Mercury Reduction Plan (MRP) Big Rapids Ordinance NO. 521-08-03 Chapter 53, Title 5, Section 53.021(B) Mercury Reduction Plans.

Slides:



Advertisements
Similar presentations
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Contractor Management. Struggling with Contractor Management ? ? ? Getting purchasing on board? Specifically stating environmental compliance in contracts?
Robert C. Byrd Health Sciences Center Safety Office.
Discussion Points State Owned Vehicle Policy Review Agency Vehicle Acquisition Process Checklist Request Form AGENCY VEHICLE MANAGEMENT PROCESS REVIEW.
Massachusetts Department of Elementary & Secondary Education
Oklahoma Department of Corrections Successful Completion of the Personal Data Summary Sheet (Form OPM-4B)
Module 4B Grinder & Waste Conveyance Inspections/Sampling.
Grease Ordinance Experiences By: Chuck Bellmore Mt. Clemens Utilities Department.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
1 INTERNAL CONTROLS Thomas Chin October 5, Presentation Topics Requirements – Internal Control Time and Effort Reporting Statistics on Single.
Oklahoma Department of Corrections Successful Completion of the Personal Data Summary Sheet (Form HCM-4B)
NPDES Primer for Executive Officers of Wastewater Facilities Indiana Department of Environmental Management Office of Water Quality Compliance Branch.
Contractor Management and ISO 14001:2004
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
1 Common Issues on Plans Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals Issued.
Documents and Records-Writing a Quality Manual-Module 16 1 Quality Manual Structure and Contents Quality Manual Structure and Contents - optional.
Quality Assurance/Quality Control Policy
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Inspection Records and Reports NC DWR, Raleigh Regional Office 3800 Barrett Drive Raleigh NC (919)
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
Operational Evaluation Level Stage 2 D/DBP Rule Compliance Michael W. Deal Compliance Assurance Section Central Office Division of Drinking And Ground.
Industrial Inspections Making Good Inspections Better David Long EPA Region 6.
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
Storm Water Pollution Prevention Training
After the Sanitary Survey
Occupational Health and Safety
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
Fiscal Compliance for Title III Keisha Davis Monitoring & Compliance Section School Business Division
Region 2 Healthcare Compliance Initiative 1 Region 2's Healthcare Compliance Initiative: Environmental Results From An Integrated Strategy Leveraging Limited.
PERMITTING AND COMPLIANCE Wastewater Utility Council May 17, 2006.
Module 5: Assuring the Quality of HIV Rapid Testing
Chapter 5 Internal Control over Financial Reporting
ERT 417 WASTE TREATMENT IN BIOPROCESS INDUSTRY W ASTE M INIMIZATION & M ANAGEMENT.
MS4/sMS4 Annual Report Development Thea Lomax Presenter Storm Water Enforcement Thea Lomax Presenter Storm Water Enforcement Prepared 07/04/2011.
# 1: F 282 The services provided or arranged by the facility must be provided by qualified persons in accordance with each resident’s written plan of.
Industrial User Permits: Monitoring Requirements.
The Mercury Challenge An Opportunity for Ohio Hospitals. Ohio EPA Office of Pollution Prevention & CGH Environmental Strategies, Inc.
Charter School 2015 Annual Finance Seminar Grant Management Office of Grants Fiscal September 11, 2015.
Universal Waste. Changing Regulations Universal Waste Regulations started with Businesses and were eventually extended to Households.Universal Waste Regulations.
Mercury Pollution Prevention in Healthcare Initiative Erie County Department of Environment & Planning Western New York Healthcare Association Buffalo.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
Interdepartmental Placement of Employees Returning to Work Following Approved Leave County of Los Angeles Department of Human Resources July 6, 2011.
Fiscal Compliance for Title III Keisha Davis Monitoring & Compliance Section School Business Division
Purpose of Stormwater Pollution Prevention Plans (SWP3s) for Industries Richard Smith Resource Management Conference Tulsa Garden Center March 26, 2015.
QUALITY MANAGEMENT STATEMENT
Test Your Storm Water Knowledge!
MCM#6 Pollution Prevention/Good Housekeeping Part 1 Municipal Facility Management.
February 11, 2011 Industrial Stormwater Permit and Annual Report Preparation Instructor: George Caamano.
1 Industrial Waste Data Tracking: Surveys & Other Information Collection Presented by: Melissa Reboul LDEQ Pretreatment MODULE 3.
Regulatory Issues in Laboratory Management
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
2016 FDOT Maintenance Conference Presented by: Robert J. Potts.
Yvonne Baker Environmental Scientist Staff Rules for Receipt of Sewage Sludge for Disposal/Treatment.
BACWA – Leading the way to protect our Bay Mercury Watershed Permit Special Provisions BACWA Annual Members Meeting January 29, 2009 Michele Pla Melody.
Pollution Prevention & Management DentalBMPs. Overview Amalgam in POTW New EPA Guidelines City of Tulsa Dental BMPs.
Quality Assurance.
Personnel.
Hampden Township Stormwater Management Program
ACA Fall Conference September 15, :00 pm to 5:00 pm Industrial General Storm Water Permit requirements for fueling activities Aaron Ortiz QISP WGR.
Mercury Minimization Plans
Acceptance Process for Manufactured Products by Certification:
NC DPPEA Compliance Assistance - Water
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
MS4 OVERVIEW 2015.
CR-GR-HSE-405 Industrial hygiene
Presentation transcript:

