PBN Airspace Concept Workshop ReviewReview INTERNET: pin:

Slides:



Advertisements
Similar presentations
1 Summary of day 4 Performance Based Navigation The symposium fully supports the PBN concept. It acknowledges that it addresses the States current and.
Advertisements

Technical Co-operation Challenges Why ? Capabilities of existing Brazilian Institutions.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
Erwin Lassooij PBN Programme Manager 30 January 2014
Overview of the PBN Airspace Implementation Processes
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
PBN ICAO HQ Activities Overview
CHINA GO TEAM VISIT 2014 Erwin Lassooij/Joel Morin 30 June 2014.
Practice Class Exercise SE Asia Enroute 1. PBN Implementation Processes 2.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1. AIRSPACE CONCEPT WORKSHOP CASE STUDY Phuket / Krabi 2.
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session Erwin Lassooij ICAO PBN Programme Manager.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
GAGAN USER GROUP INTERACTION PROGRAM WITH HELICOPTER OPERATORS 10 th July 2014 Airports Authority of India New Delhi Airports Authority of India- FPD section1.
Continuous Climb Operations (CCO) Saulo Da Silva
The Way Forward for ICAO Nancy Graham Director, Air Navigation Bureau, ICAO Gdansk International Air & Space Law Conference – Poland in International Civil.
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
“Established on RNP” Jeff Williams – IATA
Practice Class Exercise CHINA Enroute 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Applying Innovation Dubai Airport Show 2015 – Innovation podium Tuesday 12 March 2015, Session 1, 10:15 – 10:45 Laurent Delétraz.
PBN Airspace Concept Process
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
ATM Implementation Support by ICAO APAC RSO
Introduction to PBN Seminar ICAO PBN Implementation 1.
Study Continuous Climb Operations
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
CANSO PBN Support Phil Rakena CANSO PBN SG co-Chair Regional PBN Champion [Airways New Zealand]
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
Overview of the PBN Airspace Implementation Processes
Aviation System Block Upgrades and NAV CANADA Planning
Workshop on preparations for ANConf/12 − ASBU methodology
Collaborative Decision Making (CDM) Saulo Da Silva
ATM Implementation Support by ICAO APAC RSO
Performance Based Navigation The Future
African Flight Procedure Programme Assistance (AFPP)
Erwin Lassooij PBN Programme Manager 30 January 2014
AERONAUTICAL RADIO OF THAILAND LTD.
AIRSPACE CONCEPT WORKSHOP CASE STUDY
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Presented by United Arab Emirates
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
Practice Class Exercise SE Asia Enroute
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
PBN Airspace Concept Workshop
Continuous Climb Operations (CCO) Saulo Da Silva
Erwin Lassooij/Joel Morin 30 June 2014
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Technical Co-operation Challenges
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Continuous Climb Operations ( CCO )
Mixed Up Multiplication Challenge
“Established on RNP” Jeff Williams – IATA

Presentation transcript:

PBN Airspace Concept Workshop ReviewReview INTERNET: pin:

Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan, Design, Validate, Implement ✈ 17 steps ✈ Integration of ICAO Doc 9931 & 9993: CDO and CCO ✈ ICAO Circ 330: Civil / Miitary Cooperation in ATM ✈ Designed routes and airspace in TMA ✈ “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 ✈ Routes designed for dual airports ✈ Phuket / Krabi ✈ Enroute design and multi-TMA integration practice ✈ Southeast Asia ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan, Design, Validate, Implement ✈ 17 steps ✈ Integration of ICAO Doc 9931 & 9993: CDO and CCO ✈ ICAO Circ 330: Civil / Miitary Cooperation in ATM ✈ Designed routes and airspace in TMA ✈ “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 ✈ Routes designed for dual airports ✈ Phuket / Krabi ✈ Enroute design and multi-TMA integration practice ✈ Southeast Asia

Questions Asked 3 REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5 PATH TERMINATOR CODING RULES

Questions Asked 4 REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5 PATH TERMINATOR CODING RULES

Discussion Points ✈ Build it and they will come ✈ Who benefits – keep current or change to new ✈ Mixed mode is a common occurrence today ✈ Ongoing and refresher training ✈ Future improvements ✈ Route spacing ✈ Curved simultaneous approaches to multiple rwys ✈ Implementation challenges ✈ Build it and they will come ✈ Who benefits – keep current or change to new ✈ Mixed mode is a common occurrence today ✈ Ongoing and refresher training ✈ Future improvements ✈ Route spacing ✈ Curved simultaneous approaches to multiple rwys ✈ Implementation challenges 5

Course Survey Form:

Contact Information ✈ Instructors: Instructors: ✈ ✈ ✈ ✈ Survey:

FINIFINI