Costing Low Impact Stormwater Devices Éva-Terézia Vesely Michael Krausse André Taylor Earl Shaver Institute for Sustainable Water Resources.

Slides:



Advertisements
Similar presentations
Measuring social added value A model for public authorities
Advertisements

Il Project Cycle Management :A Technical Guide The Logical Framework Approach 1 1.
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
Measuring social added value A model for public authorities Floriana Nappini [ Network: Better Future.
How do we achieve cost effective cancer treatments in the UK? Professor Peter Littlejohns Department of Public Health and Primary Care.
1 Information Systems Development (ISD) Systems Development Life Cycle Overview of Analysis Phase Overview of Design Phase CP2236: Information Systems.
Principles of Food, Beverage, and Labor Cost Controls, Ninth Edition.
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
@TxSchoolSafety Continuity of Operations Planning Workshop Devolution & Reconstitution.
ICASAS305A Provide Advice to Clients
Software Quality Assurance Inspection by Ross Simmerman Software developers follow a method of software quality assurance and try to eliminate bugs prior.
Chapter 3 Asset Management. 2 Asset management Asset management = infrastructure management Infrastructure management = Capital management = Asset management.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
1 Pertemuan 4 Auditing Standards and Responsibilities Matakuliah:A0274/Pengelolaan Fungsi Audit Sistem Informasi Tahun: 2005 Versi: 1/1.
Auditing A Risk-Based Approach To Conducting A Quality Audit
03 July 2015Course Overview1 Energy Project Evaluation RES Course ESP606 Goal: To build up knowledge to so that participants will be able to assess if.
SQA Architecture Software Quality.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Igal Kaptsan Research Director Applied Research, Bentley Systems Change Management.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Cost Analysis of Military Training Marcel C. Smit SAS-095 workshop on Cost-Benefit Analysis of Military Training Amsterdam, The Netherlands 5-6 June 2012.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Expressing Environmental Impact in Monetary Units - Environmental Accounting/Costing Approaches.
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Follow us on: PATH Performance Management Overview of Performance Management for HR Liaison Network February 7, 2013.
Information Integration in Construction. Construction information In construction, architects, engineers, planners, contractors, facility managers....
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
An Online Knowledge Base for Sustainable Military Facilities & Infrastructure Dr. Annie R. Pearce, Branch Head Sustainable Facilities & Infrastructure.
MUS pilot project in Honduras Testing guidelines for planning and implementation of multiple use services.
Environmental auditing
Unit 8 COST ISUITE-EP. Objectives Be able to: 1.Identify the purpose of the COST module. 2.Run Cost Processes 3.View Daily Costs 4.Generate Cost.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
THE ECONOMICS OF LOW IMPACT STORMWATER MANAGEMENT GLENCOURT PLACE Éva-Terézia Vesely Jan Heijs Chris Stumbles David Kettle.
Project Life Cycle.
RBM and Asset Strategy.
1 Climate Change Adaptation Initiatives – Assessing the Vulnerability of Infrastructure: Tools Background on the PIEVC Project APEGGA-Engineers Canada.
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
Support to Water Users and to Services for Farmer Water Users’ Communities Projet d’Appui aux Irrigants et aux Services aux Irrigants ASIrri MOWRAM/AFD.
Copyright © 2007 Pearson Education Canada 5-1 Chapter 5: Audit Responsibilities and Objectives.
1 Dr. Nancy L. Spruill Director, Acquisition Resources & Analysis, OUSD(AT&L) Restructure of Business Career Field.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Strategies for Managing the Online Workload CADE 2003 St. John’s Newfoundland June, 2003.
Cost Management.
Life-cycle cost analysis (LCCA)
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Oktalia Juwita, S.Kom., M.MT. SYSTEMS DEVELOPMENT Dasar-dasar Sistem Informasi – IKU1102.
GIS Implementation: Issues and Strategies RNR-GEOG 417/517 Fall, 2000.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Chapter 6 SYSTEMS DEVELOPMENT Phases, Tools, and Techniques.
MANAGEMENT INFORMATION SYSTEM
Cowlitz County, WA Accounting Function Review
Interagency Coordination in Long Range Transportation Planning
Projects, Events and Training
Developing the Overall Audit Plan and Audit Program
Capital Project / Infrastructure Renewal – Making the Business Case
TechStambha PMP Certification Training
Classical Waterfall Model
The Enterprise Relevant Scope of DM
Manage Project Costs Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG504A.
Configuration Control and the Standard Nuclear Performance Model
Evaluation in the GEF and Training Module on Terminal Evaluations
Chapter 8 Software Evolution.
Preliminary Draft 2019 Operating and Capital Budgets
Information Systems Development (ISD) Systems Development Life Cycle
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Bay Area Watershed Network
Presentation transcript:

