State of New Hampshire Site Evaluation Committee PO Box 95 29 Hazen Drive Concord, New Hampshire 03302-0095 Telephone (603) 271-3503.

Slides:



Advertisements
Similar presentations
All citizens of the state benefit from a balanced supply of housing which is affordable to persons and families of low and moderate income. Establishment.
Advertisements

Mission: Mission: To protect human health and the environment Primary services: Expertise DEC brings to the ACMP Primary services: Expertise DEC brings.
CAERNARVON TOWNSHIP LANCASTER COUNTY June 17, 2013.
THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
Siting Decisions Involving Renewable Energy Sources May 16, 2013 Paul Roberti, Commissioner Rhode Island Public Utilities Commission.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Steve Irwin Public Outreach Coordinator. What is the Board’s role? Before any company can build a major utility facility, OPSB assures that it benefits.
Act 38,§5, Nutrient & Odor Management Programs Subchapter G. Facility Odor Management Regulations Discussion.
Town of Lyndon Zoning Bylaw Changes Town Planning Commission Public Informational Meeting 09December09.
Code Comparison Changes 2012 IBC to 2012 NPFA 101 Developed for the Florida Department of Business And Professional Regulation Building Codes and Standards.
DRIs After 360. Transportation Methodology § (7) PREAPPLICATION PROCEDURES.— The levels of service required in the transportation methodology shall.
LOCAL REGULATION AND CLIMATE CHANGE QUICK TELECONFERENCE American Bar Association Section of Environment, Energy, and Resources Climate Change, Sustainable.
INDIAN LAND WORKING GROUP 17TH ANNUAL INDIAN LAND CONSOLIDATION SYMPOSIUM October 30- November 1, 2007 Oneida Reservation, Wisconsin Radisson.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
Western States Energy & Environment Symposium October 27, 2009.
OVERVIEW OF THE MINNESOTA PUBLIC UTILITIES COMMISSION Presentation to the Itasca Economic Development Corp. February 14, 2007 By LeRoy Koppendrayer, Chair.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Federal Energy and Environmental Regulation Agencies and Laws
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
Environmental Impact Assessment (EIA): Overview
Second Conference on Legal Challenges and Opportunities of Mexico’s Increased Global Interaction American Bar Association Los Cabos, Mexico, November 2013.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Roles and Responsibilities in Municipal Land Use.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Federal Energy Management Program Key Provisions of Current Legislation Renewable Working Group September 10, 2002 Nancy Carlisle NREL.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Ken Ortego – Vilar and Elliott.
2010 Florida Building Code: I nterpretation P rocess O verview.
Sec. 5 RE-REGULATION- EPAct 1992 FERC Orders 888 and 889 (1996) EPAct 2005 In short these three laws move the power industry towards an increase in competition.
Distinguishing: Clean Air Act, EPA Rules, Regulations and Guidance David Cole U.S. EPA, OAQPS Research Triangle Park, NC.
WIND ENERGY SITING REFORM LEGISLATION Kenneth Kimmell, General Counsel, Executive Office of Energy and Environmental Affairs.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Part 190 NPRM: Administrative Procedures - 1 -
Riverside County Transportation & Land Management Agency Juan C. Perez Director Riverside County Renewable Energy Grant Update August 3, 2015.
Local Powers for Land Use Regulation. Local Land Use Powers Land use regulation is considered a residual power –In most circumstances, that is… –Power.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
MPSC Licensing Issues Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
Lynne Welsh Massachusetts Department of Environmental Protection.
Livable Delaware Energy Task Force - the Key to Energy and Environmental Co-Benefits.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
MUNICIPAL SERVICE REVIEWS. Spheres of Influence and Municipal Service Reviews Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000 Cortese-Knox-Hertzberg.
Decommissioning Rules & Funds for Renewable Energy Facilities RenewElec Workshop October 21, 2010 Jonathan Voegele Research Associate Institute for Energy.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
INTERNATIONAL ELECTROTECHNICAL COMMISSION IECRE Conformity Assessment System Kerry McManama Executive Secretary IECEE, IECRE.
Generation Subcommittee, Day Two Arne Olson Energy & Environmental Economics, Inc. (E3) Presented to: Subcommittee on Generation Resources Boise, Idaho.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Regional Planning CCRPC Board Training March 21, 2012.
Health and Community Working Group November 20, 2014.
S.B Municipality Fees. S.B – Environment Budget Reconciliation Bill Enacted during the 2011 regular legislative session and becomes effective.
Municipal Water Rights…… Water Law & Policy Seminars March 12, 2012 Kent L. Jones, P.E. State Engineer.
INTERNATIONAL AND TRANSBOUNDARY ENVIRONMENTAL ASSESSMENT LAW OCTOBER 29, 2012.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
Policy Committee Report Virginia Recycling Association Annual Members Meeting Charlottesville, Virginia November 8, VRA Policy Committee Report1.
Overhaul of Combustion Turbines Under NSR Regulations
Two Energy Facility Permitting Reforms: New Hampshire’s Site Evaluation Committee, and the Federal FAST-41 Tom Burack, Esq., Sheehan Phinney New England.
Michigan Dept. of Environmental Quality Water Resources Division
SEQRA as a Tool to Review Energy Projects
SUSTAINABLE ENERGY CONFERENCE April 14 – 15, 2009
WIND ENERGY SITING REFORM LEGISLATION
Solar Energy Commercialization Utility Scale Business:
Charter School Legislation HB 1390 and SB 737.
Presentation transcript:

