Planning of Variable and Fixed Overhead Costs Effective planning of VOH involves reducing non-value added costs & consumption of cost allocation bases.

Slides:



Advertisements
Similar presentations
Flexible Budgets, Variances, and Management Control: II
Advertisements

Flexible Budgets, Variances, and Management Control:II
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Standard Costing and Variances
11 Flexible Budgets and Overhead Analysis Chapter  See Chapter 10 notes for a discussion of the flexible budget  For a manufacturing firm, the flexible.
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
2009 Foster School of Business Cost Accounting L.DuCharme 1 Overhead Variances and Management Control: II Chapter 8.
Direct manufacturing labor Direct manufacturing labor haours Direct manufacturing labor haours Actual price incrred per direct manufacturing labor-hour.
Cost Accounting Horngreen, Datar, Foster Flexible Budgets, Variances, and Management Control: I Session 7.
Flexible Budgets, Overhead Cost Variances, and Management Control
ACTG 321 Agenda for Lecture 14
Copyright © 2015 Pearson Education, Inc. All Rights Reserved. Flexible Budgets, Overhead Cost Variances, and Management Control.
Additional Topics in Variance Analysis Chapter 17 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Variance Analysis Chapter 7 Prepared by Diane Tanner
Flexible Budgets/Variances II Chapter Eight. Developing Budgeted Variable Overhead Allocation Rates Step 1: Choose the time period used to compute the.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
VARIANCE ANALYSIS 1 LECTURE 8.
Chapter 9 Inventory Costing and Capacity Analysis.
Blocher,Stout,Cokins,Chen, Cost Management 4e ©The McGraw-Hill Companies 2008 The Flexible Budget: Factory Overhead Chapter Fourteen.
Flexible Budget, Overhead Cost Variances and Management Control
Inventory Costing and Capacity Analysis Lecture 22 1 Readings Chapter 09,Cost Accounting, Managerial Emphasis, 14 th edition by Horengren Chapter 07, Managerial.
Introduction Overhead costs are a major cost area for many organisations. Planning and control of overhead costs is an ongoing challenge to managers.
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Flexible Budgets and Variance Analysis
Flexible Budgets and Standard Costs
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
THE BUDGET PLAN FOR 4 TH QUARTER Sell in 4 th quarter: 70,000 pants 25,000 jerseys 9,000 award jackets Control inventory Manage cash.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
© 2009 Pearson Prentice Hall. All rights reserved. Flexible Budgets, Overhead Cost Variances, and Management Control.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
1 Adapted by Cynthia Fortin, CPA, CMA Introduction to Managerial Accounting, Brewer, Garrison,Noreen.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
The Islamic University –Gaza
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Performance Evaluation and Using Variances Chapter M6.
CHAPTER 8 Flexible Budgets, Overhead Cost Variances, and Management Control.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 9 Introduction to a Standard Cost System.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Chapter 17 Overhead Cost Management Flexible Budgets.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
Inventory Costing Dr. Hisham Madi. Inventory Costing  The inventory costing system that is chosen determines which manufacturing costs are treated as.
Flexible Budgets/Variances I Chapter Seven. Static Budget Example Webb Co. manufactures and sells jackets. Budgeted variable costs per jacket are as follows:
Variance Analysis: Manufacturing Overhead
Production Cost Variance Analysis
Flexible Budgets, Overhead Cost Variances, and Management Control
Performance Evaluation
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 15
Overhead and Marketing Variances
Foundations and Evolutions
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
AMIS 3300 Chapter 9.
Standard Costs and Performance Reports
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets, Overhead Cost Variances, and Management Control
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Presentation transcript:

Planning of Variable and Fixed Overhead Costs Effective planning of VOH involves reducing non-value added costs & consumption of cost allocation bases FOH planning: appropriate level of capacity or investment that will benefit the company over an extended time period. Done much before the period begins.

Features of Standard Costing Standard input of allocation base for actual output Standard OH cost rate × Cost Object Direct Cost SQ X SP

Developing Budgeted Variable Overhead Absorption Rates Step 1: Choose the time period used to compute the budget. Webb uses a 12-month budget period. Step 2: Select the cost-allocation base. Webb budgets 57,600 MHs for a budgeted output of 144,000 jackets in year 2006.

Cont.. Step 3: Identify the variable overhead costs. Webb’s budgeted variable manufacturing costs for 2006 is Rs.17,28,000 Step 4: Compute the rate per unit of each cost-allocation base. Rs.17,28,000÷ 57,600 hours = Rs.30/MH

Cont.. What is the budgeted variable overhead cost rate per output unit (Jacket)? 0.40 MH allowed per output unit × Rs.30 budgeted variable overhead cost rate per input unit = Rs.12 per jacket (output unit)

Variable OH variances for April, 2006 Actual Flexible budget Output units 10,000 10,000 MHs/unit MHs 4,500 4,000 Variable OH Rs Rs Variable mfg. OH/MH Rs Rs VMOH/jacket Rs Rs.12.00

Variable Overhead Cost Variances Variable manufacturing overhead costs: Actual results:Rs.1,30,500 Flexible-budget amount:Rs.1,20,000 Variable mfg. OH variance = Rs.10,500(U)

