September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.

Slides:



Advertisements
Similar presentations
Critique of PU A&T Site Plan Alain L. Kornhauser, PhD 11/29/
Advertisements

Full Kornhauser. Full Kornhauser Issues Not surprisingly, tunneling to Palmer Square is no easy matter. The tunnel route must go under road infrastructure,
Access & Circulation to a Moved Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
CITY OF MIAMI CITY OF MIAMI. Health District Traffic Study July 21, 2008 Miami Partnership.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
APTA BRT Conference Seattle, Washington WHAT IN THE WORLD? AUSTRALIAN BUS RAPID TRANSIT – THE BRISBANE BUSWAYS Stephen Lucas Immediate Past Chairman Bus.
An Advanced Transit Alternative for The Princetons Alain L Kornhauser 24 Montadale circle Board Chair Advanced Transit Association Founder ALK Transportation.
California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
Lunar Research Station Tarrant Elementary School 4 th Grade Gifted Class Tarrant, AL.
1 Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
New Technology Feeder Systems Advanced Transit Association Seminar May 4-5, 2007 West Virginia University Morgantown, W V Robert Johnson R. E. Johnson.
NJ Transit Train Station “Consumer-shed” NJ Transit Train Station “Consumer-shed”
FOR LEASE Kenmark Corporate Center East & West San Mateo, California Kenmark WestKenmark East.
Florida State University Parking Analysis. Overview The designated site in question The designated site in question Data observed Data observed The “parking.
Addressing The Dinky Terminus Must Move Issue Alain L. Kornhauser Montadale Circle Township.
Circulation Solutions that Preserve the Current Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
TRANSPORTATION POLICY COMMITTEE FINAL REPORT AND RECOMMENDATIONS PROFESSIONAL AND TECHNICAL STAFF COUNCIL ALUMNI CENTER APRIL 2, 2003.
Access & Circulation to a Moved Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
UniversityCity Proposal for FY2012 TIGER Discretionary Grant MARCH 2012 FIU, City of Sweetwater and Miami-Dade Expressway Authority by FIU Maidique Campus.
Stop Sign This is a traffic sign. This means to stop. It helps us be safe when driving.
HSL Helsinki Region Transport Local Rail Projects in Finland Arttu Kuukankorpi Head of Route Network and Timetable Planning Group.
THE CANADA LINE Project Backgrounder
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Circulation Solutions for Alexander-University Congestion Alain L. Kornhauser 24 Montadale Circle Princeton Township.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
Statement of Alain L. Kornhauser, PhD NJ Historic Sites Council April 19, 2012 Trenton, NJ.
Alain L. Kornhauser, PhD Professor, Operations Research & Financial Engineering Director, Program in Transportation Faculty Advisor, Princeton Autonomous.
UMSL – METRO Partners since UMSL South Student Housing Approximately, Students.
Slides for Nov 1 Planning Board Meeting. The Arts Campus Can be built without touching the Dinky.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
Background B Case Studies & C. Public Improvement Plan Presented by: Erin Newton.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Sept. 17, 2014|3:00PM -5:00PM | ROOM 1E-113.
Mercer Corridor Stakeholder Committee November 4, 2015 Sound Transit.
San Diego Trolley. Current Current/future expansion Propose extension.
September 30, 2010 Whereas, Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale.
II. Facility Program, A. Providers HOUSTON INTERMODAL CENTER/MULTIMODAL TERMINAL.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Topographic Maps.
HOLLYWOOD PLAZA PARKING GARAGE BZA #VA APPLICANT: JOSHUA WALLACK APPELLANT: SCOTT A. GLASS HOLLYWOOD PLAZA PARKING GARAGE BZA #VA
Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.
Indian Hill Grade Separation City Council Meeting February 23, 2016.
Ardmore Station Presented to Lower Merion Commissioners by Carl Dranoff March 11, 2009.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
1 Eagle P3 Project Update FasTracks Monitoring Committee September 1, 2015.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Arizona Forward Update
planning and zoning committee presentation September 19, 2016
Potomac Yard Metrorail Station
Regional Roads Committee
Little Rapids Habitat Restoration St
Center City Connector 101.
NCC Education - Title Master
SKYTRAINS Sky Train has 79.6 km (49.5 mi) of track[4] and uses fully automated trains on grade-separated tracks running on underground and elevated guideways.
25th Avenue Grade Separation
25th Avenue Grade Separation
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Radical Improvements for the Area's Transportation System
Presented at Princeton Future Princeton Public Library, Princeton NJ
About Rio Grande Pacific Corporation
Presentation transcript:

