1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 MICE phase I - Project Status Richard Apsimon (Project Manager) & Andy Nichols (Technical Coordinator) … with considerable help from Ken Long! MICE Video.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE CM19 Synopsis Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Video Conference.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE Target Report Video Conference 29/11/07
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

MICE status

Mice layout Beam line elements (including channel magnets) Detector components Civil Engineering Software target Decay Solenoid Beam Stop Tracker and solenoid TOF0

Target Beamline Elements Shaft – magnetically suspended. Kicked into the beam be electromagnets and then pulled back out. (80g) Challenges Deliver the acceleration – current, magnetic field, cooling Bearings – in vacuum – no lubricant. Failure compromises ISIS running. Status Acceleration solved, can intercept one pulse of the 50Hz from ISIS and be clear by next injection. Bearing – problems. Two targets One is ISIS providing beam One outside ISIS running ahead by a factor three to “prove” to ISIS not going to fail It failed after 340,000 activations Wear on the shaft led to debris in the bottom bearing and the shaft jammed. Search Currently for cause of problem Jacking mechanism to allows ISIS to run, but debris in the vacuum chamber is a problem

Must remove this sharp edge DLC removed from lower bearing Ditto upper bearing Effects of seizure On target bearings Beamline Elements Target Wear

Target Beamline Elements Shaft – magnetically suspended. Kicked into the beam be electromagnets and then pulled back out. (80g) Clear signs of wear Coating of diamond like carbon thinner than previously but no sign of bubbling or delamination Wear on one side but mechanical alignment well within tolerances electromagnetic alignment magnets are all functional coils are all working possibility of partial damage or loss of fields being investigated Size of force needed to distort the bar being investigated by FEA can acceleration distort bar. Finished by ?? Needed for Beam

Target Magnets Beamline Elements Measurements last Friday on one permanent magnet ( very preliminary ) Home built setup – measure 1600 points (manual). Step size 9 degrees in phi. 0.1mm in z. Estimated accuracy 5 milliTesla..

Tribology Beamline Elements Discussions with tribologist at Sheffield have suggested a number of possiblities. The first point was the fact that shaft and bearings are both covered with diamond like coating is seen as a disadvantage. Surfaces of the same material are more likely to stick and rub. Bearing electro-polish after wire erosion and then cover with Chromium-nitride. or apply eletroless Nickel-Phosophorus coating. Chemical coating means the bearing could be a simpler two piece bearing instead of quadrants Shaft Electro-polish – look at changing to a Titanium Alloy with better mechanical properties, but need to check radiological implications Cover with a nitride coating before the Diamond Like Graphite. Makes the surface stiffer as well as harder. Ideas, and progress, but no firm timnescales

Decay Solenoid Beamline Elements Superconducting Solenoid Captures muons from pion decay. Increases event rate by a factor close to 10 (according to calculations) Won’t superconduct Open the magnet Remove the solenoid opens a hole into the vault. Withdrawing all the cold mass Moving dipole Lifting out quadrupole Taking down the wall Best Estimate Simple Heat leakRepair during October shutdown Coil 10½ cold mass out at Christmas Don’t have to take down wall Worst Case Coil 10 irrepairable – link out and run with 9 coils Synchrotron vaultWithdraw D2 DSA wall Polyanna outcome

Decay Solenoid Beamline Elements Finished by first run Needed for muon flux Withdraw D2 Re-install rails Remove part of Shield wall

Spectrometer Solenoids Beamline Elements Spectrometer Solenoids Provide the field for the trackers to allow measurement of particle trajectory and calculation of beam emittance Delivery delayed but discover of problem with helium venting in the case of a quench. Problem solved, needs modification to solenoid 1, different parts for solenoid 2. Finishing Solenoid 2 first, then correct 1. Delivery to Fermilab of first one, October Measurement of field using the zip tracker. Delivery to RAL – late 2008, early Integration and safety tests two months. Ready to run March Beam characterisation (momentum and emittance) in different running conditions. Busy until delivery of the second solenoid later in Measure emittance before and after cooling Before RF delivered can look at “heating” produced by an absorbers (Heating = emittance – absorber – emittance) Finished by end Feruary 2009 Needed for heating/cooling measurement

Future Beamline Elements Focus Coils Second design review with Tesla next month. Coupling Coils Production continuing in Harbin Delayed – effect on MICE unclear. Hydrogen system Hazop safety reviews in October. Coupling Coils Focus Coils Hydrogen Cavities

PID Detector TOF0 In position – producing signals – preparing to calibrate TOF1 Delivery by the 20 th October Cerenkovs Installed and running KL In place – need beam in the hall to check out and calibrate

Tracker Detector Subject of a detailed review by Malcolm Ellis.

LiH Detector Containers have been finished by CERN/Geneva. Heard from CERN today they are now shipping to RAL. LiH itself is being organised by Alan Bross. Andy Nichols is working on safety and Risk Assessment together with method statements. Expected by the end of ‘08 Arriving well before the second spectrometer solenoid End 2009 Needed for heating/cooling measurement

RF Detector Cern Amplifiers are finished Daresbury finished by December – completes phase 1 RF infrastructure project (from amplifiers to cavity) review in October – progress on understanding the details of the tasks which need to be complete Orders have been placed for cavities which are long lead items. Final design review October

Beam Stop Civil Engineering Allows access to the hall while beam is running in the synchrotron. Allows us to rapidly put beam into the MICE channel when work in the hall is finished

Shield Walls Civil Engineering

CE Schedule Civil Engineering North shield wall started. False flooring imminent Hall cleared by the end of November

Software Online Focussing on the online reconstruction, with TOF applications already used in the control room to reconstruct beam profiles and time of flight.. Last week made contact with Atlas centre to start data transfer to tier1 for backup and distribution. Tests with the reconstruction of the tracker 1 with cosmic ray data. → We should be able to reconstruct about events per second with the new online cluster Work on G4Mice by Chris Rogers

Beam Physics Electron Beam Last weekend we established an electron beam into the DSA. Allows us to improve the PID algorithms by running electrons into the calorimeter (low energy so little else gets through and none of that at c) Gives us a clock to calibrate the TOF counters. Running target is mundane (not expert last weekend). Running DAQ and online monitoring is becoming so. We have a running experiment, into which we are integrating the parts Unfortunately some major parts remain to be integrated