SETTING OUT Horizontal Angles. Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical.

Slides:



Advertisements
Similar presentations
Theodolite: Introduction
Advertisements

Study Lesson 2 Using drawing tools & applied geometry.
Lesson Using Surveying Equipment. What should you not have for class everyday? 1.Binder 2.Pen/pencil 3.Paper 4.Clicker 5.None of the above.
Surveying Chain Surveying
Learning is like rowing upstream. Advance or lose all. -Anonymous.
Angles.
Motors and Automatic Target Recognition Motors... l Motorized Instruments have 2 Motors: –One to Rotate the Alidade Horizontally –A Second to Rotate.
Distance measurement Physical unit = metre (m) = the length of the path travelled by light in vacuum during a specific fraction of a second (1/
Inside-, Depth-, and Height-Measuring Instruments
Micrometer Sizes range from 0 to 1 inch up to 12 inches.
Distance observations
CE 260 SURVEYING CHAPTER 5.
S.H.H.S Building Construction
CIVL 102 Leveling Lab Briefing on Field Work. Instrument error  suppose Instrument error  suppose line of sight not truly horizontal as telescope is.
Manufacturer’s Recommendation for Setting up a Theodolite
This training was prepared by the U.S. Department of Agriculture (USDA) team of Otto Gonzalez-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
Introduction to surveying
Surveying Equipment.
Angular measurement 1. Line of sight – the join of the points S and P Horizontal direction – the intersection between the vertical plane  i where is.
1.Meet B Parmar ( ) 2.Swapnil A Parmar ( ) 3.Pratik C Patel ( ) B.E- 2 SEM MECHANICAL ENGINEERING LINEAR MEASUREMENTS.
Measuring Distance ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides.
Surveying I. Lecture 13. Tacheometry.
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
LINEAR MEASUREMENT.
Chapter 2 Using Drawing Tools & Applied Geometry.
Project FUNDA Hear it Learn it Let’s make engineering more easy engineering108.com.
TOTAL STATION SET UP PROCEDURE
ERT247/4 GEOMATICS ENGINEERING
THEODOLITE SURVEYING THEODOLITE SURVEYING
Geology and Surveying (Part B - Surveying) Distance Measurement.
ERT247/4 GEOMATICS ENGINEERING
Lesson Applying Differential Leveling Techniques.
Using Drawing Tools & Applied Geometry Preparation of Tools. Using of Tools Applied Geometry.
Topic : Theodolite Traversing
THEODOLITE SURVEYING THEODOLITE SURVEYING. THEODOLITE SURVEYING THEODOLITE SURVEYING.
Marine Sextant and Bearing instruments
ENGINEERING COLLEGE, TUWA SUBMITED BY: ISMAIL A. JANAB TAHER Y. POONAWALA AMMAR S. DUDHIYA TAHER F. CHHARCHHODA.
Surveying Equipment. Builder’s Level A telescope instrument used to check level of forms or field grades. Builders' levels are designed to be used for.
Field Methods 2 When a GPS only won’t do: –Forestry canopies –Canyons (no reception or can’t reach) –Underwater –Small areas when you don’t have a sub-
Traversing: Theodolite Traverse
Mr. Vedprakash Maralapalle, Asst. Professor
Theodolite Traversing Mr. Vedprakash Maralapalle, Asst. Professor
ENGINEERING COLLEGE TUWA
FACULTY OF ENGINEERING TECHNOLOGY AND RESERCH, TAJPORE, BARDOLI CIVIL ENGINEERING DEPARTMENT SURVEYING ( )
Miscellaneous Measurements
Theodolite: Introduction
Technology and Engineering
Theodolite: Introduction
S. N. PATEL INSTITUTE OF TECHNOLOGY & RESEARCH CENTRE , UMRAKH
Detail Surveys, Tacheometry, Total Stations
Introduction Theodolite is used to measure the horizontal and vertical angles. Theodolite is more precise than magnetic compass. Magnetic compass measures.
THEODOLITE TRAVERSING BY S N Nanaware
Setting Out, Theodolites and Total Stations
Syllabus Introduction to drawing Dimensions and scale
Marine Sextant and Bearing instruments
Surveying Equipment.
SURVEYING – II THEODOLITE
Leveling By : Parveen Kumar.
Leveling.
Leveling.
THEODOLITE.
Leveling.
Leveling.
Leveling.
Theodolite - Instrument Checks
Revise No. 1.
Leveling.
Bisecting an angle.
Presentation transcript:

SETTING OUT Horizontal Angles

Ensure instrument is set to measure angles in the appropriate direction. ( refer to operators manual) Unclamp both vertical and upper horizontal clamps. Ensure lower horizontal clamp (if fitted) is locked. Use target finder to locate reference target station keeping one hand on horizontal clamp. Clamp in smooth operation when target located. Look through telescope and bring target into focus. Start with focussing ring turned fully one way then will avoid “missing” focal point. Use Horizontal and Vertical tangent screws to bring stadia lines over target. Ensure that target is vertical or use the lowest point visible.

Target

Set angle Zero set instrument (refer to manual) Unclamp horizontal clamp and move instrument round until digital read out is within 1  of desired angle. Clamp horizontal and use tangent screw to adjust digital read out to desired angle. Be aware of accuracy of instrument. (typically 5”) Give arm signals to assistant to locate ranging rod in desired direction. Target the point of the ranging rod.

Assistant’s role Stretch out tape ( or accurately pace) in viewing direction Hold ranging rod vertically at approx set out distance. Follow arm signals from engineer NOTE: Do not move rod haphazardly. Bisect the difference between rod movements. This will very quickly get you to the correct direction. 1st 2nd 3rd 4th 5th

Replace ranging rod with stake – hold stake centre-line adjacent to correct measurement on tape and drive stake in vertically. (ensure that the tape is held approx level OR use calculated sloping distance) Place tape on stake head and mark, with a pencil, an arc of radius equal to setting out distance. (slope corrected if necessary) Assistant’s role – Taped measurement

Move nail across arc and follow engineers arm signal to get correct direction. Mark nail position to make a cross with previously drawn arc. At this point the Engineer will transit the telescope and repeat the angle setting out in the opposite face. Follow the engineers arm signals and then mark a second cross on the previously drawn arc Bisect the difference between the two crosses and drive in a nail vertically Assistant’s role – Taped measurement

Once on correct line, replace ranging rod with reflector prism on short spike. Set spike to approx distance and follow engineers arm signals for moving back or forward. (Bisect difference as for transverse movements) Mark ground and drive in vertically a stake at this point. Repeat location on stake head and mark with pencil. At this point the Engineer will transit the telescope and repeat the angle setting out in the opposite face Locate and mark a second point on the stake head. Drive in a nail half way between the two crosses. Check distance to the nail. Assistant’s role – using EDM and Reflector

Face I and Face II Once the engineer has located the stake out point in face I setting he must repeat the same operation in the face II setting. This eliminates any collimation errors due to the vertical axis not being truly perpendicular to the trunnion axis. Face I Face II arc Nail centred between two marks