PBN Airspace Concept Workshop ReviewReview INTERNET: pin:
Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan, Design, Validate, Implement ✈ 17 steps ✈ Integration of ICAO Doc 9931 & 9993: CDO and CCO ✈ ICAO Circ 330: Civil / Miitary Cooperation in ATM ✈ Designed routes and airspace in TMA ✈ “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 ✈ Routes designed for dual airports ✈ Phuket / Krabi ✈ Enroute design and multi-TMA integration practice ✈ Southeast Asia ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan, Design, Validate, Implement ✈ 17 steps ✈ Integration of ICAO Doc 9931 & 9993: CDO and CCO ✈ ICAO Circ 330: Civil / Miitary Cooperation in ATM ✈ Designed routes and airspace in TMA ✈ “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 ✈ Routes designed for dual airports ✈ Phuket / Krabi ✈ Enroute design and multi-TMA integration practice ✈ Southeast Asia
Questions Asked 3 REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5 PATH TERMINATOR CODING RULES
Questions Asked 4 REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5 PATH TERMINATOR CODING RULES
Discussion Points ✈ Build it and they will come ✈ Who benefits – keep current or change to new ✈ Mixed mode is a common occurrence today ✈ Ongoing and refresher training ✈ Future improvements ✈ Route spacing ✈ Curved simultaneous approaches to multiple rwys ✈ Implementation challenges ✈ Build it and they will come ✈ Who benefits – keep current or change to new ✈ Mixed mode is a common occurrence today ✈ Ongoing and refresher training ✈ Future improvements ✈ Route spacing ✈ Curved simultaneous approaches to multiple rwys ✈ Implementation challenges 5
Course Survey Form:
Contact Information ✈ Instructors: Instructors: ✈ ✈ ✈ ✈ Survey:
FINIFINI