ROS June 12, 2008 Meeting ROS Report for June 26, 2008 TAC Meeting Randy Jones ROS Vice Chair.

Slides:



Advertisements
Similar presentations
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Advertisements

SAR-003-TRE-001 FERC-Ordered Modification to ERCOT waiver CPS2 Prepared By Ananth Palani, EnergyCo.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
March 30, 2015 Report Discontinuance Tracking - MISUG.
TAC RELIABILITY AND OPERATIONS SUBCOMMITTEE CMWG/PLWG Planning Criteria Review/Update Report to WMS Austin, TX August 10, 2011 Kenneth A. Donohoo, P.E.
Texas Regional Entity Compliance Report Board of Directors June 15, 2009.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
RTWG Report to TAC August 5, 2010 Howard Daniels.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Texas Regional Entity Compliance Report Board of Directors May 19, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
September 4, 2008 TAC Meeting Summary For Sept. 11 ROS Meeting Paul Rocha ROS Chair.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, ROS Action Plan Item 1e.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
TAC Meeting Update. Board Update and TAC Voting Item Kenan Ogelman, Vice Chair of TAC gave the Board Update. It included recommendation that TAC.
Item 5: PRS Report John Varnell 2014 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public August 28, 2014.
Technical Advisory Committee Presentation to the ERCOT Board of Directors June 16, 2009.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
September 25 and October 23, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 28, 2014 TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Wind Operations Task Force Overview for ROS Feb 2009 mtg: WOTF has drafted a scope for ROS to consider. WOTF recommendations for Chair & Vice Chair: Chair.
1 TAC Report to the ERCOT Board November 14, 2006.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
QSE Managers Working Group Report to WMS September 19, 2007.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Page 1 of 21 Texas Regional Entity ROS Presentation June 11, 2009 T EXAS RE ROS P RESENTATION J UNE 2009.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
PDCWG Report to ROS October 16, 2008 Bob Green PDCWG Chair Garland Power & Light.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
Wind Operations Task Force Overview for ROS Jan 2009 mtg: WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5. The WOTF makes no recommendation to.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee
August 25, 2016 TAC Update to COPS
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Oncor Electric Delivery Company LLC
Presentation transcript:

ROS June 12, 2008 Meeting ROS Report for June 26, 2008 TAC Meeting Randy Jones ROS Vice Chair

TAC Voting Items (approved at ROS June meeting)  NOGRR018, Synchronization of OGRR204, “Hotline Technology Update”  NOGRR019, Synchronization of OGRR206, “Black Start Satellite Phones”

EECP ROS Action Plan / Wind Workshop Follow-Up Items  ROS concurred that “Changes to Protocols/Guides: Run multiple CSC limit studies” [Item 3f ], assigned to the ROS Wind Operations Task Force (WOTF), is now complete.  As of June 10 th, ERCOT has implemented this for all five CSC areas.  A PRR and a NPRR are not required.  The WOTF provided the status of other assigned items.

EECP ROS Action Plan / Wind Workshop Follow-Up Items  ROS concurred with the wording proposed by the OWG concerning “Changes to Protocols/Guides: Re-examine the EECP Steps (should ERCOT's obligation to issue a public appeal for conservation be optional?)” [Item 3h].  The OWG will initiate an OGGR to eliminate the requirement that an appeal must be made in Step 2. Per TAC, a PRR and a NPRR are also required.  A recommendation was made that wording be reviewed and clarified, if needed, to eliminate any confusion that it is acceptable for a local TSP to issue an energy conservation appeal for transmission congestion without receiving any directive from ERCOT.  ROS concurred with the OWG concerning “Changes to Protocols/Guides: Ancillary Service procurement methodology (Increase RGS,RRS,NSRS during high-risk periods)” [Item 3c].  This is no longer assigned to the OWG. The WMS will take the lead on this issue, with the WOTF following what the WMS is proposing.

ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008)  OWG (Operations Working Group)  PDCWG (Performance Disturbance Compliance Working Group) Item 3aChanges to Protocols/Guides: Wind Generation ramp rate limitations [assigned to ROS & WMS] Item 3hChanges to Protocols/Guides: Re-examine the EECP Steps (should ERCOT's obligation to issue a public appeal for conservation be optional?) Item 1eInterconnection Process: System Inertia (generator governor response) [with inertia data from DWG]

ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008)  WOTF (Wind Operations Task Force) Item PDCWG 1 What can be done to improve STLF performance when previous day load profile and current day load profiles are obviously different? Can a ‘similar day’ profile be substituted for the previous day profile? COMPLETE Item PDCWG 2 All QSEs including wind QSEs MUST be vigilant in updating their Resource Plan and keeping it accurate. COMPLETE Item 1aInterconnection Process: Better defined voltage support requirements Item 1bInterconnection Process: Better defined SCADA control on generation breakers Item 1cInterconnection Process: ERCOT/TSP/Generator voltage management practices

ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008)  WOTF (Wind Operations Task Force) [Continued] Item 1dInterconnection Process: Generation Interconnection Synchronization checklist (how will generation unit’s provide reactive support/voltage control) Item 2aCompliance/Performance Measures: 24/7 communication must be available for TSP to reach wind generators Item 3aChanges to Protocols/Guides: Wind Generation ramp rate limitations [assigned to ROS & WMS] Item 3bChanges to Protocols/Guides: PRR to mandate use of AWST 80% forecast in wind Resource Plans COMPLETE Item 3cChanges to Protocols/Guides: Ancillary Service procurement methodology (Increase RGS, RRS, NSRS during high-risk periods) [assigned to ROS & WMS]

ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008)  WOTF (Wind Operations Task Force) [Continued] Item 3dChanges to Protocols/Guides: Mid Term and Short Term Load Forecast weather sensitivity COMPLETE Item 3eChanges to Protocols/Guides: Evaluate transmission line and wind power production outage criteria Item 3fChanges to Protocols/Guides: Run multiple CSC limit studies COMPLETE Item 3gChanges to Protocols/Guides: Dynamic line ratings Item 4Training: wind generator knowledge of plant equipment/controls/best practices

Other ROS Meeting Highlights  ROS approved the slate of volunteers for the Standard Drafting Team for NERC Regional Reliability Standard SAR-002-TRE-01, “Development and Documentation of Regional UFLS Programs”. Randy Jones Calpine will be the Interim Chair.  ROS approved the slate of volunteers for the Standard Drafting Team for NERC Regional Reliability Standard SAR-003-TRE-01, “FERC-Ordered Modification to ERCOT Waiver to R2 of BAL CPS2”. Ananth Palani EnergyCo will be the Interim Chair.

Other ROS Meeting Highlights  The draft Single Entry Model (SEM) Approach Document was discussed.  The ERCOT Operations Report included only one event of a special protection system (SPS) arming and actuating.  The ERCOT Operations’ update on Unannounced Unit Testing was discussed. A recommendation was made for ERCOT to provide improved communication at the beginning and the end of the test period.

Questions & Answers