2010 Metal on the roof Installation of exterior doors Developed the Friends of Secesh board
Hal Sager developed this signage board 2010
Metal on the roof and doors installed
Looks good, keep the birds out
Snow is coming early
I’m not shoveling the driveway
2011 Framed inside walls living quarters Rough in electrical, added insulation Finished high bay with OSB sheathing Added skirting metal to exterior walls
Framing the quarters area
Let’s get the electrical in so we can put the insulation up
ALL ABOARD! Next stop Burgdorf
Door lower and skirting on ready for another winter
Yea! No fires this year
How do you shut it off?
Goodbye, see you next summer
2012 Added the wing addition to the building Living quarters (rough plumbing, sheetrock, texture and paint, electrical completed) Painted the high bay Applied log siding to front, sides and steeple
What would we have done, without this donated equipment
Get the level
Holy crap this is heavy
Not too fast, be careful
Looking good
Last one, not too fast
You pick it up and I’ll push
Looks good on this end
Wow, lag screw really long
Now we have shade
More storage for stuff
OK, we’re getting there
Just a few more pieces
You with no hair, can’t work here
Pretty impressive, wouldn’t you say
OK, last side and we’re done
One man job, no problem
Should we put a for sale sign on it