September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle Princeton Township Presented at Princeton Future Princeton Public Library, Princeton NJ Andrew Koontz President, Borough Council, Princeton Borough

September 25, 2010 Whereas, Princeton University located a parking garage without adequate accessibility Dinky Station Parking Garage Fac ulty Road Alexander Road

September 25, 2010 Whereas, Princeton University wishes to create a barrier- free pedestrian plaza as part of its Arts Center Development Project

September 25, 2010 Whereas, Princeton University, without using any of its infinite wisdom, initiated a “Land Grab” by proposing that the Dinky Station be moved 450 ft.

September 25, 2010 Whereas, Princeton University, without using any of its infinite wisdom, initiated a “Land Grab” by proposing that the Dinky Station be moved 450 ft.

September 25, 2010 Whereas, This would be the 2 nd time the University has performed a “Land Grab” on the Dinky. The original station was moved “450 feet” to make room to create a “barrier free plaza” between Henry & 1901 etc.

September 25, 2010 Whereas, This would be the N th time the University has opposed rail accessibility to the center of Princeton. Two interurban trolley lines connected Trenton and Princeton. Both succumbed to the contemporary “Marv Reed’s BRT” which rapidly transformed into the “606”.

September 25, 2010 Whereas, by using just a little wisdom, one observes that the elevation of the Dinky tracks at it Canal crossing is approximately 42 feet 42 feet 42 feet

September 25, 2010 Whereas, one further observes that the Dinky tracks rise 66 feet so as to make a dangerous at-grade crossing with Faculty Road

September 25, 2010 Whereas, one further observes that the Dinky tracks rise another 37 feet to its current station location and creating the surface nuisance for the garage and the plaza 42 ft Canal Xing Elevation 42 ft Canal Xing Elevation Climb 66 ft to Faculty Road Xing Climb 37 ft to Current Station Location

September 25, 2010 Now After Let it be Resolved, To re-grade the Dinky line so that it climbs only 46 feet so that it can safely pass under Faculty Road

September 25, 2010 Now After Let it be Resolved, To re-grade the Dinky line so that it climbs only 46 feet so that it can safely pass under Faculty Road

September 25, 2010 Let it Further be Resolved, to continue the grading so as to relocate the Princeton Dinky Station 20 feet below its current location

September 25, 2010 Let it Further be Resolved, that NJ Transit grant “air rights” to Princeton University so that it can create a barrier free plaza and access drive to its parking garage Underground Dinky Station

September 25, 2010 Cover Over Development Opportunity Let it Further be Resolved, that with its “air rights”, Princeton University will make better use of its otherwise barriered land holdings along Alexander Road

–Enabling 24-7 operation (if need be) –Meet of all trains at Princeton Jct. –5 minute headway integration with P. Jct. Transit Village –Many proven technology options; for example: JFK Air Train Technology September 25, 2010 Let it Further be Resolved, that NJ Transit evaluate the feasibility of Modernizing the Dinky through Automation since its tracks are now completely grade-separated

September 25, 2010 JFK Air Train Technology Linear Induction Motor Propulsion Completely Automated Other Implementations –Vancouver, BC SkyTrain SkyTrain Largest system 1 st opened in 1985 –Kuala Lumpur (1998) –Detroit (1987)) –Toronto (1985) –Yongin, South Korea (under construction) –Beijing Airport Line (2008) Video Outside Video VideoOutside Video

September 25, 2010 Let it Further be Resolved, Automation of the Dinky would enable the University to add an additional station east of the canal enabling intelligent accessibility and development of those lands

September 25, 2010 Whereas, The natural contour of the land is such that the elevation of the Kiosk at Palmer Square is 43 feet above that at the current Princeton Station 188 feet 188 feet 145 feet 145 feet

February 16, 2010 Whereas, Princeton University will have granted NJ Transit the right to tunnel under its campus at some future date 1,700 feet 1,700 feet

September 25, 2010 Let it Further be Resolved, that NJ transit undertake a thorough study of the engineering and economic implications of extending the Dinky to an underground station at Palmer Square