1 Intermediate Data Review Intermediate Data Review.

Slides:



Advertisements
Similar presentations
JQuery MessageBoard. Lets use jQuery and AJAX in combination with a database to update and retrieve information without refreshing the page. Here we will.
Advertisements

MS. HOWARD 1 ST PERIOD. Go through course syllabus and classroom policies Create gmail account ( should have done in homeroom Send to Ms. Howard.
Meet Manager Training Updated April Step 1: Set up your meet Download the meet template Restore the template Purge Old Data Setup Meet Information,
Help File For User Creation Click the “Course” button for Creating/Add User.
Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
Adding Polynomials with Miss Pennington Click to begin!begin.
Accounts Payable–1099 Processing 1Freedom Systems – Accounts Payable – 1099 Processing WELCOME TO THE ACCOUNTS PAYABLE – 1099 PROCESSING WEBINAR WE WILL.
Blogs – what, why and how? A blog is a web-log It is a simple website that anyone can setup without any advanced computer know-how It’s the future: blogs,
Alice Variables Pepper. Set to Java look Edit / preferences restart.
Fundamentals of Programming in Visual Basic 3.1 Visual basic Objects Visual Basic programs display a Windows style screen (called a form) with boxes into.
Scratch Understanding some programming techniques using Scratch Resetting, Parallelism and Events.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Outlook Project 2 Scheduling Management and Instant Messaging Using Outlook.
1 ONE TIME PRINT SETUP To print Requisitions from Banner, follow this process once: Open Microsoft Excel, select (1) TOOLS, then (2) MACROS, then (3) SECURITY.
Scratch the Cat. Object Oriented Programing Writing computer programs Based on Objects Instead of Actions Based on Data Instead of Logic.
1 Continuous Pollutant and Meteorological Data Continuous Pollutant and Meteorological Data.
Hello World In C++ and Microsoft Visual C++. Directions to begin a project 1. Go to All Programs 2. Open Visual Studio C++ 3. Click on New Project 4.
Code Club Session 2 Dance Party. What will we learn ?  How to change the background  How to create animations  How to make objects talk to each other.
Orchard, Let’s Get Started Teachers! Reading Language Arts Math In 5 Easy Steps!
*** CONFIDENTIAL *** © Toshiba Corporation 2008 Confidential Scheduling Reports.
Intro to MFC. Open VS and create new project 1)Open MS Visual Studio 2008 Professional (It must be the Professional Edition, the Express Edition will.
Easy Access with Templates II: Modify a database Overview: Change is at hand You’ve just created a new database using a template, but you’ve decided that.
1 AQS Introduction AQS Introduction Angelique Luedeker ITEP.
PAYROLL YEAR END PROCESSING 1 Use your keyboard arrow keys to move forward and backward through the presentation. Press ESC to exit out of the presentation.
Teaching a character to walk in more than one world: Parameters and Inheritance. By Lana Dyck under the direction of Professor Susan Rodger Duke University.
Patrick Bailey, MS IDIS110 Dreamweaver Setup. IDIS110 - RIT After you start Dreamweaver On the first time, if you are asked, select “Design Mode” Otherwise,
Wiki How to masterfully create your own webpage….
Project Deployment IT [211 CAP] How to convert your project to a full application.
How to Post my Response. Click! To reply or respond to an existing topic/question, start by reading the message in the topic. Reply from within each.
Playing Music in Alice By David Yan Under the direction of Professor Susan Rodger July 2015.
Suspend/Remove/Restore Transit Benefits Jessie has decided to leave her employment with your company. You have already paid WMATA for her benefits for.
1 Tribal Data Toolbox Overview Melinda Ronca-Battista Angelique Luedeker ITEP.
CSD 340 (Blum)1 Using Visual Studio CSD 340 (Blum)2 Start/Microsoft Visual Studio 2005/Microsoft Visual Studio 2005.
An Introduction to Alice (Short Version) – Extras! Yossra Hamid Under the Supervision of Professor Susan Rodger Duke University, June 2014 This is a continuation.
Making Python Pretty!. How to Use This Presentation… Download a copy of this presentation to your ‘Computing’ folder. Follow the code examples, and put.
Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.
When I want to work with SQL, I start off as if I am doing a regular query.
Recording Your Script 1)Find a quiet place to record. 2)Open up your phone’s recording app. 3)When recording, remember: Speak very clearly Enunciate Do.
INTRODUCTORY GUIDE TO SURPLUS LINE INFORMATION PORTAL 2.0 (SLIP) CALIFORNIA’S ELECTRONIC FILING SYSTEM THE SURPLUS LINE ASSOCIATION OF CALIFORNIA SLIP.
How to Setup and Score a Tournament May Let’s Get Organized The setup and organization outlined in this clinic are suggested steps however can be.
How to make a digital portfolio SCC YEAR 1. Table of contents  1. Go to your digital portfolio  2. Make the document as your digital portfolio  3.
Testing External Survey Automatic Credit Granting Shepherd University Department of Psychology.
Customizing Reports Adding a Date to a Report Reference Window Adding a Date to a Report Display the report in the design view Click the Text Box Tool.
How to Complete FAFSA (Free Application for Federal Student Aid)
Controls for Choices. Let’s look at a couple of new controls: option buttons and check boxes These controls are designed to be used when you want the.
screen shots Emma Jarman. Adding attachments What is an attachment? An attachment is an that has a file attached to it. The file could be.
Logical Operators.  Quiz  Let's look at the schedule  Logical Operators 2.
If you don’t have Google Earth downloaded already, you can go to to get it.
 Review of operation and how to view your corrected work  Since I gave you the wrong information last week I will not feel good until I give you the.
Click your mouse for next slide Dreamweaver – Synchronizing your Site to a Network Drive In the first lesson we defined our site and we associated a root.
Recording Your Script and Creating Your Podcast !!You are not finished until you have completed all steps on all of the slides up to and including Slide.
Notify Me I want to be notified of important activities at my child's elementary school.
TDA Direct Certification
Adding animations. To add an animations to text or picture you have to click on the text or animation and on the top navigation bar click on animation.
Final Data Review and Invalidation
Learning Systems Design & Development (LSDD) Track
How to Build a Plan.
Mail Merge And Macros in MS WORD
Siebel CTI Program Functionality & SOP.
Error Handling Summary of the next few pages: Error Handling Cursors.
Final Semester Grades.
Contact QuickBooks File Doctor
Cookies BIS1523 – Lecture 23.
Conditions and Ifs BIS1523 – Lecture 8.
Final End of Year Grades
Java Tutorial – Application Building
Google Calendar Appointments
Blackboard Connect School to Home Communication
Blackboard Tutorial (Student)
How to Submit Google Docs to the Homework Drop Box
Presentation transcript:

