Project-Based Learning October 30, 2009 Pioneer Middle School.

Slides:



Advertisements
Similar presentations
Project-Based vs. Text-Based
Advertisements

Shawboro Elementary School Home of the Mustangs School Improvement Plan Results and Next Steps October, 2009.
Modifications for All Learners
PD Plan Agenda August 26, 2008 PBTE Indicators Track
Co-Teaching? What’s That?
Isabella State School Jolly Phonics Information Session.
Netcong School Student Driven Curriculum & Professional Development Action Plan
1 TAG Communication Identification Services 2011 Fall Parent Meeting For Parents of TAG Identified Students and Those Who Are Interested in Finding Out.
1 TAG Communication Identification Services 2014 Fall Parent Meeting For Parents of TAG Identified Students and Those Who Are Interested in Finding Out.
Introduction to Career Management. Understand what is meant by ‘Career Management’ Review your current position Look ahead at the skills and knowledge.
Project-based Learning and Assessment Leslie Opp-Beckman University of Oregon.
MCESC RESIDENT EDUCATOR CONSORTIUM Year 3 and Year 4 Resident Educators and Mentors/Facilitators Session #2 November 20 th, 2014.
Understanding the Process and the Product Professional Development Spring, 2012.
Presenter: Gary Bates.  “If a certificated employee receives a rating of ineffective or improvement necessary, the evaluator and the certificated employee.
Copyright © 2008, Intel Corporation. All rights reserved. Intel, the Intel logo, Intel Education Initiative, and Intel Teach Program are trademarks of.
Bank of Performance Assessment Tasks in English
Copyright © 2008, Intel Corporation. All rights reserved. Intel, the Intel logo, Intel Education Initiative, and Intel Teach Program are trademarks of.
Marzano Instructional Strategies. Research-Based Instruction Robert Marzano, Debra Pickering, and Jane Pollock reviewed hundreds of studies on instructional.
“It‘ll Be Here Before You Know It!” What you’ll need to know to get your child ready for High School.
CCSS & NYS Teaching Standards ELA Training Liane Benedict Oswego County BOCES Sign in & put on a name tag Sit by grade level No more than 2 people at a.
Curriculum Mapping.
Competency Area A: Communicating with Paraprofessionals.
Task 4 Mathematics Boot Camp Fall, 2015.
1 Their Needs And Characteristics Young Adolescents:
LESSON PLANNING W301 Week 8 Adding Detail to Your Preliminary Plan  The preliminary plan allowed you to look at the big idea and make sure it fit with.
Unit Presentation Ruth Arce. “ A man paints with his brains and not with his hands” -Michelangelo.
Alternate Assessment Attainment Task Part 2.1 Click here to download the Administration Guide Required for completion of this training Overview/Attainment.
Blue Springs Elementary School Standards Based Report Card Parent Meeting.
Welcome to Curriculum Night! Walnut Hills Elementary
WELCOME SUNSHINE ROOM FAMILIES!!! Please sign in on the sheet by the door, grab one of each of the papers there and find your child’s seat. There is an.
Reading & Writing English Language Arts/Literacy Standards Shift In Reading & Writing NON-FICTION EVIDENCE ACADEMIC REAL-WORLD EXAMPLES UNDERSTANDING.
Why PBL? h?v=LMCZvGesRz8https:// h?v=LMCZvGesRz8.
1.02 Lesson Summary and Assessment
GATE/SAS Gifted and Talented Education and School for Advanced Studies Cowan Avenue Elementary.
Module 3: Incorporating Flexible Groupings into Instruction
Fourth session of the NEPBE II in cycle Dirección de Educación Secundaria February 25th, 2013 Assessment Instruments.
Directions for Creating a Timeline Become a Historian. After reading about your topic, create a timeline that includes the key ideas or events, documenting.
Chris Eldredge Kate Collins Middle School 8 th Grade Math July 29, 2010.
Pennsylvania Standard J. Geometry Standard
Jack Young Middle School PBIS-Tier 2 Jennifer Flury: External Coach-Baraboo School District.
Developing an Assessment Plan and Objectives for a Unit of Study “What Do you Really Want to Assess?”
PBL for the 21 st century. Getting Started Planning & Preparing Managing Reflect Perfect & Planning and Preparing Entry event Culminating products/rubrics.
Ontario Secondary School Literacy Test 2012 Information Session October 20, 2011.
Facilitated by Kristin Edlund Issaquah, 2015 Teaching with Performance Tasks.
Developing Questions That Matter
A love story. I know bare with me… Checklist  If your goal is to provide answers to the following questions, a checklist or scoring chart may be the.
Standards-Based Report Cards Glynn County Schools 1 st -3 rd Grades
Kindergarten 2016 Parent Workshop #1 How to help your child, Learning And Support, Best Start Assessment.
Testing methods that require students to create and answer or develop a product that demonstrates knowledge or skills.
PBL Instructional Design. PBL Instructional Design Name: Name of PBL: Grade Level: Content Area:
Agenda What is “learner-centered”? ~Think of Time Activity ~ Learner-Centered: In Our Own Words Effective Instructional Strategies for the Learner- Centered.
TCTC Waiver Day Feb. 27, When? Why? How? What makes a good assessment? Resources for types of assessments.
Retelling Fieldwork Assignment
PBL for the 21 st century. Begin with the end in mind Knowledge of science, history, literature, languages, etc. Time management Strong work ethic Respectful.
The Steps for a Successful Science Fair Project  Ms. McGlauflin: 5th Grade Science Teacher  5 th Grade Website: Check here.
STEM Fair Information Elementary School. What is STEM? Science Technology Engineering Mathematics.
KLA - ISLN Updates January Introducing the Content Specialists.
PARCC Workshop February 29, Welcome! Presenters Mr. Baskerville Joann Abbate Kristen Gati Kelly Nickels Schedule Opening Break Out Sessions Q&A.
Study Hall: Sit in assigned seats, working on something quietly. Get out your interactive notebook!
GALLATIN COUNTY MIDDLE SCHOOL ADVANCED ED. REPORT Team Leader: Karen Maxell 3.1 Team Captain: Michelle Cravens 3.2 Team Captain: Brandon Brockman 3.3 Team.
5th Grade Exhibition  A chance for students to show their skills and reflect on all that they have learned over the years as an IB student  A chance.
1.02 Lesson Summary and Assessment
Performance Assessment Development
School Library Services 21
Task 4 Mathematics Boot Camp Fall, 2016.
Math Management Binder ©
Inquiry in Science.
Exploring Assessment Options NC Teaching Standard 4
Multi-Tiered Systems of Support
Homework Check Everyone should have their homework out. Resource Managers grab answer keys for each member of your team. Team members should share and.
Presentation transcript:

