January 30, 2014 Kurt Parkan, External Affairs Manager Industry Outlook Forum Kenai Peninsula Economic Development District.

Slides:



Advertisements
Similar presentations
OFNEDA 2013 Annual Conference Presented by: Jennifer David
Advertisements

1 Mining Information Session State of Alaska and U.S. Environmental Protection Agency Alaska Forum on the Environment Anchorage, Alaska February 12, 2008.
Alaska Department of Natural Resources, DML&W Water Resources Section Putting It All Together Alaska Coastal Management Program Annual Conference April.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
BLM Bureau of Land Management Oil and Gas Permitting Process Expediting Oil and Gas Development in Western States Kent Hoffman.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
HYCROFT RESOURCES & DEVELOPMENT INC. Allied Nevada Gold Corp.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Reclamation Plan Project Purpose: To Satisfy Syar’s Reclamation Obligation under SMARA for the Healdsburg Terraces (Basalt, Phase I, Phase II and No Name.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
Wireless Password: The Pebble Prospect Economic Impact and Regulatory Overreach Conference of Western Attorneys General Colorado Springs,
CANADA MORTGAGE AND HOUSING CORPORATION1. Municipal Infrastructure Lending Program Housing-Related Infrastructure HELPING MUNICIPALITIES BUILD STRONGER.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Lake Columbia Water Supply Reservoir Project TWCA March 4, 2010.
Bureau of Land Management Solid Minerals Programs June 12, 2013.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Doyon, Limited Presentation to the House Resources Committee February 18, 2011 Juneau Alaska.
Quyumta Community Sustainability Report Meeting Nelson Island.
The Alliance Natural Gas Pipeline Briefing April 27, 2001 William G. Britt, Jr. State Pipeline Coordinator Department of Natural Resources.
Savannah Harbor Expansion Project
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
BLM 2008 NFMC EPA of Section 365 Permit Streamlining Pilot Update James Gazewood BLM Wyoming State Office.
Kensington Mine Tailings Impoundment Litigation
What does an Environmental Professional Do?
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Mine Map Archiving in Utah. IMCC/MSHA Benchmarking Workshop Louisville, Kentucky October 15-16, 2003 Wayne Western, Reclamation Specialist Utah Division.
Reclamation Bureau Interagency Forum Local Agency Planning Process City of Rancho Cordova December 6, 2007.
“MAINTAINING ENVIRONMENTAL INTEGRITY IN MINING ” Tashana Redmond Senior Environmental Officer.
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
BSWI RMP SCOPING Resource Advisory Council Briefing BSWI RMP SCOPING Resource Advisory Council Briefing Bureau of Land Management October 28,
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
Cooper Lake Hydroelectric Project and Transmission Line Relicensing Update May 7, 2003.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
VI. Developing a VSMP Program General Stormwater Training Workshop.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
US Army Corps of Engineers BUILDING STRONG ® Mitigation and Conservation Bank Approval in Northern California Kate Dadey Chief, CA Delta Branch Sacramento.
Commissioner Tony Sertich April 17, SME – Minnesota Section Conference MINING IN MINNESOTA.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
Pebble Project Socioeconomic Baseline Prepared for: Baseline Environmental Team Agency Meetings Prepared by: McDowell Group, Inc. November 17-19, 2008.
Montana Resources Conceptual Plans for Permitting Continued Mining September 15, 2015.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Tribal Voices a tale of 3 mines GSA National Conference November 2015 Kendra Zamzow, PhD, CSP2 Ann Maest, PhD, Buka Environmental.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
Overview of Legal Issues in Marcellus Shale Development Penn State Ag Council Membership Meeting October 12, 2009 Agricultural Law Resource and Reference.
United States Department of Interior Bureau of Land Management Winnemucca District Draft Resource Management Plan and Draft Environmental Impact Statement.
An Introduction to Health Impact Assessment Paul J. Anderson, MD, MPH HIA Program Manager Section of Epidemiology Division of Public Health Department.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
Available at: hwy53relocation/sco ping.html hwy53relocation/sco ping.html.
Purpose of the Project  Construct surface access (industrial) to the Ambler Mining District  Support exploration and development of mineral resources.
Bureau of Land Management Federal Coal Leasing Program Programmatic Environmental Impact Statement Scoping Meeting Supporting Text.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
STATE OF ALASKA PERMITTING PROCESS
Uranium in Colorado: Past, Present, and Potential Future
National Environmental Policy Act of 1969 (NEPA)
Building Across Boundaries: Developing Energy Projects On Or Near Tribal Lands And Resources Laura Abram Director, Government & Public Affairs First Solar.
Presentation transcript:

