Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.

Slides:



Advertisements
Similar presentations
Supply presentation FACELIFT. Who Are We ? Design and Architectural Studio Construction and Trade Company Service Center.
Advertisements

HANSEN Hall Renovation
The Steiner Hall Renovation is proudly brought to you by: UWSP Residential Living Staff & Students, UWSP Facilities Services, University of Wisconsin System,
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Renovation of Building 4950 Fort Stewart, GA
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Newark CSD Phase II Capital Improvement Project Board of Education Report August 2013.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
SUNY Canton Facilities Project Update Miscellaneous.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Tower 4 Residence Hall Building Renovation & Asbestos Abatement IBC Engineering, P.C.
Magali Pauzié Magali Pauzié $1,000 $2,500 $5,000 $10,000 $25,000 $50,000 $75,000 $150,000 $1,000.
Civil Engineering & Architecture 2.3 Residential Design.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Crest Interior Systems Crest Interior Systems PORTFOLIO Click mouse or press Space bar to Continue.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
MICHIGAN STATE UNIVERSITY OWEN HALL REFURBISHMENT RE-ENERGIZING OWEN HALL.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
MSU/MCTC Law Enforcement and Criminal Justice Center March 10, 2010.
Elevations, Layout and Drawing Technique.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
1 Levine Hall (Upenn) Photo Analysis. 2 Very nice stairwell.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
DRAUGHON COMMUNITY ROOM Welcome to the
Work Progress Photos From 1 ST To 15 TH NOV 2015.
Smrha-Monroe Family Pictures of the House August 2005.
COZYEON Residence Main facilities gallery. Corridor of each floor.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Design Development Drawings 1. Code analysis: examine needed changes 2. Draw accurate existing plans/model 3. Indicate demolition 4. Indicate new wall.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
HANSEN Hall Renovation
Category 2 Small Renovation Project
TOBY ZACK DESIGNS LA MER
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
MACDONALD HOUSE CITY COMMISSION WORKSHOP / FEBRUARY 21, 2017
Click here for the LIVE WEBCAM
Facilities Services Department Meeting June 2016.
Capital Projects Requests
Click here for the LIVE WEBCAM
Assembly And Installation Of Ikea Kitchen Cabinets
INTD 503- Materials Topic: Partition Walls
2007 Bond Issue Capital Improvement Program
Value of contract: Length of contract: Contract start date:
KOMPLEX Investors Report – Q
Building & Property Committee
Minuteman Vocational Technical Regional High School Progress
Wates CBE Learning Operation defects: Snag sheet slide presentation
Minuteman Vocational Technical Regional High School Progress
Elevations, Layout and Drawing Technique.
PARK EAST CONSTRUCTION
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
Mowrey Hall Renovation
Presentation transcript:

Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New resident room lighting, Resident room door replacement, Patio reconstruction, & ADA compliant hardware. Before June 2, 2008 Demolition in progress. June 30,2008 Patio construction in progress.

LOBBY BEFORE… Elevator shaft cut in at lobby. (Former mailbox location). June 30, 2008 LOBBY NOW…June 2 – June 30 Lobby and front desk receive massive demolition to prepare for location of new elevator, mailboxes, front desk reconfigure & more... HD Office demo continues. June 30, 2008 Front Desk Demo. June 2, 2008 Lobby demo. June 2, 2008Lobby & HD Office demo. June 2, 2008

And the basement sees action too! FITNESS ROOM walls come down to make way for elevator shaft. COMPUTER LAB NOW… COMPUTER LAB BEFORE… STUDY LOUNGE BEFORE… STUDY LOUNGE NOW… June 2, 2008

Resident Rooms In Progress… Sprinkler system & heater placement in progress. June , 2008 Skimcoating of block walls on 4W begins. What a change! Painting of walls, door frames, new wood door install, casework, windows and new lights to follow. June 30, 2008 Arrival of New Windows! June 30, 2008

Resident floor corridors in progress… 4W corridor shows skimcoating in progress. Painting of walls, door frames and install of new wood doors to follow. June 30, 2008 View of cut-in elevator shaft & access panel from 4 th floor. (Former 440 resident room.) June 30, 2008 Tectum & ceiling tile removed to prepare for skimcoating, texturing and painting of ceilings and walls. June 2 -30, 2008