Costing Low Impact Stormwater Devices Éva-Terézia Vesely Michael Krausse André Taylor Earl Shaver Institute for Sustainable Water Resources

Windows of Opportunity for Low Impact Design STORMWATER INFRASTRUCTURE Age Distribution Typical Lifetime REPLACEMENT infrastructure inertia lock in effects / path dependency windows of opportunity to explore alternative design

Assessing Alternative Design Options A shift in our approach to stormwater management will be easier accepted if proven necessary and feasibile. Tools: -Life Cycle Costing -Life Cycle Assessment -Cost Benefit Analysis

Life Cycle Costing Australian and New Zealand Standard (AS/NZS 4536:1999) Life cycle costing is the process of assessing the cost of a product over its life cycle or portion thereof. Life cycle cost is the sum of acquisition and ownership costs of an asset over its life cycle from design stage through manufacturing, use, maintenance and disposal.

Life Cycle Costing Costs and the Phases of the Life Cycle (AS/NZS 4536:1999)

Life Cycle Costing in Use Comparisons Design improvement Cost sharing Budgeting Financial sustainability

Estimating the Cost Elements (Emblemsvåg, J Life Cycle Costing: Using Activity Based Costing and Monte Carlo Methods to Manage Future Costs and Risks, John Wiley & Sons, New Jersey.) Analogy method Parametric method Engineering method Cost Accounting method

Calculation Models Deterministic – a single value Stochastic – probability distributions Fuzzy – linguistic expressions & fuzzy sets (Boussabaine, A. and Kirkham, R Whole Life Costing: Risk and Risk Responses, Blackwell, Oxford.)

The New Zealand Experience COUNCILS: Category 1: “Yet to implement” Category 2: “Have some data, but lack resources to extract it” Category 3: “Data available but …"

The ARC-MUSIC Initiative February 2005: “Life Cycle Costing in the Context of Low Impact Stormwater Design” workshop New Zealand Life Cycle Costing Project

NZ LCC Project Steps: 1.Draft and refine the data collection protocol 2.Gather costing data 3.Analyse data and define costing relationships 4.Compare the NZ and Australian datasets 5.Code relationships in MUSIC version 4 6.Report findings of the project 7.Launch MUSIC version 4 and conduct training

LCC Data Collection Form The Goal: to record NZ cost data in a comprehensive and consistent manner.

LCC Data Collection Form The form: consistent with the intent and terminology of the AS/NZS 4536:1999. It covers: A.Description of the stormwater treatment measure B.Key design details C.Cost Elements i.) Acquisition ii.) Routine Maintenance iii.) Corrective Maintenance iv.) Decommissioning D. Document control

LCC Data Collection Form Cost Elements: -real cost -without GST -in the financial year in which they occurred -C (conceptual cost), E (engineer’s estimate), A (actual cost) The cost of land is exluded from the acquisition cost (but it is included as a separate question in the form). It explores: - variation of the routine maintenance costs over the first few years - details on corrective maintenance costs - unusual cost elements and circumstances

Where to from here? GATHER COSTING DATA ANALYSE COSTING DATA NZ LCC MODULE in MUSIC version 4 UPDATE

Acknowledgements The authors are grateful to stormwater professionals from around New Zealand for sharing their experience. Further thanks to all those who participated in the ‘LCC in the context of Low Impact Stormwater Design’ workshop and to the ARC for initiating and co-ordinating the NZ LCC project.