Variable OH efficiency variance = [Actual qty. of VOH allocation base used for actual output – Budgeted qty. of VOH allocation base for actual output] X Budgeted rate per unit of allocation base = [4500 hours – 4000 hours] X Rs.30/hr. = Rs.15,000 U

Possible causes of adverse variance Cause: Less skilled workers Inefficient scheduling Bad machine maintenance Rush order acceptance Too tight standard Response: Hiring and training Improve Preventive maintenance Coordination between sales and production staff Revise/improve

Variable OH spending variance Actual quantity of inputs at actual rate 4,500 × Rs.29 =Rs.130,500 Actual quantity of inputs at budgeted rate 4,500 × Rs.30 = Rs.1,35,000 Rs.4,500 F Variable overhead spending variance

Reasons  % increase in MHs = 12.5  % increase in Variable OH cost = 8.75 Why: 1.Actual price of inputs included in VOH may be less 2.% increase in actual quantity usage of individual items in VOH is less than % increase in MHs

Cont… Reasons: Skillful negotiation Bad quality indirect material Oversupply in the market Is a favourable spending variance always desirable? Not always! (low-quality indirect material, less talented supervisor, bad maintenance)

Variable Overhead Variances- Summary Flexible-budget variance Rs.10,500 U Efficiency variance Rs.15,000 U Spending variance Rs.4,500 F

Developing Budgeted Fixed Overhead Allocation Rates Step 1: Choose the period used to compute the budget. The budget period is typically twelve months. Why should you use annual rates? Step 2: Select the cost-allocation base. Webb budgets 57,600 MHs for a budgeted output of 1,44,000 jacket in year 2006.

Cont… Step 3: Identify the fixed overhead costs. Webb’s fixed manufacturing budget for 2006 is Rs.33,12,000. Step 4: Compute the rate per unit of cost-allocation base: Rs.33,12,000÷ 57,600 = Rs.57.50

Cont.. What is the budgeted fixed overhead cost rate per output unit (jacket)? 0.40 hours allowed per output unit Rs budgeted fixed OH cost rate per input unit Rs.23 per jacket (output unit) × =

Fixed OH cost variances Actual Costs Incurred Rs.2,85,000 Flexible Budget: Budgeted Fixed Overhead Rs.2,76,000 Rs.9,000 U Fixed OH spending variance [also, Fixed OH flexible-budget variance] –

Cont… Reasons for unfavourable Fixed OH spending variance: Higher plant leasing cost, higher depreciation, higher supervisory salary

Production-Volume Variance Flexible Budget: Budgeted Fixed Overhead Rs.2,76,000 Fixed Overhead Allocated Using Budgeted Input Allowed for Actual Output Units Produced 0.40 X 10,000 X Rs.57.50=230,000 Rs.46,000 U Production-volume variance 2,000 (jackets not produced) × 0.40X Rs = Rs.46,000 –

Fixed Overhead Variances Fixed overhead variance Rs.55,000 U Volume variance Rs.46,000 U Spending variance Rs.9,000 U

Interpreting the Production- Volume Variance Had Webb manufactured 12,000 jackets instead of 10,000, allocated fixed overhead would have been = Rs.2,76,000 (12,000 × 0.40× Rs.57.50) Had Webb manufactured 12,000 jackets instead of 10,000, allocated fixed overhead would have been = Rs.2,76,000 (12,000 × 0.40× Rs.57.50) No production-volume variance would have occurred. No production-volume variance would have occurred.

Cont…  Lump-sum fixed costs represent cost of capacity acquired  Many a times capacity can be added in lump-sum fashion Why the unused capacity? Weak demand/poor quality/product and marketing strategy/strategic mistake

Integrated Analysis A 4-variance analysis presents spending and efficiency variances for variable overhead costs and spending and production-volume variances for fixed overhead costs. Managers can reconcile the actual overhead costs with the overhead amounts allocated during the period.

Integrated Analysis Actual manufacturing overhead incurred: Variable manufacturing overheadRs. 1,30,500 Fixed manufacturing overhead 2,85,000 TotalRs. 4,15,500 Overhead allocated: Variable manufacturing overheadRs. 1,20,000 Fixed manufacturing overhead 2,30,000 TotalRs. 3,50,000 Amount underallocatedRs. 65,500

Integrated Analysis 4-Variance Analysis: Variable manufacturing overhead: Spending variance Rs. 4,500 F Efficiency variance Rs.15,000 U Fixed manufacturing overhead: Spending variance 9,000 U Volume variance 46,000 U Total Rs.65,500 U

Integrated analysis 3-Variance Analysis Variable and fixed manufacturing overhead: Spending variance Rs.4,500 F + Rs.9,000 U = 4,500 U Variable manufacturing overhead: Efficiency variance 15,000 U Fixed manufacturing overhead: Volume variance 46,000 U Total Rs.65,500 U

Home task 2-Variance Analysis 1-variance analysis Production volume variance and Sales volume variance

Financial and Nonfinancial Performance Overhead variances are examples of financial performance measures. What are examples of nonfinancial measures? Actual labor time, relative to budgeted time Actual indirect materials usage per labor-hour, relative to budgeted indirect materials usage