PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Construction Contracting
Roles & Responsibilities in Construction Management
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Contract CloseOut.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
NEC - Engineering and Construction Contract (ECC)
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Conditions of the Contract for Construction
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Engineering 221 Drawings and Specifications.
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Dr. Hany Abd Elshakour 9/7/ :22 PM1. Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle.
Construction Contracts What You Need to Know March 19, 2015.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
 Journeyman  Management  Specialization  Teaching  Owning a business.
Date: 16 April 2010 Adapting FIDIC Standard Forms for Local Conditions and Regulations TCDPAP Annual Conference - '‘New Approaches and Solutions for Consultancy.
Construction Contracts and Project Delivery Methods
Compensation events and claims Presented by Prof. Khem Dallakoti.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Specification & Quantities Estimating
Topic1b: Project Life Cycle
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Chapter 2 Introduction to Construction Procedures
CONSTRUCTION CONTRACTS DOCUEMENTS
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Process of Planning, Designing and Financing a Hospital
CHAPTER 1 MANAGEMENT IN THE ENGINEERING AND CONSTRUCTION INDUSTRY CONSTRUCTION'S FUTURE:  Increasing size of projects & Organizations  Increasing technological.
Construction Eng 221 Project Management and Administration.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
© Cengage Learning – Purchasing & Supply Chain Management 4 ed ( ) Analysis 3. The purchasing process: the buyer’s role.
PROJECT MANAGEMENT 2 Chu Eu Ho
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architecture during Construction ‘observation administration’
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Construction Contracts
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

PROJECT MANAGEMENT 2 Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology

WHAT IS A PROJECT ? Organization of resources into activities Implementation of the activities in a logical sequence WHAT ARE RESOURCES ? Materials Equipment Technology People Time Money

NATURE OF THE CONSTRUCTION INDUSTRY Like Manufacturing industry – Involves the production of a physical product Like Service industry – Does not accumulate large amount of capital – Many small businesses Success or failure is highly dependent on the qualities of the people rather than Technologies protected by patent or Availability of capital facilities

CONSTRUCTION INDUSTRY IS HIGHLY CUSTOM ORIENTED Desire for Uniqueness of Product (not Mass Production) Organization structure is highly specialized and layered Complex interlocking of interests and traditions - Architecture

CONSTRUCTION INDUSTRY IS HIGHLY INCENTIVE ORIENTED Advances tend to develop from innovations or better ideas Cannot be protected by laws of secrecy or patents Ideas disseminate quickly Benefit Competitors Lack incentive for investment for R&D

INTEREST GROUPS Owner wants to achieve best value for their investment Contractors desire to bid low enough to win but high enough to realize profit on investment Workers hope to achieve better living standards and working conditions

INTEREST GROUPS Owner wants to achieve best value for their investment Contractors desire to bid low enough to win but high enough to realize profit on investment Workers hope to achieve better living standards and working conditions Architect and Engineers are not directly associated with the above groups Professional achievement more attractive

LIFE CYCLE OF A PROJECT Seven Phases Concept and Feasibility Studies Preliminary Engineering and Design Detailed Engineering and Design Procurement Construction Start-up and Implementation Operation or Utilization

1. Concept and Feasibility Studies Forecast Future Demand Location Availability of Resources Accessibility to transportation Political and Institutional Factors Sociological and Economic Impact on Community Environmental Impact Overall Technical and Economic Feasibility

2. Preliminary Engineering and Design Architectural concepts Evaluation of technological process alternatives Size and capacity of facility Comparative economic studies Reviews by regulatory bodies for compliance Zoning regulations Building codes Licensing procedures Safety standards Environmental impact Public Hearing Funding cycles in Legislative and Executive Bodies

3. Detailed Engineering and Design Design of Architectural Elements Design of Structural Elements Site Investigation Foundation Design Electrical and Mechanical Design Preparation of Specifications and Drawings Preparation of Contract Documents