State of New Hampshire Site Evaluation Committee PO Box Hazen Drive Concord, New Hampshire Telephone (603) Fax (603) Energy Facility Evaluation in New Hampshire Presented at SEC/Wind Farm Presentation The Barn at the Rocks Estate Bethlehem, New Hampshire Presented by: Timothy W. Drew NH Department of Environmental Services August 25, 2010 Thomas S. Burack, Esq. Chairman Thomas Getz, Esq. Vice-Chairman

Title XII Public Safety and Welfare Chapter 162-H “Energy Facility Evaluation, Siting, Construction and Operation” SEC Administrative Rules

The SEC Web Site

Brief History  1974 – Aristotle Onassis proposed an oil refinery in coastal NH  Legislature enacted siting laws to address issues and impacts from such proposals –Hydro-Quebec Transmission System (mid-1980s) –Seabrook nuclear power plant (late-1970s)  1989 – Legislative committee to study siting laws, RSA 162-F (bulk power facilities) and 162-H (energy facilities)

Brief History (cont’d)  Problems included lack of threshold for SEC jurisdiction, opportunities for meaningful public involvement, lack of defined timeline for decision making, unpredictable processing procedure.  August 30, 1990 – Report of the Energy Facility Siting, Licensing & Operation Study Committee of the NH General Court  After 1991, RSA 162-F (nuclear facility decommissioning fund only) and RSA 162-H (bulk power and energy facilities)

Declaration of Purpose (RSA 162-H:1) I. (Excerpt) The legislature recognizes that the selection of sites for energy facilities will have a significant impact upon the welfare of the population, the economic growth of the state and the environment of the state.

Declaration of Purpose (cont’d) The legislature, accordingly, finds that the public interest requires that it is essential to maintain a balance between the environment and the possible need for new energy facilities in New Hampshire; that undue delay in construction of any needed facilities be avoided; and that the state ensure that the construction and operation of energy facilities is treated as a significant aspect of land- use planning in which all environmental, economic and technical issues are resolved in an integrated fashion.

