Expected Quench Levels of the Machine without Beam: Starting at 7 TeV ? P. Pugnat CERN, Geneva, Switzerland LHC Project Workshop Chamonix XV, Tuesday 24.

Slides:



Advertisements
Similar presentations
Training the dipoles A.Werveij What did we learn without beam in 2008 ? Superconducting electrical circuits K-H.Meß The Sector 34 Incident Ph.Lebrun Calorimetric.
Advertisements

February 2009 Summary of Chamonix 09 Steve Myers.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.
Andrzej SIEMKO, CERN/AT-MTM Slide 1 14th “Chamonix Workshop”, January 2005 Beam loss induced quench levels A. Siemko and M. Calvi Machine Protection Issues.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
Quench-based magnet sorting at the MEB presented by L. Bottura Workshop on Beam generated heat deposition and quench levels for LHC magnets March 3 rd,
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Magnets: Cold Tests & Throughput V. Chohan SM 18 Operation CERN.
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Stripping Foil Test Stand in the Linac4 Transfer Line
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
AT/MTM, August 2004 Quench Test Results obtained with The Local Quench Antennas on selected magnets M. Calvi S. Kouzue A. Forrester E. Floch P. Pugnat.
T. LeCompte Argonne National Laboratory Evolution of the Run Plan.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
The integration of 420 m detectors into the LHC
E. Todesco MAGNET (RE)Training E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC risk review, 5 th March 2009 Acknowledgements:
E. Todesco CAN WE IMPROVE THE MAGNETIC CYCLE/MODEL AND THEIR EFFECTS? E. Todesco For the FiDeL team: C. Alabau Pons, L. Bottura, M. Buzio, L. Deniau, L.
E. Todesco ENERGY OF THE LHC AFTER LONG SHUTDOWN 1 ( ) C. Lorin, E. Todesco and M. Bajko CERN, Geneva Switzerland With relevant inputs from colleagues.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Procedures for detecting vacuum leaks in the LHC LTC open action from /36. LTC Frank Zimmermann, LHCCWG 23 October 2007.
Expected field quality in LHC magnets E. Todesco AT-MAS With contributions of S. Fartoukh, M. Giovannozzi, A. Lombardi, F. Schmidt (beam dynamics) N. Catalan-Lasheras,
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
E. Todesco QUENCH BEHAVIOUR TEAM ACTIVITIES E. Todesco for the QBT CERN, Geneva Switzerland CERN, 7 th January 2016 MSC Technical Meeting.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
E. Todesco RETRAINING AND DETRAINING IN THE LHC E. Todesco Magnets, Superconductors and Cryostats Group Technology Department, CERN LHC Machine Advisory.
Hervé Allain, R. van Weelderen (CERN)
Bending crystals for magnetic and electric dipole moment measurements
Tracking simulations of protons quench test
S. Roesler (on behalf of DGS-RP)
11T Magnet Test Plan Guram Chlachidze
Minimum Hardware Commissioning – Disclaimer
Setup beam intensities for FCC-hh
E. Todesco for the QBT CERN, Geneva Switzerland
ANALYSIS OF THE PRODUCTION DATA AFTER THERMAL CYCLE SECOND PART
Experience: past events and accidents
The LHC - Status Is COLD Is almost fully commissioned
STATISTICAL SUMMARY AND INTERPRETATION OF THE TRAINING CAMPAIGNS
LHC Dipole Diode Insulation Consolidation Review (I) INTRODUCTION
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
FCC hh dump kicker - switch topologies and impact on beam
Powering from short circuit tests up to nominal
QUENCH BEHAVIOUR TEAM ACTIVITIES
POSSIBLE SCENARIOS FOR TRAINING
Magnet Circuit performance at 6
MQYY: superconducting Quadrupole magnet for Hl-lhc
LHC OPERATION AND SUPPORT
LHC Beam Operations Past, Present and Future
MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.
LHC FMCM Project 1.
Machine Protection Issues affecting Beam Commissioning
Review of hardware commissioning
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

Expected Quench Levels of the Machine without Beam: Starting at 7 TeV ? P. Pugnat CERN, Geneva, Switzerland LHC Project Workshop Chamonix XV, Tuesday 24 January 2006

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 2/15 Introduction Abstract (revised) The quench training performance of about 900 LHC main dipoles and 200 main quadrupoles cold tested to date will be presented and commented. From these results an estimate of the number of quenches that could be required to operate the whole machine at nominal energy will be presented without considering beam loss effects. The energy level at which the machine could be operated without being disturbed by training quenches at the early phase of the commissioning will also be addressed. The missing and required information necessary to improve these predictions will be pointed out.