3. Detailed Engineering and Design Design of Architectural Elements Design of Structural Elements Site Investigation Foundation Design Electrical and Mechanical Design Preparation of Specifications and Drawings Preparation of Contract Documents Field Construction Methods Cost Knowledge

4. Procurement Services Equipment Materials

Services Equipment Materials Lump Sum Contract Cost Plus Fee Contract Negotiated Contract 4. Procurement

5. Construction Process whereby the Designers Plans and Specifications are converted into Physical Structures and Facilities Co-ordination of all resources to complete the project On Schedule Within Budget According to Specified Standard of Quality and Performance

6. Start-up and Implementation Testing of Components Warranty Period

7. Operation and Utilization Regular Maintenance of Facilities

DESIGN TEAM Architect Interior Designer Landscape Architect Civil Engineer Environmental Engineer Electrical Engineer Mechanical Engineer Chemical Engineer Geologist Environmental Scientist Economist

CONSTRUCTION TEAM General Contractor Land Surveyor Formwork Carpenters Steel Fabricators Concreters Bricklayers Plant and Equipment Operators Specialist subcontractors Suppliers

Construction Contracts American Institute of Architects Documents A101 Standard Form of Agreement between Owner and Contractor – Stipulated Sum A111 Standard Form of Agreement between Owner and Contractor – Cost of the Work Plus a Fee A201 General Conditions of the Contract for Construction B141 Standard form of Agreement between Owner and Architect A132 Performance Bond and Payment Bond

Elements of a Construction Contract ARTICLES Contract Documents Architect Owner Contractor Subcontractors Work by Owner or by Separate Contractors Time of Completion and Extension of Time Progress and Final Payments Substantial Completion Insurance Changes in the Work Uncovering and Correction of Work Termination of Contract

INSURANCE Requirements under AIA A201Contract Documents Contractor s Liability Insurance Owner s Liability Insurance Property Insurance Loss of Use Insurance Workmen Compensation Disability Benefits

OWNERS RESPONSIBILITY Make Financial Arrangements to fulfill his obligations Furnish Accurate Contract Specifications and Drawings for the Contractor s work Right to Stop Work Right to Change Work Right to Terminate Contract if Contractor Defaults

Architect s Responsibility Architect is the Owner s Representative Architect is the Administrator of the Contract Visit site at appropriate stages of construction to familiarize himself generally with the progress and quality of the Work and to determine whether Work is proceeding in accordance with Contract Documents. Advice the Owner on Work Progress Guard the Owner against Defects and Deficiencies in the Work of the Contractor Reviews Contractor s Claims and Approves Amount to be paid to the Contractor Architect is not responsible for Methods of Construction or Site Safety

Contractor s Responsibility Review Contract documents for Errors and Inconsistencies Supervise and Co-ordinate all Construction Work Provide full time Superintendent on Site Responsible for Site Safety Indemnify the Owner against any Claims by third parties

Handling Disputes Contract is signed between Owner and Contractor Architect acts as Interpreter of the Contract between Owner and Contractor Architect acts as Judge of the Performance of the Owner and Contractor All disputes between Owner and Contractor shall be decided by Architect Architect shall not show Partiality Architect s Decision on Artistic Effects is Final Arbitration

Scoping Planning Organizing Controlling Basic Management Activities

SCOPING Establishing Realistic and Specific Objectives which states in advance the Desired Results PLANNING Programming Costing Scheduling

ORGANIZING Design of the Organization Structure Delegation of Responsibilities Working Relationships between Individuals and Groups System of Communication to keep everyone informed Provide Leadership Feedback Loop

CONTROLLING Awareness of Current Status of Cost, Schedule and Quality Performance compared to Project Goals Regular Inspection and Supervision Formulate Procedures to Identify Errors in time for Remedial Works to be made Manage Disputes

Know Your Scope of Works Understand Your Contractual Obligations Plan Activities in Detail Resolve Problems Quickly Manage Subcontractors Manage Cash Flow Project Management

To Be A Good Project Manager

KNOW YOUR STUFF & KEEP COOL To Be A Good Project Manager