January 30, 2014 Kurt Parkan, External Affairs Manager Industry Outlook Forum Kenai Peninsula Economic Development District

Donlin Gold Project Donlin Gold LLC is the operating company –50/50 partnership with Barrick Gold and NOVAGOLD Land owned by Calista Corp. and The Kuskokwim Corp. (TKC ) –Land selected for mineral development –Exploration and mining lease with Calista –Surface use agreement with TKC Anchorage, Bethel and Aniak offices –37 employees Project studies ongoing since 1995 –Resource definition –Engineering studies –Environmental baseline data collection

Mine Overview Reserves: 33.9 M oz of gold Mine Life: ~27+ years Production: ~ 1.1 M oz/year Mining: Open-pit up to 485,000 tons/day Milling: 59,000 tons/day Strip ratio: ~5.5:1 = ~3B tons waste rock Tailings: Fully lined conventional storage facility Infrastructure: 5,000 ft runway, 30 mile road, two port facilities, camp for 600 employees Logistics:Supplies barged up Kuskokwim River Power:150 MW on site generation using gas

Site Layout Overburden Stockpile Lewis Pit Waste Rock Facility Upper Contact Water Pond Area Ore Stockpile Platform Lower Contact Water Pond Overburden Stockpile Short-term Ore Stockpile Platform ACMA Pit with Backfill Snow Gulch Fresh Water Pond Tailings Storage Facility

Conceptual final reclamation 5

Logistics and Supply Chain 6

NEPA Timeline ~4 year process Public Scoping Ended 03/29/13 Draft EIS Final EIS/Permit Issuance Draft EIS Public Comment Period Notice of Intent Submitted 12/14/ Record of Decision subject to 30-Day Appeal Period Permit Applications Submitted 08/12 Scoping summary document Development of alternatives Agency Review Prepare DEIS Summary/Responses Agency Review of Comment Prepare Preliminary FEIS Agency Review Prepare FEIS Current Status 7 Lead Agency: US Army Corps of Engineers donlingoldeis.com

Permitting Nearly 100 permits needed Major federal permits –CWA Section 404/RHA Section 10 (USACE), Rights of Way (BLM), Pipeline Special Permit (PHMSA), PSD Air Quality review (EPA), EFH Consultation (NMFS), ESA Section 7 Consultation (NMFS/USFWS) Major state permits –Reclamation Plan Approval and Bonding (ADNR), Integrated Waste Permit and Bonding (ADEC), Wastewater APDES - Pit Dewatering (ADEC), PSD Title 1 Air Quality Permit (ADEC), Title 16 Fish Habitat Permits (ADF&G), Water Rights (ADNR), Rights of Way (ADNR/DOT), Dam Safety Certification (ADNR)

Workforce Development Reputation for local hire Village and school visits Summer internships Jobs booklet and talent bank Scholarships 2013 Employer of the Year –National Association of State Workforce Agencies. 1,750,000 hours worked Loss Time Incident free

Economic Benefits $375 M annual construction payroll (3,000 jobs) $ 97 M annual payroll during operations (600-1,400 jobs) Royalties under 7(i) and 7(j) provisions of ANCSA State taxes Healthier economy

Mushing and Mining 11

Iditarod Iron Dog 12