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 3/15 Outline Introduction Quench training performance of MBs –After the 1 st cool-down –After the 2 nd cool-down Extrapolation for the LHC operation –Estimate of the number of Training Quenches of MBs before reaching nominal energy –Estimate of the current level from which Training Quench will occur Case of MQs –Quench training performance –Estimate of the number of Training Quenches before reaching nominal energy –How to improve the reliability of the predictions ? Conclusion

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 4/15 Reminder of the “jargon” used Training Quenches, Detraining, Memory Effect,… Only Training Quenches will be considered; Quench due to cryogenic problem or wrong electrical connections are not considered but can also be present; importance of diagnoses,… No beam. 50 ms/div, 1 mV/div Example of mechanical activity 0.5 s before a quench

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 5/15 Histogram of the number of quenches to reach 8.33 T (11850 A) for the 1 st 908 LHC Main Dipoles cold tested Result on test benches:  38.1 % of MBs reached the nominal field during their 1 st powering without Training Quenches Rejected

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 6/15 Histogram for MBs of the number of quenches to reach 8.33 T (11850 A) after the 2 nd cool down & Direct Extrapolation Rejected TC performed on 115 MBs (  12.7 %); From a direct Extrapolation & the Hypotheses No detraining + MBs with TC will not quench, the number of quenches that can be expected: ( ) x ( x x 0.01)  300 i.e.  40 / octant But problem with the representativity of the sample that contains the weakest MBs, a sort of worst case scenario ?…

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 7/15 Reminder of the Algorithms used for the Cold Test Program From MARIC (streamline of the test program  2 Quench rule) From MARIC (correction the test program proposed by QWU  3 Quench rule)

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 8/15 Extrapolation for the LHC operation MBs Sample bias correction ? From {TC}, the reduction of the average number of quenches to reach ATC 8.33 T is reduced by 82 % ; assuming the same reduction for the sample {NoTC},  Average number of Training Quenches by octant to start at 8.33 T: ( ) x / 8  25 With Hypotheses: No nasty MBs, No Performance Drift for future MBs, No long time Relaxation of the trained magnets, No detraining ?  Estimation for detraining ATC: 0.04 x 3 x 25 < 5 additional Quenches / octant To start at 8.33T, in average a Total Quenches / octant Same approach to estimate the dispersion: 1   6 Training Quenches

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 9/15 Cumulative Statistics for MBs

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 10/15 Training Quench Probability versus B for MBs For field below 7.3 T, Prob {MB-Q}  1% If the field is reduced by 1 T from 8.33 T, Prob {MB-Q}  0.18  0.009

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 11/15 Histogram of the number of quenches to reach A for the 1 st 196 LHC Main Quadrupoles cold tested SSS277 Under investigation Result on test benches:  56.1 % of dipoles reached the nominal field gradient during their 1 st powering without Training Quenches

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 12/15 Case of MQs Poor Statistics for the Memory Effect: –9 SSS with a TC (4.6 %) –ATC, 3/9 quenched above nominal With the same method as for MBs & the same hypotheses: 0.17 x 360  60 Quenches i.e.  8/octant as a very rough estimate due to the lack of data,… As a low Memory Effect was observed on test benches  Some MQs will also exhibit Training Quenches in the tunnel. TCTC {NoTC} # {TC} # 9 # Quench to reach 223 T/m Reduction of 71 % With the same reduction

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 13/15 Conclusion 1/2 From a first estimate & extrapolations of present data, ± 6 Training Quenches/octant for MBs +  8/octant for MQs are expected before to reach the 7 TeV requirements. At the level Proba  few %, Training Quenches will start typically at current value in MBs  11 kA (6.5 TeV) and probably at a close level for MQs. To improve the estimations for MQs, the Memory Effect needs to be study and more statistics is required. When all main magnets will be cold tested, these numbers can be reassessed, octant by octant.

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 14/15 Conclusion 2/2 Expected quench Levels of the Machine without Beam: Starting at 7 TeV ? –It depends on the time available for Training Quenches but this objective should be maintained as much as possible,… –Strategy: Any “spare” time must be dedicated to the training of magnets, all octants in parallel; this is a part of the commissioning.  Dedicated analysis after each Training Quench to give the green light for the next powering; Need of a safe powering flag for each electrical circuit?  Same approach as cold tests on the benches: Postmortem Tools should be available and trained Experts for the analysis. –Training Quenches could arise from magnets other than MBs and MQs but also many other problems to look at before to train the LHC,…

23-27 January 2006Chamonix XV - Expected quench levels of the machine without beam: starting at 7 TeV ? P. Pugnat 15/15 Acknowledgments to The OP Team for providing the results, The EQ Support Team for providing the validation of results, N. Smirnov for providing the statistical results of SSSs, M. Pojer to regularly update statistical results of MBs, A. Siemko for fruitful discussions.