8th ESLS RF Workshop Daresbury 29-30 September 2004 SUPER-3HC - M.Svandrlik 1 G.Penco, M.Svandrlik Operation Uptime Maintenance Performance vs filling.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Longitudinal instabilities: Single bunch longitudinal instabilities Multi bunch longitudinal instabilities Different modes Bunch lengthening Rende Steerenberg.
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
Giuseppe Penco - Valencia 5-6 May Introduction 2  The main challenge of the third generation Synchrotron Light Sources is the increase of the.
Beam Instability Workshop, ESRF, 13th - 15th March 2000J. Jacob / 1 Harmonic Cavities:the Pros & Cons Jörn Jacob.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Low Emittance RF Gun Developments for PAL-XFEL
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
3rd Libera Users Meeting
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
STATUS OF THE SOLEIL RF SYSTEM
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs A.Farricker 1, R.M.Jones 1, R.Ainsworth 2 and S.Molloy 3 1 The University.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
LONGITUDINAL COUPLED-BUNCH OSCILLATIONS IN THE RECYCLER RING PRESENTED BY: MUHED RANA UNIVERSITY OF MARYLAND, BALTIMORE COUNTY (UMBC), BALTIMORE, MD SUPERVISOR:
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Operation Status of the RF Systems and Taiwan Photon Source
HOMs in high-energy part of the Project-X linac. V. Yakovlev, N. Solyak, J.-F. Ostiguy Friday 26 June 2009.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
PETRA III, Status and Upgrade
PS status 10 August – 17 August 2017
Bocheng Jiang SSRF AP group
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
RF operation of REX-ISOLDE
Bunch Separation with RF Deflectors
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Mathew C. Wright January 26, 2009
Collective effects in CEPC
Summary of Week 16 G. Arduini, J. Wenninger
Operation Progress and Upgrade in SSRF
Fault Recovery Time for C100 Modules Spring ‘16
PETRA IV System design concept Old and new machine
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Harmonic RF systems for ESRF-EBS - Preliminary considerations -
Passive harmonic cavities for bunch shortening
Collective effects in the SPS and LHC (longitudinal plane)
ERL Director’s Review Main Linac
Tuesday 20 September 2011.
ESRF Experimental Contribution Towards Working Group Introduction
Presentation transcript:

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 1 G.Penco, M.Svandrlik Operation Uptime Maintenance Performance vs filling Conclusions SUPER-3HC at ELETTRA Update

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 2 3HC is routinely in operation during user’s shifts. Lifetime depends on ultimate vacuum conditioning and filling pattern, highest value we can obtain is 27 hrs (320 mA; 2.0 GeV) Filling pattern set to 96% During refill and energy ramping 3HC set at +94 kHz (from 3 rd harmonic) - Transverse Feedbacks ON Once beam is at 2.0 Gev 3HC is activated by tuning it at +64 kHz Longitudinal Coupled Bunch Instabilities are cured by 3HC, Transverse Instabilities are cured by Feedbacks. Operation/Uptime/Maintenance/Performance vs Filling

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 3 The increase in Beam Lifetime obtained when 3HC is active, allows us to refill ELETTRA every 36 hrs instead of 24 hrs, as it used to be in the past. Operation/Uptime/Maintenance/Performance vs Filling 3HC tuned:only 3 refills in 5 days operation How it was before 3HC

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 4 General uptime of the system is good. Since September 2003 only one event caused significant User’s downtime, on Saturday, 31/01/2004. Operation/Uptime/Maintenance/Performance vs Filling

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 5 The event on 31/01/04 was related to a failure of a rough pumping unit of the valve-box insulation vacuum. This was a temporary installation, replaced during the next shutdown with a fail-safe one. The uptime statistics does not include systems stops due to electrical power interruptions, mostly caused by thunderstorms in the surroundings. In this case most machine systems are stopped and the restart time of the cryogenic plant is hidden in the general restart of the systems. For this reason the idea of connecting 3HC to a new UPS has not yet been implemented (also financial reasons). We still do not have a He recovery system, the experience made so far shows that we can survive without it, not affecting the uptime of the system. Operation/Uptime/Maintenance/Performance vs Filling

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 6 Several important maintenance interventions have been successfully performed in the last 12 months. In November 2003 the leaky gate valve between 3HC and the superconducting wiggler was substituted. Operation/Uptime/Maintenance/Performance vs Filling This required to break the cavity vacuum. A clean area was therefore created inside the storage ring tunnel. The replacement followed clean room procedures and was done by CEA and Elettra staff. The field performance of the cavity has not been affected by this intervention.