Definitions (RSA 162-H:2, II)  “Bulk power supply facilities”  Removed - Chapter 65, Laws of 2009 –Electric generating station equipment and associated facilities designed for, or capable of, operation at any capacity of 30 megawatts or more… –An electric transmission line of design rating of 100 kilovolts or more … associated with a generating facility over a route not already occupied by a transmission line or lines. –An electric transmission line of a design rating in excess of 100 kilovolts that is in excess of 10 miles in length, over a route not already occupied by a transmission line…

Nuclear-Fueled Bulk Power Facility

Fossil-Fueled Bulk Power Facilities

Electric Transmission Line / Sub-Station

 “Energy facility” –…Any industrial structure … that may be used substantially to extract, produce, manufacture, transport or refine sources of energy, including ancillary facilities as may be used or useful in transporting, storing or otherwise providing for the raw materials or products of any such industrial structure. –Includes facilities that store on site a quantity [of fuel] to provide 7 days of continuous operation at a rate equivalent to the energy requirements of a 30 megawatt electric generating station and its associated facilities Definitions (RSA 162-H:2, VII)

Definitions (RSA 162-H:2, XII) – cont’d – eff: 7/17/07  XII. "Renewable energy facility'' means electric generating station equipment and associated facilities designed for, or capable of, operation at a nameplate capacity of greater than 30 megawatts but less than 120 megawatts…  Examples: wind energy, geothermal energy, hydrogen derived from biomass fuels or methane gas, ocean thermal, wave, current, or tidal energy, methane gas, biomass technologies, solar technologies, or hydroelectric energy

Definitions (RSA 162-H:2, XII) – cont’d – eff: 7/17/07  "Renewable energy facility'' shall also include electric generating station equipment and associated facilities of 30 megawatts or less nameplate capacity but at least 5 megawatts which the committee determines requires a certificate…  …consistent with the findings and purposes set forth in RSA 162-H:1, either on its own motion or by petition of the applicant or 2 or more petitioners as defined in RSA 162-H:2, XI

Natural Gas / Oil Pipeline

Fuel Storage Tank Farm

Certified Electric Competition [RSA 162-H:5, IV(b)]  After the date when competition has been certified to exist (1998), pursuant to RSA 38:36, in that portion of the state or in more than half of the state as a whole, all proposed electric generating facilities of capacity greater than 30 megawatts shall be considered energy facilities, and shall not be considered bulk power supply facilities.

Committee Membership (RSA 162-H:3) – now 15 Members  Environmental Services (3 members)  Public Utilities Commission (4 members)  Resources and Economic Development (3 members)  Health and Human Services (1 member)  Fish & Game Department (1 member)  Office of Energy & Planning (1 member)  Transportation (1 member)  Cultural Resources (1 member)

Counsel for the Public (RSA 162-H:9)  When application is filed with SEC, NH Department of Justice appoints an Assistant Attorney General as Counsel for the Public  The counsel shall represent the public in seeking to protect the quality of the environment and in seeking to assure an adequate supply of energy  Consolidate public issues for efficiency  Counsel provided at no charge to the public

Standard Application Process  Jurisdictional determination  Application preparation/submittal  Formal acceptance of application by SEC  Public informational meeting  State agency reviews  Adversarial hearings  Final state agency deliverables/findings  Decision  Appeals

Timeframes (Conventionals) (RSA 162-H:6 )  Application filed (30 days to review)  SEC decision to accept*/reject/exempt (within 60 days of filing)  *If accepted, START DATE FOR ALL SUCCEEDING STEPS  If rejected, 10 days to cure defects and resubmit  SEC public informational meeting within 30 days in county(ies)  State agencies report progress (draft permit conditions, data requests, etc.) within 5 months  Adversarial hearing(s) conducted by SEC  All State agency final decisions submitted to SEC within 8 months  SEC decision on “Energy facility” within 9 months  SEC decision on “Bulk power supply facilities” within 10 months –(PUC has 1 month for review of system capacity/stability/reliability)

Timeframes (Renewables) (RSA 162-H:6-a )  Application filed (30 days to review)  SEC decision to accept*/reject/exempt (within 30 days of filing)  *If accepted, START DATE FOR ALL SUCCEEDING STEPS  If rejected, 10 days to cure defects and resubmit  SEC public informational meeting within 30 days in county(ies)  State agencies report progress (draft permit conditions, data requests, etc.) within 3 months  Adversarial hearing(s) conducted by SEC  All State agency final decisions submitted to SEC within 6 months  SEC decision on “Energy facility” within 8 months

