NASTO ANNUAL MEETING JUNE 9-11, 2013 MEETING CUSTOMER EXPECTATIONS THROUGH PERFORMANCE MEASURES: VERMONT’S PERSPECTIVE Richard M. Tetreault, P.E. Director/Chief.

Slides:



Advertisements
Similar presentations
KEEP MOVING TO KEEP AHEAD MAY MnDOT Vision and Mission Vision: Transportation leader, committed to upholding public needs and collaboration with.
Advertisements

Tennessee Department of Transportation ITS Mobility and Operations Summit Performance Measures November 18 – 19, 2009.
A Data-Driven Method for Prioritizing Projects in Central Idaho Prepared for the 2012 ITE Western District Meeting Santa Barbara, California Prepared by.
| 1 The Municipal Farm Sustainable Reuse Plan Project funded through a Brownfields Area-Wide Planning Pilot Grant from the United States Environmental.
Updating the Washington Transportation Plan February 4,
Public Workshop Welcome -to the -. What is the ?
Ministry of Transportation RISK MANAGEMENT FOR GEOMETRIC DESIGN AASHTO Sub-Committee Design July 2009 Gary Todd, P. Eng. Manager, Design & Contract Standards.
Complete & Connected: Tools for Planning a Balanced Transportation System Technical Workshop.
Infrastructure Planning and Funding MID-REGION COUNCIL OF GOVERNMENTS MID-REGION METROPOLITAN PLANNING ORGANIZATION MARCH 19, 2015 NAIOP-NEW MEXICO CHAPTER.
1 6-Year Transportation Improvement Program ( ) Kit Baker, Chair ( Citizen’s Transportation Advisory Committee ) Desiree’ Winkler, P.E. ( Transportation.
Division of Transit & Rail Advisory Committee (TRAC) Kick-Off Meeting January 11, 2013.
Vermont Agency of Transportation Performance Management Status FHWA Performance Management Workshop June 19, 2012 Warwick, RI Joe Segale, P.E./PTP Policy.
CALTRANS’ TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS CTP 2040 PAC 1 Kris Kuhl Assistant Division Chief, Division of Traffic Operations 4/15/2014 CREATING.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
 City of Mesa Council Presentation October 23, 2014.
Comprehensive Freight Movement Plan Pennsylvania Rail Freight Seminar May 22, 2013 Pennsylvania Long Range Transportation Plan Pennsylvania Long Range.
Office of Project Development Department of Highways Retreat June 12, 2008.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
2015 Interregional Transportation Strategic Plan Active Transportation and Livable Communities August 21, 2014 Scott Sauer.
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
Caltrans 5-Year Strategic Plan D-11 Planning Division Summary.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Planning Process & Alternatives Analysis Unit 7: Forecasting and Encouraging Ridership.
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
1 Ministry of Transport, Public Works and Water Management.
Patrick Weidemann Ryan Wilson, P.E., AICP Minnesota Department of Transportation MnDOT – ACEC/MN Annual Conference March 5, 2013.
FY 2012 President’s Budget Released February 14, 2011.
Transportation Planning Board: Background, Constrained Long- Range Plan, and Ongoing Work Presentation to the Board of Directors Metropolitan Washington.
Ohio Transportation Planning Conference July 16, 2014.
PennDOT Next Generation: The Modernization of PennDOT’s Internal and External Operations Nolan R. Ritchie, Innovations Officer Transportation Innovations.
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Hearing the Silence : Putting Maintenance First (A semiosis)
Designing the Future of NMDOT NM Section ITE September 3, 2015 Tamara P. Haas, P.E. Asset Management & Planning Division Director
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
 Scotland’s National Transport Strategy A Consultation.
PERFORMANCE MEASURES FOR HIGHWAY CAPACITY DECISION MAKING WEST VIRGINIA PLANNING CONFERENCE – SEPTEMBER 16, 2015 SALEEM SALAMEH, P.E., PH.D. KYOVA IPC.
The Road to New Hampshire's Future. Transportation Funding Overview/summary Operational deficit Preservation and Maintenance Capital needs.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Iowa in Motion  Iowa’s Plan Process  Phased Approach Part  -current conditions -issues -elements.
Ohio Department of Transportation Steering Committee Meeting #3 Steering Committee Meeting #1May 30, 2012 Steering Committee Meeting #1 WELCOME Steering.
Leading in Lean Times How Do We Leverage Research to Make the Best Use of Limited Resources?
USACE Asset Management Risk and Reliability Workshop Condition Index Definitions Primer Allen C. Estes United States Military Academy.
June 23, 2006 Asset Management A Tool to Save Lives, Time, and $$$
1 Planning Andrea Stevenson. 2 What’s the Big Deal About Ohio’s Transportation System? Ohio is within a single day’s drive (600 miles) of 60% of the United.
Ohio Transportation Planning Conference July 16, 2014.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Office of Major Project Development (OMPD) Overview November 2015.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
UW - Madison Federal Highway Administration (FHWA) David L. Kopacz, P.E. Wisconsin Division Office February 20, 2015.
Item 4G Annual Purchase Agreement for Signs and Pavement Markings.
AASHTO – SCOPM Palm Desert, California October 23, 2009 Mn/DOT Performance Management - Setting our Direction.
Freight Forum RTC Washoe March 31 st, The reliable, cost effective, and safe movement of goods and products across the State of Nevada and.
Next Steps.  To begin Planning Council discussion about the MPO’s Next Steps. Now that the 2035 Regional Transportation Plan has been updated and adopted,
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Planning Commission Ian Macek May 26, 2016 Freight Master Plan.
Road Investment Decision Framework
1.  Transportation Vision  Near-term Recommendations  Ongoing Work / Next Steps 2.
 SCDOT has over 41,000 miles of pavements and over 8,400 bridges.  4 th largest state maintained system in the country.  Started working on the TAMP.
A Position Statement 14th October 2016
Stormwater Management Tools
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
Commonwealth Transportation Board
District 7 Deputy Director, Randy Chevalley, P.E., P.S.
Strategic Highway Investment Formula for Tomorrow
MODULE 11: Creating a TSMO Program Plan
VT Transportation Project Selection and Project Prioritization
Presentation transcript:

NASTO ANNUAL MEETING JUNE 9-11, 2013 MEETING CUSTOMER EXPECTATIONS THROUGH PERFORMANCE MEASURES: VERMONT’S PERSPECTIVE Richard M. Tetreault, P.E. Director/Chief Engineer Vermont Agency of Transportation

2 …Ken Miller’s “law of budgeting”: The less our value is understood, the more our funding is scrutinized” page 87 Copyright © 2006 by Governing Books, a division of Governing Magazine

VTRANS VISION AND GOALS 3 GOALS SAFETY: Make safety a critical component in the development, implementation, operation and maintenance of the transportation system. EXCELLENCE & INNOVATION: Cultivate and continually pursue excellence and innovation in planning, project development, and customer service. PLANNING: Optimize the movement of people and goods through corridor management, environmental stewardship, balanced modal alternatives, and sustainable financing. PRESERVATION: Protect the state’s investment in its transportation system. ENVIRONMENTAL STEWARDSHIP: Build, operate and manage transportation assets in an environmentally responsible manner. The Vermont Agency of Transportation (VTrans) has a vision of a safe, efficient and fully integrated transportation system that promotes mobility, Vermont’s quality of life, and economic strength. VTrans’ mission is to provide for the movement of people and commerce in a safe, reliable, cost-effective and environmentally responsible manner.

PERFORMANCE MEASUREMENT 4 VTrans has been systematically developing performance measures since They have become a crucial part in managing the assets and services entrusted to the Agency. Performance measures indicate the effectiveness of the Agency in accomplishing its mission and indicate where shifts in funding are needed. The public expects VTrans to manage transportation assets and services in the most cost-effective manner. Performance measures show Vermonters that VTrans is exercising good stewardship over the assets/services it manages, and is spending tax-payers’ money wisely.

PROJECT PRIORITIZATION 5 The demand for transportation improvements far exceeds the funds available. Good stewardship mandates that VTrans use limited dollars to preserve and improve Vermont’s transportation assets in the most efficient manner. The Agency applies asset management principles to take a long-term view of the overall transportation network, and choose activities that minimize long-term costs. The Agency developed a quantitative project prioritization method that assigns a numeric score to competing projects. Under that strategy, greater emphasis is placed on preserving bridges, pavement, culverts and other assets. Priority scores guide VTrans and other stakeholders as to which projects to postpone and which ones to accelerate.

Roadway: 6  Highway System (40 points)  Cost per vehicle mile (20 points)  Regional Priority (20 points)  Project Momentum (20 points)  Designated Downtown Project o VTrans awards ten bonus points to the base score for projects within a designated downtown development district established pursuant to 24 V.S.A. § 2793 Prioritization factors The rating system is required to include asset management-based factors which are objective and quantifiable including: Safety Traffic volume Availability of alternate routes Future maintenance and reconstruction costs Priorities assigned by the RPC or the MPO

7 Paving:  Pavement Condition Index (20 points)  Benefit/Cost (60 points)  Regional Priority (20 points) Bridge:  Bridge Condition (30 points)  Remaining Life (10 points)  Functionality (5 points)  Load Capacity and Use (15 points)  Waterway Adequacy and Scour Susceptibility (10 points)  Project Momentum (5 points)  Regional Input and Priority (15 points)  Asset – Benefit Cost Factor (10 points) Prioritization factors, cont.

ANNUAL REPORTS 8

LEGISLATIVE “GREEN SHEET” 9

I NDICATOR : P UBLIC T RANSIT R IDERSHIP 10 20% increase in public transportation ridership between 2008 and 2012.

I NDICATOR : R AIL R IDERSHIP 11 18% increase in rail ridership between 2008 and 2012.

I NDICATOR : S AFETY 12 A multi-agency and partner approach (Vermont Safety Alliance) has resulted in decreased fatalities. VTrans established the Alliance to formalize the multi-agency approach.

TRI-STATE MEASURES 13

MAP-21 RULE MAKING The beat goes on…. 14