysis
C H A P T E R 9 Evaluating Personnel and Divisions.
C H A P T E R 6 Monitoring Performance in Cost, Profit and Investment Centers.
VARIANCE ANALYSIS 1 LECTURE 8.
Chapter Fifteen Performance Evaluation © 2015 McGraw-Hill Education.
Standard Costs and Balanced Scorecard
Chapter 12 – Standard Costs: Direct Labor and Materials
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Chapter 17 – Additional Topics in Variance Analysis
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 8 - Flexible Budgets and Variance.
Financial and Managerial Accounting
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
Chapter 21 Flexible Budgets and Standard Costing.
Chapter 25-1 Chapter 25 Standard Costs and Balanced Scorecard Accounting Principles, Ninth Edition.
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 The Flexible Budget and Standard Costing Chapter 13 Objectives: Develop and.
24-1. CHAPTER 24 C ONTROL THROUGH S TANDARD C OSTS.
Budgetary Planning and Control
Performance Evaluation Through Standard Costs
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
1 Brenda Mallouk Overhead Variance Analysis Management Accounting One.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead 11-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
Chapter 13 – Overhead and Marketing Variances
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Standard Costing and Analysis of Direct Costs CHAPTER 10 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
1 Budgeting as a control mechanism 1. Budgeted levels are the standards to follow in operation 2. Variance evaluation for performance measurement A variance.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
ACC3200 STANDARD COSTING.
© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10.
Chapter 16 Fundamentals of Variance Analysis.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
20 Monitoring Performance in Cost, Profit and Investment Centers
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Performance Evaluation
Standard Costs and Variances
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Presentation transcript:

Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation

Topics to be Discussed Introduction Standard Costing Ideal Versus Practical Standards Use of Standards by Nonmanufacturing Organizations Application in Business

Introduction Key Concept The purpose of the control function in management is to make sure that the goals of the organization are being attained.

Introduction Variance Analysis At the end of the an accounting period, managers use the budget as a control tool by comparing budgeted sales, budgeted production and budgeted manufacturing costs with actual sales, production and manufacturing costs. Variance analysis allows managers to see whether sales, production and manufacturing costs are higher or lower than planned, and WHY actual sales, production and costs differ from those budgeted.

Introduction Management by Exception: Managers choose deviations to investigate by focusing on material or significant differences.

Standard Costing Standard Price: the Budgeted Price of the material, labor or overhead for each unit. Standard Quantity: the Budgeted Quantity of the material, labor or overhead for each unit.

Standard Costing Task Analysis: examines the production process in detail with an emphasis on determining what it should cost to produce a product, not what it cost last year.

Ideal vs Practical Standards Ideal Standards: One that is attained only when near perfect conditions are present. Assumes that every aspect of the production process, from purchasing through shipment, is at peak efficiency.

Ideal vs Practical Standards Practical Standards: Should be attained under normal, efficient operating conditions. Take into consideration that machines break down occasionally, that employees are not always perfect, that waste in materials does occur.

Ideal vs Practical Standards Pause and Reflect How do you think you would react to being evaluated using ideal standards? Only A’s or F’s for a grade? What about practical standards?

Use of Standards by Nonmanufacturing Organizations Auto dealership: How much should it cost to sell a car? City: How much should it cost to provide garbage pickup? State University: How much should it cost to provide an education per student? CPA firm: How much time is needed to prepare certain types of tax forms or returns?

Use of Standards by Nonmanufacturing Organizations Pause and Reflect The estimated cost of providing an education to a student at a typical state university has been estimated to exceed $30,000 per year. However, in-state tuition at most public universities rarely exceeds $3,000 to $5,000 per year. Who is paying the rest of the cost?

Application in Business Some managed health care companies have a standard amount of time for doctors seeing patients for particular ailments. Initial visit: 20 minutes Full physical: 45 minutes

Standard Costing Topics Flexible Budgeting with Standard Costs Sales Volume Variance Variable Manufacturing Cost Variances A Model Variance Analysis Direct Material Variances Direct Labor Variances Variable Overhead Variances Fixed Overhead Variances

Flexible Budgeting with Standard Costs Standard Costs for Corinne’s Country Rocker Direct Material Direct Labor Variable OH Standard Quantity 20 linear ft of oak 5 labor hours Standard Price $2 per foot $12 per hour $ 3 per hour Standard Cost $40 $60 $15 $115 Total Variable Production Costs

Flexible Budgeting with Standard Costs Comparison of Budget to Actual Units sold Units produced Sales revenue Variable manuf. Costs Variable S & A Contribution margin Static Budget 1,500 $375, ,500 37,500 $165,000 Flexible Budget 1,600 $400, ,000 40,000 $176,000 Actual Results 1,600 $396, ,200 40,800 $166,800

Flexible Budgeting with Standard Costs Comparison of Budget to Actual, cont. Contribution margin Fixed manuf. Costs Fixed S & A Operating Income Static Budget $165,000 15,000 18,000 $132,000 Flexible Budget $176,000 15,000 18,000 $143,000 Actual Results $166,800 16,000 $134800

Flexible Budgeting with Standard Costs Why is the difference between the static budget and flexible budget contribution margin the same as the difference between the static budget and flexible budget operating income?

Sales Volume Variance Sales Volume Variance = (Actual – Budgeted Sales Volume) X (Budgeted Contribution Margin Per Unit) For Corrine’s: $11,000 = (1,600 – 1,500) x $110

Sales Volume Variance Units sold Units produced Sales revenue Variable manuf. Costs (-) Variable S & A (-) Contribution margin Fixed manuf. Costs (-) Fixed S & A (-) Operating Income Static Budget 1, , ,000 37, ,000 15,000 18, ,000 Sales Vol Var 25,000 11,500 2,500 11,000 Flexible Budget 1, , ,000 40, ,000 15,000 18, ,000

Flexible Budget Variance The difference between the flexible budget operating income and actual operating income is called the flexible budget variance. The flexible budget removes any differences due to volume.