Petition the SEC (“opt in”) (RSA 162-H:2, XI and RSA 541-A:32)  X-a. "Petition" means a request to the committee to rule on the applicability of this chapter to a particular proposed bulk power supply facility or energy facility. XI. "Petitioner" means a person filing a petition meeting any of the following conditions: (a) A petition endorsed by 100 or more registered voters in the host community or host communities. (b) A petition endorsed by 100 or more registered voters from abutting communities. (c) A petition endorsed by the board of selectmen of the host community or 2 or more boards of selectmen of abutting communities. (d) A petition filed by the potential applicant.

Exemption from SEC Process (“opt out”) (RSA 162-H:4, IV)  IV. In cases where the committee determines that other existing statutes provide adequate protection of the objectives of RSA 162-H:1, the committee may, within 60 days of filing of the application, exempt the applicant from the approval and certificate provisions of this chapter, provided that the following requirements are met: (a) Existing state statutes, state agency rules or municipal ordinances provide adequate protection of the objectives of RSA 162- H:1; (b) A review of the application reveals that consideration of the application by only selected agencies represented on the committee is required and that the objectives of RSA 162-H:1 can be met by those agencies without exercising the provisions of RSA 162-H; (c) Response to the application from the general public indicates that the objectives of RSA 162-H:1 are met through the individual review processes of the participating agencies; and (d) All environmental impacts or effects are adequately regulated by other federal, state or local statutes, rules or ordinances.

Decision & Findings (RSA 162-H:16)  To issue a Certificate of Site and Facility, the SEC must find that:  The applicant has adequate financial, technical, and managerial capability for the project  The project will not unduly interfere with the orderly development of the region  The project will not have an unreasonable adverse effect on aesthetics, historic sites, air and water quality, the natural environment, and public health and safety  Its operation will be consistent with State energy policy (RSA 378:37)

Certificate of Site and Facility (RSA 162-H:16)  If project is approved, SEC issues a Certificate of Site and Facility with findings, terms, conditions (public input), and appendices (Federal, State and local government deliverables)  If denied, applicant has right to “cure the defects” and re-file. SEC process continues…  An SEC decision is reviewable only by the NH Supreme Court, pursuant to the RSA Chapter 541 “unlawful, unjust or unreasonable” standard

New Hampshire Energy Plan 2002 Edition  Section : “…the state needs to address how to approach projects that are not within the SEC’s jurisdiction, including smaller projects, renewable generation, co-generation, and distributed generation.” (pp. 4-9 & 4-10, State Energy Plan, 2002)  SEC issued in 2007 Certificate for 24-megawatt (12 turbine) wind power facility in Lempster, NH.  “A First” - Filed by petition of taxpayers and host board of selectmen, and less than 30 megawatts of capacity (“Opt-in”).

State Energy Policy Commission Established  HB 1146, which later became Chapter 257, Laws of 2006, established a commission to study fuel diversity and reliability, renewable portfolio standards, protection of the environment, the promotion of renewable energy (e.g., wind power), and energy efficiency in New Hampshire.

State Energy Policy Commission Established  Some of the findings from the work of this commission are reflected in the changes to RSA 162-H:2 and 6-a (discussed earlier)

Legislation – Chapter 65, Laws of 2009  “An act relative to energy facility siting, construction, and operation.”  009/HB0055.html  Removes bulk power facilities  Adds Cultural Resources as SEC member  Request for Exemption – Public informational hearing in affected county(ies)

Coastal Wind Power Energy Facility

Coastal Tidal Power Energy Facility Conceptual Tidal Power Facility

Summary  RSA 162-H was enacted and modified over the last three decades to provide a comprehensive, integrated, and timely evaluation of major energy projects to ensure that the health and welfare, economy, energy supply, and environment of New Hampshire citizens are protected and preserved.