Project-Based Learning October 30, 2009 Pioneer Middle School

Project-Based Learning Learning Goals: Students will: Analyze informationAnalyze information Collaborate with othersCollaborate with others Communicate their ideas using technologyCommunicate their ideas using technology

PBL Timeline Once every two weeks - meet by grade level December 11 – Unit Plan with project dates Unit templateUnit template – plate.doc plate.dochttp://pcsd.wikispaces.com/file/view/Unit_Plan_Tem plate.doc 21 st Century Skills (embedded in Unit Plan)21 st Century Skills (embedded in Unit Plan) – kills.pdf kills.pdfhttp://pcsd.wikispaces.com/file/view/21st_Century_S kills.pdf Letter home to parents describing project (need a template that all can use – volunteer?)Letter home to parents describing project (need a template that all can use – volunteer?)

Timeline continued January 8 – Project Timeline Timeline_Spreadsheet%281%29.xlshttp://pcsd.wikispaces.com/file/view/Project_ Timeline_Spreadsheet%281%29.xlshttp://pcsd.wikispaces.com/file/view/Project_ Timeline_Spreadsheet%281%29.xlshttp://pcsd.wikispaces.com/file/view/Project_ Timeline_Spreadsheet%281%29.xls Plan out the number of days not dates of the project. Administration will help coordinate and plan dates with all 4 grade level teams to minimize confusion.Plan out the number of days not dates of the project. Administration will help coordinate and plan dates with all 4 grade level teams to minimize confusion. Project Characteristics Checklist Characteristics_Checklist.dochttp://pcsd.wikispaces.com/file/view/Project_ Characteristics_Checklist.dochttp://pcsd.wikispaces.com/file/view/Project_ Characteristics_Checklist.dochttp://pcsd.wikispaces.com/file/view/Project_ Characteristics_Checklist.doc

Timeline continued February 5 - Checklists/Rubrics/Assessments Checklists: – – – Rubrics: – – – – – – –

Timeline continued May 27, 2010 Map project on Rubicon AtlasMap project on Rubicon Atlas Next Year – Adapt and modify project to better meet the learning needs of all students.

Exemplars Exemplar: a model or pattern to be copied or imitatedExemplar: a model or pattern to be copied or imitated Students must see what a “complete and correct” model is to know what is expected and acceptableStudents must see what a “complete and correct” model is to know what is expected and acceptable In order for the modeling to be successful, teachers need to plan the modeling experience carefully.In order for the modeling to be successful, teachers need to plan the modeling experience carefully. It’s important that the teacher know ahead of time what s/he wants students to know and do as a result of the modeling, so when students are set out to work on their own they know expectations and requirements. Specifying the desired behaviors before modeling them also makes assessment more constructive and accurate.It’s important that the teacher know ahead of time what s/he wants students to know and do as a result of the modeling, so when students are set out to work on their own they know expectations and requirements. Specifying the desired behaviors before modeling them also makes assessment more constructive and accurate.

Make it Happen in Your Classroom The following steps are important for good modeling: Make sure students have the appropriate background knowledge and prerequisite skills to perform the task.Make sure students have the appropriate background knowledge and prerequisite skills to perform the task. Break down the skill into small learnable segments. (checklists, multiple deadlines)Break down the skill into small learnable segments. (checklists, multiple deadlines) Provide visual, auditory, kinesthetic, and tactile ways to illustrate important pieces of the concept/skill.Provide visual, auditory, kinesthetic, and tactile ways to illustrate important pieces of the concept/skill. Check for student understanding along the way and re- model the steps that might be causing confusion.Check for student understanding along the way and re- model the steps that might be causing confusion. Allow many opportunities for students to ask questions and get clarification.Allow many opportunities for students to ask questions and get clarification.