Flexible Budget Variance Units sold Avg. sales price per unit Sales revenue Variable manuf. Costs (-) Variable S & A (-) Contribution Margin Fixed manuf. Costs (-) Fixed S & A (-) Operating Income Flexible Budget 1,600 $ , ,000 40, ,000 15,000 18, ,000 Flexible Budget Variance (3,200) 5, (9.200) 1,000 (2,000) (8,200) Actual Results 1,600 $ , ,200 40, ,800 16, ,800

Flexible Budget Variance Key Concept The flexible budgeting process removes any differences or variances due only to variations in volume.

Sales Price Variance Sales Price Variance = (Actual - Expected Sales Price) x Actual volume -$3,200 = ($248-$250) x 1,600 Why?

Variance Analysis AQ x AP Actual Cost AQ (AP-SP) Price Variance SQ x SP Flexible Budget Amount SP (AQ - SQ) Usage Variance Basic Variance Analysis Model AQ x SP

Variance Analysis SQ = Actual number of units produced multiplied by the standard (budgeted) quantity of material or hours of labor per unit X = Standard (budgeted) quantity of material or number of hours budgeted per unit

Direct Material Variances AQ x AP 33,600 x $1.90 = $63,840 AQ x SP 33,600 x $2.00 =$67,200 SQ x SP 32,000 x $2.00 =$64,000 33,600 ($ ) $3,360 F Price Var. $2.00 (33, ,000) $3,200 U Usage Var Total Variance = $3,360 F + $3,200 U = $160 F SQ = 20 ft./unit x 1,600 chairs

Direct Material Variances What are some possible reasons for a favorable direct material price variance and an unfavorable material usage variance?

Direct Material Variances When the actual amount of material purchased is different from the amount of material used, the direct material variance model must be modified. For example, let’s assume that Corinne’s purchased 35,000 feet of lumber but only used 33,600 feet in production.

Direct Material Variances AQ X AP AQ X SP AQ X SP SQ X SP 35,000 X $ ,000 X $ ,600 X $ ,000 X $2.00 = $66,500 = $70,000 = $67,200 = $64,000 $3,500 F $3,200 Price Var Usage Var The model above is when quantities purchased are not the same as quantities used.

Direct Labor Variances AH X AR AH X SR SH X SR 8,400 X $ ,400 X $ ,000 X $12.00 = $101,640 = $100,800 = $96,000 $840 U $4,800 U Rate Var Efficiency Var Total Direct Labor Variance = $840 U + $4,800 U = $5,640 U SH = 1,600 chairs X 5 hrs/chair

Direct Labor Variances What are some possible reasons for unfavorable direct labor rate and efficiency variances?

Variable Overhead Variances Actual Variable AH X SVR SH X SVR Overhead Expense 8,400 X $3.00 8,000 X $3.00 = $23,720 =$25,200 = $24,000 $1,480 F $1,200 U Spending Variance Efficiency Variance Total Variable Overhead Variance = $1,480 F +$1,200 U = $280 F

Variable Overhead Variances Key Concept The variable overhead efficiency variance does not measure the efficient use of overhead but rather the efficient use of the cost driver or overhead allocation base used in the flexible budget.

Fixed Overhead Variances Budget Variance: the difference between the amount of fixed overhead actually incurred and the flexible budget amount. Volume Variance: the difference between the flexible budget amount and the amount of fixed overhead applied to products.

Fixed Overhead Variances Actual Fixed Budgeted Applied Overhead Expense Fixed Overhead Fixed Overhead = $16,000 = $15,000 = $16,000 $1,000 U $1,000 F Spending Variance Volume Variance

Overhead Variances Key Concept Total over- or underapplied overhead is the sum of the four overhead variances (two variable overhead variances and the two fixed overhead variances).

Overhead Variances Key Concept The fixed overhead volume variance should not be interpreted as favorable or unfavorable, or as a measure of the efficient utilization of facilities.

More Topics ABC and Variance Analysis Selling and Administrative Expense Variance Interpreting and Using Variance Analysis Behavioral Considerations

Selling and Administrative Expense Variance A price standard can be developed for the time spent to process each mail-order sales by telephone, which includes the salary costs incurred by the sales representatives handling the call and the direct costs of the toll-free line. Then the actual costs incurred can be compared to the the flexible budget and the price and usage variances can be calculated.

Selling and Administrative Expense Variance Drawbacks on Variances The information from VA is likely to be too aggregated for operating managers to use. The information from VA is not timely enough to be useful to managers.

Selling and Administrative Expense Variance Drawbacks on Variances Traditional VA of variable and fixed overhead provides little useful information for managers. Traditional VA focuses on cost control instead of product quality, customer service, delivery time, and other nonfinancial measures of performance.

Interpreting and Using Variance Analysis Use the decision model: Define the problem Identify objectives Identify and analyze available options Select the best option

Interpreting and Using Variance Analysis An unfavorable direct material usage variance generally points to a problem in production. However, further analysis might reveal that usage was high because of an unusual number of defective parts and the large number of defective parts was a result of the purchasing manager buying materials of inferior quality.

Interpreting and Using Variance Analysis Pause and Reflect Even though the purchasing manager caused the “problem,” the material price variance would be favorable. As discussed earlier, favorable variances are not necessarily “good.”

Behavioral Considerations Standards Costs and Variance Analysis can provide very useful control and performance evaluations, or they can cause dysfunctional behavior among employees and management.

End of Chapter 10 What variances do you need for your business?