Washington Laboratories (301) 417-0220 web: www.wll.com7560 Lindbergh Dr. Gaithersburg, MD 20879 How to List a Test Site.

Slides:



Advertisements
Similar presentations
ESTeem RF Design Tools SECTION 4 - RF System Design.
Advertisements

Conducted Immunity IEC
Ground Systems for HF Verticals some experimental comparisons to NEC.
GTEM CABLE EMISSION STUDIES MEASUREMENT TECHNOLOGY LIMITED JUNE 29 TH 2010 Dr. Zaid Muhi-Eldeen Al-Daher Dr. Angela Nothofer Prof. Christos Christopoulos.
Doc.: IEEE /0346 Submission March 04 Niels van Erven, 3ComSlide 1 Proposal how to measure RF sensitivity for WPP Niels van Erven 3Com.
Wireless Data Acquisition and Control How Antennas Work Copyright © 2008 Wilkerson Instrument Co., Inc All rights reserved 3 Element Yagi Yagi Horizontal.
Chapter 13 Transmission Lines
Design MAN WLAN Onno W. Purbo Understanding.. WLAN Bandwidth Channels Propagation Designing the MAN Inserting Point to Point (P2P) Links.
A VISUAL AID TO PYROMETRY COMPLIANCE (A Guide To An Acceptable TUS Report) February 2010.
1 SCHOOL OF COMPUTER & COMMUNICATIONS ENGINEERING EKT 341/4 ANTENNAS AND PROPAGATION Lecturer: En. Rosmizi bin Abd Rahim Dr. Mohd Faizal Bin Jamlos PLV:
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to Create a Part 15C Report.
® 04/29/2002 CISPR 22, Amendment 1 Ferrite Clamps Ghery S. Pettit, NCE Intel Corporation Corporate Product Regulations.
Embedded Meets RF Evan Lojewski. RF Primer Terminology / Intro RF Options Certification.
Design Review: November 17,2011 Team Members: Allan Davis Carlos Gonzalez Cooper McBride.
Summary of Path Loss in Propagation
Current research work and plans Zbigniew M. Jóskiewicz Wroclaw University of Technology Institute of Telecommunication and Acoustics Wybrzeże Wyspiańskiego.
May 2005 Radio Research Laboratory Ministry of Information and Communication Designation of Testing laboratories.
Field Strength Measurements Relative to ARRL Concerns Regarding BPL October 16, 2003 Steve Martin Technical Research Branch Federal Communications Commission.
ESTeem Training Class Antenna Fundamentals. Decibels (dB) Used for all mathematical calculations in the radio world. – dB is a logarithmic number dB =10.
1 Cessna EME Lab Reverb Chamber Emissions Matthew Wills EME Lab Supervisor December 7th, 2004.
Technician License Course Chapter 2 Radio and Electronics Fundamentals
Introduction to Proposal Writing Proposal Development Team Office of Research & Sponsored Projects (ORSP) September 30, 2009.
General Licensing Class G9A – G9D Antennas Your organization and dates here.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Dispelling the CE Mark Myth: What’s Required for European.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to Create a Part 15B Report.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Opening the Door William H. Graff, AmericanTCB.
Doc.: IEEE /168r0 Submission March 2001 Stephen Berger, TEM Consulting Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Desert William H. Graff President and Director of Engineering,
Copyright 2005 International EMC Standards Activity 1 EMC International Standards Update CISPR SC A and I Activity Don Heirman Don HEIRMAN Consultants.
Lecture 16 In this lecture we will discuss comparisons between theoretical predictions of radiation and actual measurements. The experiments consider simple.
GPS Outfitters GPS Reradiation Presentation IRAC 10/28/2005.
BICON / HYBRID COMPARISON Performed by members of the TCB Council ANSI C63 SC 1 April 18, 2012.
EMC Evaluation at Green Bank: Emissions and Shield Effectiveness National Radio Astronomy Observatory Carla Beaudet Green Bank RFI Group Leader.
General Licensing Class Coax Cable Your organization and dates here.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
USCEL Third Run EMI Round Robin Roland Gubisch Intertek.
They are not the same Dennis Ward ATCB. The FCC has a requirement that Applications for certification through the TCB program must contain test reports.
Microwave Engineering, 3rd Edition by David M. Pozar Copyright © 2004 John Wiley & Sons Figure 13.1 (p. 634) Photograph of various millimeter wave antennas.
Measurements using a GTEM cell above 1GHz Dr Tian Hong LOH.
Yi HUANG Department of Electrical Engineering & Electronics
© Copyright 2002 TEM Consulting, LP - All Rights Reserved Presentation To Portland & Seattle EMCS ChaptersRev – 04/25/02 - HSB Revision of ANSI C63.4 -
EMC Generals and Testing Technologies
Doc.: IEEE /1133r0 Submission Aug 2011 Zander Lei, I2R SingaporeSlide 1 Singapore Sub 1GHz Frequency Bands for IEEE ah Date: Authors:
March 14, 2002 (revised 2/13/2002) 1 Version of CISPR 22 used in the United States by the FCC William S. Hurst Office of Engineering and Technology Federal.
Receive Antenna Performance Comparison. Receive Antenna Monitoring The receive antenna was installed in its permanent location inside the chamber A spectrum.
Page 1 EMC Products from Agilent Technologies EMI Precompliance Measurement Systems Precompliance Spectrum Analyzers EMI Measurement Accessories EMI Measurement.
1 Chelmsford Amateur Radio Society Intermediate Licence Course Carl Thomson G3PEM Slide Set 9 Antennas & Feeders Chelmsford Amateur Radio Society Intermediate.
San Juan Islands Submarine Cable Inspection Plan November 30, 2015.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
Antenna Basics.
DESIGN PARAMETRES AT BASE STATION Prittu Ann Thomas Roll no :14.
Piero Belforte, CSELT 1999: AEI_EMC_, EMC basics by Flavio Maggioni.
NSG 4070 Signal generator and immunity test system Dr. Heinrich
Entrance to EMI.
RF components Design for the Internet Over TV Band Adaptor
ANTENNA MEASUREMENTS Measurement of Radiation Pattern Gain
Accredited Standards Committee C63® - EMC
Designing a Circularly Polarized Antenna for EagleSat
60 GHz Cubicle Wall Reflectivity
CReSIS Electromagnetic Anechoic Chamber at the University of Kansas
EEE161 Lab Plan As of 11/13/2017.
EEE161 Lab Plan As of 11/13/2017.
Accredited Standards Committee C63® - EMC
Microwave Engineering
Open Rack Specification 2.1 Update
The Best Value in Electronic Test & Measurement
Multimedia Training Kit
Paper review Yun-tae Park Antennas & RF Devices Lab.
Presentation transcript:

Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to List a Test Site

Listing an Open Field Site William H. Graff oPresident and Director of Engineering o Major Chen oManager East Asia Branch Office o

What is an OATS? An Open Area Test Site is the minimum requirement, other than measurement instrumentation, for making radiated emissions measurements

Reference standard The FCC uses ANSI C for determining the suitability of an OATS. Standard open air test sites are considered in section of this document Semi-anechoic chambers are considered “alternative test sites” and are seen in 5.4.2

Basic description Open, flat and level Clear of overhead power lines Clear of RF reflecting structures Covered with hardware cloth or other conductive material Minimum dimensions for common 3M OATS is 6M x 5.2M

Basic Facility Must have a remotely controlled antenna positioner and mast capable of being raised to 4M ad lowered to 1M Must have a continuously rotateable remotely controlled turntable metal covered and flush with the groundplane.

Antennas Must have antennas capable of measurements over at a minimum 30MHz to 1GHz. If transmitters are to be tested, then the laboratory must be mindful that a frequency range typically to the 10 th harmonic of the fundamental measured is required. o433MHz key fob needs measurements to 4.3GHz

Site Attenuation Measurements Basic procedures given in and of ANSI C63.4 Measurements must be done on both horizontal and vertical planes Complex procedures for “alternative sites” include “test volume” measurements. Data must match the theoretical “site attenuation” curve to +/- 4dB

Powerline Conducted Measurements Use of a Line Impedance Stabilization Network (LISN) is required. If used with an OATS, the LISN must be under the groundplane.

Listed Site Test Report Considerations All test equipment and antennas must be calibrated. All antenna factor tables and LISN loss factors must be presented. All cables used in tests must be calibrated. All photographs shall be clear, in large format, and only one to a page

Submission to FCC The site attenuation data along site photographs must be submitted electronically to the FCC

Patience It is not unusual for the FCC to take a month or more to finish analyzing the Test Site data. Expect questions on a new facility when information appears unclear to the examiner. Be sure to respond quickly to the examiner’s questions. Do not test anything until approval is received.

Questions?