1 Intermediate Data Review Intermediate Data Review

2 Initial Data Review Already Done During Import This qualification (flagging) was based onThis qualification (flagging) was based on Out-of-range concentrationsOut-of-range concentrations Error codes, very negative valuesError codes, very negative values QC checksQC checks Other data quality issues you knew of at that timeOther data quality issues you knew of at that time

Initial data review done back here (gaseous): 3

Or here (met): 4

Where is data now? All data in archive tablesAll data in archive tables Some data is flagged, based on your assigned flags during import processSome data is flagged, based on your assigned flags during import process Now you received an audit report, or remembered somethingNow you received an audit report, or remembered something Go to first green buttonGo to first green button 5

Intermediate Data Review: Logbook and External Info Data Flagging: 6

7 Intermediate Data Review You should perform this step quarterly, or when you get (or remember) new info:You should perform this step quarterly, or when you get (or remember) new info: Use this step two waysUse this step two ways To view data for anything you may have missed during importTo view data for anything you may have missed during import To qualify (flag) data based on other information that may have not been available during import (logbooks, audit reports, unusual events, any information that you have learned since doing the original import)To qualify (flag) data based on other information that may have not been available during import (logbooks, audit reports, unusual events, any information that you have learned since doing the original import)

8 When your data are already in the archive table, and now you have new information, go to Logbook and External Info Flagging button

Top green button opens form with 4 boxes (4 types of data): 9

10 Buttons let you view all data, flagged and unflagged (ex: Continuous PM10) Select the data you want to view, then click here

11 The view data button pulls up the query window showing data for those dates/times: Some data points have already been qualified (flagged) during import (1 st tier of data review)Some data points have already been qualified (flagged) during import (1 st tier of data review)

12 What if my audit reports tells me to qualify some of the data? Let’s say we look at our logbook and determine that data from 10 AM until 1 PM on 7/1/03 need to be qualifiedLet’s say we look at our logbook and determine that data from 10 AM until 1 PM on 7/1/03 need to be qualified Change the range to only that of the data you need to qualify… then click here

13 Intermediate Data Review (cont.) A few message boxes will come up about changing dataA few message boxes will come up about changing data Click OK or Yes on each of themClick OK or Yes on each of them The Toolbox then adds qualifiers (flags) to the data you selectedThe Toolbox then adds qualifiers (flags) to the data you selected Remember to note this in your Toolbox Logbook, especially if you are using information from a phone call, etc. as the basis for adding these flagsRemember to note this in your Toolbox Logbook, especially if you are using information from a phone call, etc. as the basis for adding these flags

14 Let’s see what we did Change the range back to the entire two week period… then click here

15 And the results are… Qualifiers we just added

16 List of toolbox qualifiers: The full list of qualifiers at the end ofThe full list of qualifiers at the end of SOP for Final Data Review and Invalidation

If you are done for now, close form: 17

OR, If you are ready to review data for AQS file generation: 18