CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.

Slides:



Advertisements
Similar presentations
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Operational Budgeting Chapter 22.
Advertisements

Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
OPERATIONAL BUDGETING
Standard Costing and Variances
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
Standard Costs 11/16/04 Chapter 10. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and Variance Analysis Chapter Ten & Eleven.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Additional Topics in Variance Analysis Chapter 17 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Variance Analysis Chapter 7 Prepared by Diane Tanner
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University MANAGERIAL ACCOUNTING 10 TH EDITION.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter Fifteen Performance Evaluation © 2015 McGraw-Hill Education.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Fundamentals of Accounting II
Financial and Managerial Accounting
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Chapter 23 Flexible Budgets and Standard Cost Systems
Flexible Budgets and Standard Costs
Chapter 21 Flexible Budgets and Standard Costing.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Standard Costs and Operating Performance Measures
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Standard Costing and Analysis of Direct Costs CHAPTER 10 Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
14-1 CHAPTER 14 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Analysis for Planning.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
9-1 Standard Costs Standards are benchmarks or “norms” for measuring performance. In managerial accounting, two types of standards are commonly used.
Chapter 10 Standard Costs and the Balanced Scorecard.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Direct Labor Variances Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 44.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Performance Evaluation Chapter 15 Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © by Houghton Miffin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
CHAPTER 8 PowerPoint Author: LuAnn Bean, Ph.D., CPA, CIA, CFE Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution.
Chapter 8 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Standard Costs.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 17 Budgeting.
Chapter 23 Flexible Budgets and Standard Cost Systems.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
Chapter Fifteen Performance Evaluation © 2015 McGraw-Hill Education.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Chapter Eight Chapter 8.
Performance Evaluation
Managerial accounting
COST ANALYSIS FOR CONTROL
Performance Evaluation
Performance Evaluation
Managerial Accounting
Managerial accounting
Principles of Accounting 2002e
© 2017 by McGraw-Hill Education
© 2017 by McGraw-Hill Education
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

CHAPTER 8 Performance Evaluation

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-3 Preparing Flexible Budgets The master budget, sometimes called a static budget, is based solely on the planned volume of activity. Flexible budgets differ from static budgets in that they show expected revenues and costs at a variety of volume levels.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-4 Preparing Flexible Budgets Melrose Manufacturing, a producer of small high-quality trophies, plans to make and sell 18,000 trophies during Melrose uses a standard cost system as outlined below:

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-5 Preparing Flexible Budgets With very little effort, the accountant can provide management with a flexible budget for both budgeted and actual levels of activity. The flexible budget is a critical tool in effective performance evaluation.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-6 Preparing Flexible Budgets From the standard cost information, Melrose prepares the following static and flexible budgets. 18,000 × $80 = $1,440,000

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-7 Learning Objective LO2 To classify variances as being favorable or unfavorable

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-8 Determining Variances for Performance Evaluation The differences between standard and actual amounts are called variances. A variance may be favorable or unfavorable. When actual sales are less than expected, an unfavorable sales variance exists. When actual sales revenue is greater than expected revenue, a company has a favorable sales variance.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-9 Learning Objective LO3 To compute and interpret sales volume variances

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-10 Sales Volume Variances The difference between the static budget sales amount and the flexible budget sales amount is a measure of the sales volume variance.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-11 Interpreting the Volume Variances In a standard cost system, marketing managers are usually responsible for the volume variance. Because sales volume drives production, production managers have little control over volume variance. In the case of Melrose, the marketing manager exceeded planned sales volume by 1,000 units, resulting in an $80,000 favorable revenue variance ($80 × 1,000). The unfavorable cost variances are somewhat misleading. Melrose incurred higher costs because it manufactured and sold more units than planned.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-12 Interpreting the Volume Variances Because actual volume is not known until the end of the period, the selling price must be based on planned volume. At the planned volume of 18,000 units, Melrose’s fixed cost per unit is expected to be as follows: Based on actual volume, fixed cost per unit would be $15.35 ($291,600 ÷ 19,000).

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-13 Learning Objective LO4 To compute and interpret flexible budget variances

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-14 Flexible Budget Variances For effective performance evaluation, management must compare the actual results achieved to the flexible budget based on the actual volume of activity. Here is a comparison of the standard amount and actual amount per unit for the current period.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-15 Flexible Budget Variances Now we are comparing actual results achieved with the results that should have been achieved at the activity level. $78 × 19,000 = $1,482,000

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-16 Calculating Sales Price Varianceor

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-17 Learning Objective LO5 To explain standard cost systems

