1 BLM 2 BLM 4 BLM 2 BLM 2( BLM+SEM)3 BLM 2 BLM 4 BLM 3 BLM1 (BLM+SEM)3 BLM 2 BLM 1 SEM 1 BLM 1 (BLM+SEM) 1 BLM BPM 1 BLM 2 BLM 4 BLM2 BLM 2( BLM+SEM)3.

Slides:



Advertisements
Similar presentations
LHC 14 & 15 April :22: Ramp to 6.5 TeV lost due to MUFO, resulting in quench 10:30: Access during cryo recovery 16:00: Pre-cycle 17:05: RB.A78 short.
Advertisements

Beam current4 A Beam pulse length1.5 ms Power input/structure 35 MW Ohmic losses (beam on)1.6 MW RF power to load (beam on) 0.4 MW RF-to-beam efficiency.
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing ns.

Beam Transport AIP Beam Transport to Delivery Ring Instrumentation and Controls Update Brian Drendel December 15, 2014.
Current (recycler) timing/trigger system appears to be sufficient for TeV BPMs - add injection event to beam sync - TSG FPGAs nearly full, but dropping.
Speed-Time Graphs for Acceleration All the aspects of creating a speed-time graph are the same as creating a distance-time graph. The slope of a.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
[A, B] = 0 If A and B commute there exist eigenfunctions that are simultaneously eigenfunctions of both operators A and B and one can determine simultaneously.
Timing Board FPGA. Use existing IP version until firmware is ported to new FPGA FPGA Existing IP Carrier UCD Digital I/O TSG Timing Board.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
CALCULATING BEATS PER MINUTE (BPM) If we count the number of beats in 60 seconds, that is the number of beats per minute (bpm)
What’s wrong with this network? IP: SM: Default Gateway: /28 Fa0/1.
PSB MD C. Bracco, G.P. Di Giovanni. Outline Aim MD1: – Matching – Trajectories – Transmission MD2 – Matching – Trajectories – Transmission Next steps.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
中央美术学院 图书馆 2012 级新生入学教育 二〇一二年九月十四日. 一、图书馆基本概况和馆藏资源 二、阅览室使用规则、入馆须知 三、数字图书馆 四、电子存包柜 目录.
江苏建筑职业技术学院图书馆 新生入馆教育. 目录页 CONTENTS PAGE P1. 图书馆概况 P2. 关于借书二、三事 P3. 电子资源推介与使用.
如何利用图书馆 ——— 海南师范大学图书馆( 2014 ) ——— 海南师范大学图书馆( 2014 )
Results of TCL scans D. Mirarchi, M. Deile, S. Redaelli, B. Salvachua, Collimation Working Group, 22 nd February 2016.
Hardware Commissioning Review BDI Equipment
Results of the 2007 BLM hardware tests in LSS5
Collimation Activities during EYETS
ILC Beam Instrumentation – Introduction Remarks –
LHC Beam Commissioning Meeting V. Kain & R. Alemany
TANB Integration – LS2 BLM Relocation Proposal C4R8 and C4L8
R2E impact of TCL settings: input for 2017 operation
SUMIT KUMAR M.Sc 3 rd sem BOTANY DORMANCY SEED & BUDS
Automatic Generation of the Radiation Level Weekly Reports Update 28
A. B. * * Systolic blood pressure (mmHg) Diastolic blood pressure
Disabling Rules.
Monday fill with 1092 bunches (6 h stable beams)
Does ghrelin level change after epileptic seizure in rats?
Antitumor effect of the combination of IL-2 IC and anti–CTLA-4.
CNGS Proton Beam: Introduction
الاسبوع الإرشادي.
Interpretation and use of BLM Data
BDU20303 Sem I 12/13.
Monday – recovery from MKI flashover
Serum IgG (A–D) and IgA (E–H) titer from BALB/c mice (n = 5/group) at day 0 or following COBRA P1 virus i.n., i.p., or i.m. prime at day 21 or following.
شبكة الانترنت العالمية
SEM monitors tests PSI February MeV protons
Sensitivity tests of BLM_S chamber in PSB dump
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
LHC Status Sun Morning 20-Mai
LS1 status 28/04/2014.
Защита на информация В мрежова среда.
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
/ / / / / /27.
Monday – Morning Fill 3265 stable beams since 1:31
Summary of EU (student Worksheet)
Fig. 7 pDCs are critical for the maintenance of skin fibrosis and for the presence of CXCL4 in the skin. pDCs are critical for the maintenance of skin.
NAME : ROSHANI K. HARALE CLASS : M.B.A. II sem SUBJECT : ECONOMIC ENVIRONMENT OF BUSINESS TOPIC NAME : OVERVIEW OF GAAR.
Fig. 8 TLR8 exacerbates disease in the BLM-induced fibrosis model.
GM-CSF–producing γδT cells are involved in the development of EAM
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday – Morning Energy matching at injection with H CODs
CXCR5 expression accelerates Eμ-Tcl1 leukemogenesis and is indispensable for tumor cell recruitment to lymphoid B-cell follicles. CXCR5 expression accelerates.
EGFL7 increased surface expression of integrins α5β1 and αVβ3
Injection Region BLM changes
D 1 E 1 S E M N G ม. I G I T At home A L 4.0.
Chimeras emerge with intermediate spring rate κ in a “competition” zone between two fully synchronous modes. Chimeras emerge with intermediate spring rate.
TRILUX Deca WD3 3TCL24 E Description - Luminaire type
Senescence-associated inflammation, bone marrow suppression, and cardiac dysfunction. Senescence-associated inflammation, bone marrow suppression, and.
Thursday
Speed-Time Graphs for Acceleration
Inhibitory effect of different doses of IP6 on prostate tumor progression in TRAMP mice. Inhibitory effect of different doses of IP6 on prostate tumor.
Dose-dependent effect of IP6 feeding on molecules associated with tumor sustenance and glucose transportation in dorsolateral prostate of TRAMP mice. Dose-dependent.
Determination of MTD for romidepsin and pralatrexate and associated antitumor activity. Determination of MTD for romidepsin and pralatrexate and associated.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Expression of IFN-λs, IFN-λR1, and IL-10R2 in Xenopus tissues after stimulation in vivo with poly(I:C). Expression of IFN-λs, IFN-λR1, and IL-10R2 in Xenopus.
Presentation transcript:

