Current Construction Projects Major Projects Pinellas County.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Delmar Boulevard bridge replacement over Interstate 170.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
CR 46A Realignment (Section 5)
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
NC 73 Small Project Scoping Process Update June 24, 2014.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Capital Improvement Projects 2014 A Snapshot of Current Construction Activity in the City of Irvine.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Community Development Department Construction Phase.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
PROJECT 123(14) LOR PID INTERCHANGE IMPROVEMENT PARTNERING RE-CONNECT MEETING NOVEMBER 19, 2015.
California Transportation Commission September 19, 2007 Rocklin, CA KEEPING PLACER MOVING PCTPA, Caltrans, and CTC.
Metro Highway Program Presentation to CMAA Abdollah Ansari
STA US-30 Presentation for TRAC – October 13, 2015
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
New Jersey Turnpike Authority November 19, 2009 New Jersey Turnpike Interchange 6 to 9 Widening Program Presented by Lisa M. Kenney, P.E. 1.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Eastham Water System Board of Selectmen Meeting April 25, 2016.
Chapin Town Hall Meeting
Interstate 15 North Phase 4
Col. Pike Multimodal: About the Project
US26: Cornelius Pass Rd -185th Ave
Highway 169 Bridge Replacement & Pavement Resurfacing
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Issaquah-Fall City Road
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
2019 Capital Program Title of Presentation
Metropolitan District | mndot.gov
Presentation transcript:

Current Construction Projects Major Projects Pinellas County

43 rd St Extension – New Roadway from S of 118th Ave. to 40 th St.

The 43 rd St extension is a new two lane roadway connecting 118 th Ave. to 40 th St. It is being built in preparation of the Gateway project. The contractor has completed construction of several ponds and is now working on the new roadway. Pepper Contracting Services began the $5.3 million project in August 2014 and is scheduled to be finished by the end of this year.

Ulmerton Road - Widening from Lake Seminole Bypass Canal to Ranchero Blvd.

The $23.5 million project will widen Ulmerton Road from four to six lanes. When complete, SR 688 (Ulmerton/Walsingham Road) will be a six lane roadway from the Indian Rocks Bridge to 49th St. Currently the contractor is building new medians and travel lanes while continuing to build new and relocate existing utilities along the corridor. Conalvias USA began construction in January 2012 and is anticipated to be complete in the spring of next year.

Ulmerton Road - Widening from E of 49 th to W of 38th

The $19.3 million project will widen Ulmerton from four to six lanes and remove the western Roosevelt flyover and replace it with a signalized intersection in preparation of the Gateway Project. The contractor is currently installing new drainage to accommodate the new wider roadway. David Nelson Construction Co. began work this past February and is anticipated to be complete in the fall of There is a bonus for the contractor on this project, that if achieved will result in a January 2017 completion.

Ulmerton Road - Widening from 38 th St to I-275

Ulmerton Road - Widening from 38 th St. to I-275 The $21.3 million project widens Ulmerton Road from four to six lanes, replaced the eastern Roosevelt flyover and created a new westbound access lane to 34 th St. The contractor is paving the top layer of asphalt and applying permanent striping. Highway lighting and signalization work is finishing up as well. The Lane Construction Corp. began construction in April 2013 and is anticipated to be complete at the end of this year, several months ahead of schedule.

US 19 – Widening/ New Interchanges from N of Whitney Rd to N of SR 60

US 19 – Widening/ New Interchanges from N. of Whitney Rd to N of SR 60 The project consists of removing the traffic signals on US 19 between Whitney Road and SR 60, constructing two new interchanges at Seville Boulevard and Belleair Road and rebuilding the SR 60 interchange. Remaining work includes painting the bridge beams, installing highway lighting and ITS components, paving the top layer of asphalt and applying the final striping. Hubbard Construction Company began the $119 million project in November 2009 and is anticipated to be complete this fall.

Gandy Blvd- Widening/New Interchanges from 9 th St to E of 4 th St.

The project includes building an elevated Gandy Blvd with frontage roads and interchanges at 94 th Ave., 9 th St. and 4 th St. Bridge construction over 94 th Ave., 9 th St. and 4 th St. is currently underway and the project team, Condotte/DeMoya anticipates opening the elevated section to traffic in the Summer of The $83.6 million design build project began in January 2014 and is anticipated to be complete in early 2017.