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-18 Standard Cost Systems A standard represents the amount a price, cost, or quantity should be, based on certain anticipated circumstances. Accountants, engineers, purchasing agents, and production managers combine efforts to set standards that encourage efficient future production.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-19 Establishing Standards ideal standards Should we use ideal standards that represent what costs should be under the best circumstances? Engineer Managerial Accountant practical standards I recommend using practical standards that an average worker performing diligently would be able to achieve.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-20 Need for Standard Costs Management by exception Standard costs help managers plan and establish benchmarks against which actual performance can be judged. Management by exception focuses on material differences between actual and expected results.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-21 Selecting Variances to Investigate Management by exception tells us to consider: 1.The materiality of a variance, 2.How frequently it occurs, 3.The capacity to control the variance, and 4.The characteristics of the items behind the variance. Management by exception tells us to consider: 1.The materiality of a variance, 2.How frequently it occurs, 3.The capacity to control the variance, and 4.The characteristics of the items behind the variance.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-22 Manufacturing Cost Variances We will use the following information provided by Melrose Manufacturing in 2006 to calculate manufacturing variances.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-23 Learning Objective LO6 To calculate price and usage variances

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-24 Materials Price and Usage Variances Actual Quantity Used × Actual Price Per Pound Actual Quantity Used × Standard Price Per Pound Standard Quantity × Standard Price Per Pound 117,800 × $1.90 $223, ,800 × $2.00 $235,600 $11,780 Favorable Materials Price Variance $11,780 Favorable 114,000 × $2.00 $228,000 $7,600 Unfavorable Materials Usage Variance $7,600 Unfavorable $4,180 Favorable Total Variance $4,180 Favorable Actual Cost Column Variance Dividing Column Standard Cost Column

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-25 Materials Price and Usage Variances Price Variance = Actual Quantity × Actual Price Standard Price – = $11,780 Favorable = ×– ($1.90 $2.00)117,800 Usage Variance = Standard Price × Actual Quantity Standard Quantity – = $7,600 Unfavorable = ×– (117, ,000)$2.00

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-26 Responsibility for Materials Variances I am not responsible for this unfavorable material quantity variance. You purchased inferior material, so my people had to use more of it. You purchased inferior material, so my people had to use more of it. Production Manager Your poor scheduling sometimes requires me to “rush order” material at a higher price, causing unfavorable price variances. Purchasing Manager

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-27 Calculating Labor Variances Melrose has provided the following information about labor cost and usage during the period.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-28 Labor Price and Usage Variances Actual Hours Used × Actual Price Per Hour Actual Hours Used × Standard Price Per Hour Standard Hours × Standard Price Per Hour 28,500 × $11.50 $327,750 28,500 × $12.00 $342,000 $14,250 Favorable Labor Price Variance $14,250 Favorable 26,600 × $12.00 $319,200 $22,800 Unfavorable Labor Usage Variance $22,800 Unfavorable $8,550 Unfavorable Total Variance $8,550 Unfavorable Actual Cost Column Variance Dividing Column Standard Cost Column

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-29 Labor Price and Usage Variances Price Variance = Actual Hours × Actual Price Standard Price – = $14,250 Favorable = ×–($11.50 $12.00) 28,500 Usage Variance = Standard Price × Actual Hours Standard Hours – = $22,800 Unfavorable = ×–(28,500 26,600) $12.00

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-30 Responsibility for Labor Variances Production Manager Production managers are usually held accountable for labor variances because they can influence the: Mix of skill levels assigned to work tasks. Level of employee motivation. Quality of production supervision. Quality of training provided to employees.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-31 Responsibility for Labor Variances I am not responsible for the unfavorable labor efficiency variance! You purchased cheap material, so it took more time to process. You purchased cheap material, so it took more time to process. I think it took more time to process the materials because the Maintenance Department has poorly maintained your equipment. Production Manager Purchasing Manager

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-32 Variable Overhead Variances Variable Overhead Variance = Actual Units × Actual Cost Standard Cost – Unfavorable = $2,850 Unfavorable = ×– ($5.75 $5.60)19,000 For Melrose’s Flexible Budget

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-33 Fixed Overhead Variances Variable costs can have both price and usage variances. Fixed overhead costs can have a price variance. The difference between the actual fixed overhead cost and the budgeted fixed overhead cost is called the spending variance. At Melrose, the spending variance was: ($210,000 actual - $201,600 budgeted) = $8,400 Unfavorable

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-34 Fixed Overhead Variances Overhead Volume Variance ($201,600 budgeted – $212,800 applied) = $11,200 Favorable

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-35 Fixed Overhead Variances Actual Fixed Cost Budgeted Fixed Cost $210,000 $201,600 Unfavorable Spending Variance $8,400 Unfavorable Applied Fixed Cost $212,800 Favorable Volume Variance $11,200 Favorable

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-36 General, Selling & Administrative Cost Variances Variable general, selling, and administrative (GS&A) costs can have price and usage variances. Fixed GS&A costs are also subject to variance analysis. We know that the flexible budget for 19,000 units sold shows GS&A expenses of $90,000. The actual GS&A expenses incurred during the period were $85,000. There was a $5,000 ($90,000 – $85,000) favorable fixed GS&S variance. Variable general, selling, and administrative (GS&A) costs can have price and usage variances. Fixed GS&A costs are also subject to variance analysis. We know that the flexible budget for 19,000 units sold shows GS&A expenses of $90,000. The actual GS&A expenses incurred during the period were $85,000. There was a $5,000 ($90,000 – $85,000) favorable fixed GS&S variance.

The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-37 End of Chapter 8