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 7 In December 2003 the tuning system of cell 1 failed for the 2 nd time (1 st time in March). In January 2004 the tuning system was replaced with an upgraded version. The tuning system is under vacuum, at cold. The gear box was found to be blocked. Tests at Saclay showed that the reason could be a heating problem (from the motor). Operation/Uptime/Maintenance/Performance vs Filling Even if the number of cycles after which this shows up is huge, we are limiting the movements of the system. No problem since January 04 CEA is studying a solution to move the motor outside the cryomodule.

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 8 During the January shutdown the cryogenic plant annual maintenance was performed. After this maintenance the nominal performance is back to the original, i.e. about litres/hour at 13 bar of HP. In August 2004 the cryomodule has been warmed-up again in order to replace a coaxial cable which takes out the voltage signal of cell 2. In this occasion also the fundamental mode rejection of the dipolar HOM couplers has been improved. In fact on one of them some over-heating effects were observed when tuning the cell. Operation/Uptime/Maintenance/Performance vs Filling

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 9 Operation/Uptime/Maintenance/Performance vs Filling ELETTRA used to operate with a partial filling of the bunch train: typically a 10% empty gap was present. As well known, with such a gap the passive third harmonic cavity induces a phase modulation over the bunch train. Several STREAK CAMERA experiments were performed for various fillings, measuring the effect on: –Phase Shift –Bunch lengthening –Landau Damping –Beam Lifetime As a result, a new optimum filling was set for operations.

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 10 I beam =315mA, Filling at 80% 80% Filling: Phase Shift/Bunch Length/Landau/Lifetime

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 11 Bunch overstretching I beam =315mA, Uniform Filling 100% Filling: Phase Shift/Bunch Length/Landau/Lifetime

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 12 f= +92 kHzf= +82 kHzf= +62 kHzf= +72 kHz The Bunch Profile Averaged on the bunch train in the case of Uniform Filling is shown below for different tuning positions of 3HC. The “nominal tuning” of 3HC would be around +75 kHz. Beyond this postion the Bunch begins to show an overstreched profile. Beam Lifetime increases until the position of +62 kHz, which is the operating position. A few kHz beyond that, lifetime starts to decay to a few hours; further the beam is lost. 100% Filling: Phase Shift/Bunch Length/Landau/Lifetime

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 13 Various Fillings: Phase Shift/Bunch Length/Landau/Lifetime

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 14 Various Fillings: Phase Shift/Bunch Length/Landau/Lifetime

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 15 The Landau damping seems to be influenced by the different contribution of the increasing gap width and of the average bunch length, which is reduced as the gap increases. Various Fillings: Phase Shift/Bunch Length/Landau/Lifetime Scale is different!

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 16 Uniform Filling90% Filling f= +112 kHz f= +92 kHz f= +62 kHz Longitudinal UNSTABLE Beam Longitudinal STABLE Beam Bunch Length is Uniform Phase Modulation present. Bunches are longer in the train centre. Stronger Phase Modulation Various Fillings: Phase Shift/Bunch Length/Landau/Lifetime These strak camera images show the different effect of 3HC on the beam between 90% filling (on the left) and uniform filling (on the right). The Landau damping effect is similar in both cases, the 90% filling shows the expected effect of the phase modulation along th ebunch train.

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 17 The best performance in terms of lifetime is obtained with a fractional filling of 96%. By further increasing the filling, the maximum obtained lifetime is lower, suggesting that the optimum setting for ELETTRA requires a small amount of “empty gap”. The 96% filling is now taken as the new standard filling pattern for User’s Operation Mode (320mA, 2.0GeV). In this condition 3HC is usually tuned from MHz (f=92kHz) to MHz (f=62kHz). Various Fillings: Phase Shift/Bunch Length/Landau/Lifetime

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 18 Machine Upgrades and Ultimate Lifetime Value During 2003 and 2004 several new vacuum chamber installations were performed. In June 2003 a new Aluminum-NEG coated chamber was installed in section ID10. In pre-3HC conditions the nominal lifetime was recovered at a dynamic pressure of about mbar/mA. In the example of the ID10 chamber this took about 70 Ah, i.e. about 2,5 weeks operation. In fact the ultimate lifetime with 3HC active, i.e. about 27 hours at 2.0 GeV 320 mA, was reached mid of September 2003, that is about 6 weeks of operation after the ID10 installation (there were 2 weeks shutdown in August).

8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 19 3HC routinely in operation at Elettra Stable Beam, refill every 36 hours Operability and Reliability good Careful maintenance to prevent faults, recovery time can be long! Experiments at different fillings confirm expected effects (phase modulation, bunch lengthening) New standard filling set to 96% Conclusions