© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.

Slides:



Advertisements
Similar presentations
Standard Costs and Variances
Advertisements

Chapter 11 Standard Costs and Variance Analysis
CHAPTER 10 The Need for Standards Standards Are common in business They are often imposed by government agencies (and called regulations) Standard costs.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Eleven Standard Costs and the Balanced Scorecard.
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 23.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
Chapter 7: Standard Costing and Variance Analysis
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
23 Performance Evaluation Using Variances from Standard Costs
Standard Costs and Balanced Scorecard
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
Cost Accounting: Foundations and Evolutions, 8e Kinney ● Raiborn © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Chapter 21 Flexible Budgets and Standard Costing.
1 Module 22 Standard Costs and Variance Analysis.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 The Flexible Budget and Standard Costing Chapter 13 Objectives: Develop and.
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
Performance Evaluation Through Standard Costs
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Standard Costs.
Standard Costing and Variance Analysis
Variance Analysis Topic Six by Dr. Ong Tze San
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Chapter 10 Standard Costs and the Balanced Scorecard.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 11.
Chapter 22. Prepare a flexible budget for the income statement.
Chapter 8 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Standard Costs.
STANDARD COSTING Setting Standard and Analyzing Variances Pertemuan 3, 4 dan 5 Matakuliah: > Tahun: >
Standard Costing and Variance Analysis
Chapter 9 Introduction to a Standard Cost System.
Accounting Principles Using Excel for Success PowerPoint Presentation by: Douglas Cloud, Professor Emeritus Accounting, Pepperdine University.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 17 Overhead Cost Management Flexible Budgets.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
C Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, or posted to a publicly accessible website, in whole or in part.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Cornerstones of Managerial Accounting, 5e
Standard Costs and Variances
Chapter 20: Standard Costing: A Managerial Control Tool
Foundations and Evolutions
Topic Six by Dr. Ong Tze San
Standard Cost Accounting Materials, Labor, and Factory Overhead
© 2017 by McGraw-Hill Education
Chapter 20: Standard Costing: A Managerial Control Tool
© 2017 by McGraw-Hill Education
Standard Costs and the Balanced Scorecard
Presentation transcript:

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Chapter 7: Standard Costing and Variance Analysis Cost Accounting Principles, 9e Raiborn ● Kinney

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Learning Objectives Why are standard cost systems used? How are material, labor, and overhead standards set? How are material, labor, and overhead variances calculated and recorded? How have the setting and use of standards changed over time? How does the use of a single conversion element (rather than the traditional labor and overhead elements) affect standard costing? (Appendix) How are variances affected by multiple material and labor categories?

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Why Use Standard Cost Systems A standard cost system tracks both standard and actual costs. This dual recording provides an essential element to cost control: having norms against which actual operations can be compared. Motivating Planning Controlling - variance analysis Clerical efficiency Decision making Performance evaluation

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Setting Standards Appropriateness Attainability  Expected standards  Practical standards  Ideal standards

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Standards Standard costs are budgeted costs to  manufacture a single unit of product, or  perform a single service To develop standards, identify  material and labor types, quantities, and prices  overhead types and behavior

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Material Standards Materials used  Types  Quality  Quantity  Price From  Product specifications, observation, inquiry  Bill of materials Balance cost, quality, and projected sales price

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Labor Standards Labor used  Types Production, setup, cleanup, and rework  Quantity  Cost Include wages, payroll taxes, and fringe benefits From  Industrial engineering studies including methods- time measurement (MTM), time and motion studies, and historical data  Operations flow document

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Overhead Standards Variable and fixed manufacturing overhead Estimated level of activity Estimated costs Predetermined factory overhead application rates

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. SP x SQAP x AQ Total Variance AP = actual cost/price per unit of materials or hours of labor AQ = actual quantity of materials or hours of labor SP =standard cost/price per unit of materials or hours of labor SQ =standard quantity of materials or hours of labor Inputs Outputs

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Material Price Variance (MPV) AP x AQSP x SQ Total Variance SP x AQ MPV (AP - SP) x AQ * * Favorable or unfavorable What was paid What should have been paid

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Material Price Variance Calculate Material Price Variance at  point of purchase, or  when materials used

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Material Quantity Variance (MQV) AP x AQSP x SQ Total Variance SP x AQ MQV (AQ - SQ) x SP * * Favorable or unfavorable What should have been used for level of output What was used

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Labor Rate Variance (LRV) AP x AQSP x SQ Total Variance SP x AQ LRV (AP - SP) x AQ * * Favorable or unfavorable What was paid What should have been paid

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Labor Efficiency Variance (LEV) AP x AQSP x SQ Total Variance SP x AQ LEV (AQ - SQ) x SP * * Favorable or unfavorable What should have been used for level of output What was used

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Variable Overhead Variances What should have been used for level of output For actual hours used VOH Spending Variance VOH Efficiency Variance Total VOH Variance SP x SQSP x AQ Actual VOH Budgeted VOH Applied VOH Actual

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. VOH Spending Variance Caused by price differences  managers have little control over prices Caused by shrinkage or waste  managers should be held accountable

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Fixed Overhead Variances SP x SQ Actual FOH Budgeted FOH Applied FOH FOH Spending Variance FOH Volume Variance Total FOH Variance What should have been used for level of output Constant Amount

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. FOH Spending Variance Calculate variance for each component Caused by price differences May reflect mismanagement of resources

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. FOH Volume Variance Calculate variance for each component Measures capacity utilization Caused by producing at a level that differs from the capacity level used to compute the predetermined overhead rate Also called the noncontrollable variance

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Questions Why are standard cost systems used? How are standards set for material, labor, and overhead? How are material, labor and overhead variances calculated and recorded?

© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part. Potential Ethical Issues Setting high standards to create favorable variances Ignoring effects of one production area on another Setting overhead rates too low based on high production levels to distort inventory cost and operating income Producing inventory only to create a favorable volume variance Not updating standards so that favorable variances are created Using low quality materials or labor to create favorable variances and low quality products