Mercury Reduction Plan (MRP) Big Rapids Ordinance NO Chapter 53, Title 5, Section (B) Mercury Reduction Plans

Potential Mercury Source(s) Potential source of Mercury Location within Facility Potential source of Mercury Location within Facility Potential source of Mercury Location within Facility Potential source of Mercury Location within Facility Potential source of Mercury Location within Facility

Quantifiable BMP Strategies 1. Replace known mercury source with non-mercury 2. Segregate mercury source from sanitary sewer discharge. 3. Determine and implement alternative disposal methods for mercury source. 4. Recycle mercury source chemical to prevent sanitary sewer discharge. 5. Purchase mercury spill kits and implement plan to contain spilled Hg product. 6. Improve housekeeping practice to prevent Hg from reaching sanitary sewer. 7. Implement alternative production processes which do not require the use of Hg containing reagent. 8. Document the number of dental procedures where Hg was replaced or installed with a nonmecury material. 9. Other Mercury reduction strategies.

TRADITIONAL STRATAGIES 10. Create a baseline monitoring program to test for Hg over a given period of time to show reduction of discharge. 11. Sample individual sinks and internal locations to locate/ trace previously unidentified Hg sources for reduction. 12. Power flush and vactor sewer lines to remove residual Hg contained in lines. 13. Remove Hg from lines using sodium sulfide and vactoring to collect Hg. 14 Reline and / or replace lines containing Hg. 15. Implement a program for sink trap cleaning. Segregate sink trap residuals for proper disposal. 16. Install and maintain additional sink traps. 17. Evaluate and install pretreatment where appropriate. 18. Replace Hg containing equipment susch as pump switches, thermostats, and as identified. 19. Implement other mercury treatment style strategies.

Demonstration of Mercury Source Reduction /Elimination The reduction/elimination of mercury discharges to the sanitary sewer is demonstrated and or documented by: ________ Our analytical results show a reduction in mercury discharges at the outfall. (Please include laboratory results from the latest quarter); ________ Our internal monitoring / sampling for mercury shows a reduction. ( Provide laboratory results from individual lines, sinks, and traps); ________ Other method(s) of demonstrating reduction. Describe. ________ The effectiveness of our reduction efforts has been has/not been demonstrated. (Describe for each source and strategy.)

Mercury Reduction Plan (MRP) Semiannual Report The semiannualreport is due on or before Janruary 10 and July 10 of each year until the MRP is completed and the POW has notified your facility to discontinue these reports. The MRP semiannual report may be submitted and updated on this form Please keep an original copy of this for your records. The MRP Semiannual Report consists of the cover sheet, a certification of progress, and the following attachments reflecting the activities of the last two quarters. Failure to update the attachments will constitute noncompliance with the MRP requirements. The following Updated attachments are required: 1. Quarterly analytical results for mercury monitoring at the outfall. 2. Updated MRP source sheets. 3 Updated MRP action sheets ( if used)

MRP CERTIFICATION; As an authorized representative for ________________________________________, I hereby certify that to the best of my knowledge my company has implemented a Mercury Reduction Plan in accordance with the requirements of our plan. I have reviewed the attached Mercury Reduction Plan Semiannual Report and updated attachment and find these to be an accurate description of our mercury reduction progress to date. Our goal is to reduce mercury discharges into the sanitary sewer system < 0.2 mg/l within three years of our Mercury Reduction Plan approval date. I certify under penalty of law that this document and al attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, submitted is to the best of my knowledge and belief,true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. SIGNED __________________________________________ DATE _________________________ PRINT NAME ___________________________________________

Time Line for Strategy action Mercury SourceRemoval Strategy Date implementedDate of Completion _____________ _____________________________________ __________ ________________