1 BLM 2 BLM 4 BLM 2 BLM 2( BLM+SEM)3 BLM 2 BLM 4 BLM 3 BLM1 (BLM+SEM)3 BLM 2 BLM 1 SEM 1 BLM 1 (BLM+SEM) 1 BLM BPM 1 BLM 2 BLM 4 BLM2 BLM 2( BLM+SEM)3 BLM 2 BLM 4 BLM 3 BLM1 (BLM+SEM)3 BLM 2 BLM 1 SEM 1 BLM 1 (BLM+SEM) BPM TCL 1 (BLM+SEM) 1 BLM 1 (BLM+SEM)

IP3 1 BLM 3 BLM 4 BLM2 BLM 3 BLM 2 BLM 4 BLM3 BLM 2 BLM 1 SEM 1 BLM 1 (BLM+SEM) BPM TCL 1 (BLM+SEM) 2 BLM 1 (BLM+SEM) 2 BLM IP1 1 BLM 3 BLM 2 BLM 4 BLM 3 BLM 4 BLM 2 BLM 3 BLM 1 SEM 1 (BLM+SEM) BPM 1 (BLM+SEM) 3 BLM 1 (BLM+SEM) 2 (BLM+SEM)2 BLM 3 BLM 6 (BLM+SEM) 1 BLM

IP1 6 (BLM+SEM) IP7 1 BLM 3 BLM 2 BLM 4 BLM 3 BLM 4 BLM 2 BLM 3 BLM 1 SEM 1 (BLM+SEM) BPM 1 (BLM+SEM) 3 BLM1 (BLM+SEM) 2 BLM 3 BLM 1 (BLM+SEM) 1 BLM 2 BLM 4 BLM3 BLM 2 BLM 3 BLM 2 BLM 4 BLM3 BLM 2 BLM 1 SEM 3 BLM1 (BLM+SEM) BPM TCL 2 BLM 1 (BLM+SEM) 2 (BLM+SEM)1 (BLM+SEM) 3 BLM 1 BLM