30.5 2001Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

The Detector Control System – FERO related issues
The Control System for the ATLAS Pixel Detector
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
André Augustinus 16 September 2002 Safety issues.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
André Augustinus 16 September 2002 PVSS & Framework How to get started.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 9 October 2006 Interlocks update.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
SMI 7 May 2008B. Franek SMI++ Framework Knowledge Exchange seminar 1 SMI++ Object-Oriented Framework for Designing and Implementing Distributed Control.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
External Data and DIP Oliver Holme 18 th January 2008.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
ProtoDUNE SP DAQ assumptions, interfaces & constraints
The LHCb Run Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion

Summary DCS Workshop - L.Jirdén2 Aim of Workshop (1) u ALICE DCS project u is running since several years u been pending ~ one year u now being re-launched u Take a step backwards… … and review the basic issues u project definition and organization u status of Joint Controls Project (JCOP) u status of Detector Controls

Summary DCS Workshop - L.Jirdén3 Aim of Workshop (2) u But also to u re-establish contacts across ALICE controls community u re-launch discussions and exchange of information u learn to know each other and start a fruitful collaboration...

Summary DCS Workshop - L.Jirdén4

Summary DCS Workshop - L.Jirdén5 Proposed DCS project organization: GOALS u Ultimate goal “A working DCS ready for exploitation end 2005 allowing to control and operate the experiment during all modes of operation and according to defined requirements”. u Final assembly and commissioning “Individual DCS’s ready to be used during final assembly and commissioning end 2004”. u Intermediate goals u Milestones to be established in ALICE Controls Board.

Summary DCS Workshop - L.Jirdén6 ALICE Controls Coord. team (ACC) Joint Controls Project (JCOP) ALICE Controls Board (ACB) ALICE Techn. Coord. Techn. Board DAQ Trigger Offline LHC M. Detectors Ext. Services IT-CO group EP Management ATLAS Controls Coord. CMS Controls Coord. LHCb Controls Coord.

Summary DCS Workshop - L.Jirdén7 GLOBAL LAYOUT ITS hv lv p TT pixeldriftstrip TPCMUON safety access DAQ Trigger Offline LHC ECS DCS electricity magnet gas cooling Detectors Services

Summary DCS Workshop - L.Jirdén8 Project organization (1) u Responsibilities u ACC: co-ordinate the project execution u Detector groups Groups: design & implement their DCS u ACB: steering group, some executive power u Service groups: similar to detector groups u DAQ,Trigger, Offline, LHC machine: to be defined in common projects u IT Controls group: co-ordinate JCOP, support common tools u JCOP: provide common framework of tools and components

Summary DCS Workshop - L.Jirdén9 Project organization (2) u Deliverables u Prototype development u various ‘standard’ solutions, end-to-end slices u test cases with some detector groups u Manpower u ACC: 2.5 today 5-6 end 2001? u Initial steps

Summary DCS Workshop - L.Jirdén10 JCOP Presentation: Sub-Projects - I u SCADA Acquisition u Development of Supervisory Framework u Communications with CERN infrastructure services u Applications to Interface to CERN Infrastructure u Control of Gas Systems u Gamma Irradiation Facility (GIF) u Front-End Communications

Summary DCS Workshop - L.Jirdén11 Sub-Projects - II u Rack Control u Crate Control u Sub-detector Cooling and Ventilation u Control of High and Low Voltage u Vertical Slice u TTC (?)

Summary DCS Workshop - L.Jirdén12 Controls Technologies (LHC Era )

Summary DCS Workshop - L.Jirdén13 Detector presentations u points asked to be covered u Brief description of detectors u Review of control needs, systems, devices, etc. u Status today u Next steps u What do you expect from ACC team

Summary DCS Workshop - L.Jirdén14 Summary of answers (1) u Description of detector u Many detectors, different in size and complexity u Detector R&D not finished yet in several cases… u Review of control needs u inventory done in the past u global overview was presented - many ‘similar’ needs u systematic registration now to be done

Summary DCS Workshop - L.Jirdén15 Status today Status today

Summary DCS Workshop - L.Jirdén16 Next steps u Start evaluation of devices u LV and HV supplies, etc u Start prototyping u use of PVSS u Controls people to be found u Finish Detector R&D

Summary DCS Workshop - L.Jirdén17 What do you expect from ACC team (1) u Some comments: u To harmonize and make various detectors parts work together u To organize common ways to: u collect and record DCS data u what data; environmental data records, etc u Look at implications due to limited access to equipment, redundancy needs u Cover security issues, handling of alarms

Summary DCS Workshop - L.Jirdén18 What do you expect from ACC team (2) u Test-lab; when and what available u PVSS support, software drivers u Connections with external services u what to be handled via DAQ and via DCS u Beam-test systems u etc. u Proposed DCS organization generally accepted

Summary DCS Workshop - L.Jirdén19 Workshop Conclusion (1) u Proposed Project organization u Basic project outline accepted u Controls Coordination and Controls Board mandate has been defined - members nominated – after ok from TB ready to start working u JCOP u progressing according to program plan u PVSS II selection - major achievement u framework tools advancing well - 1st release May 2001 u feedback from the experiments important

Summary DCS Workshop - L.Jirdén20 Conclusion (2) u Detector groups u very good response ~ 35 participants u widespread progress u only a few have started evaluation and prototype work u devices in general not yet fixed but becoming urgent u general wish to use common ‘standards’ u welcomed the re-activation of ALICE controls u Aim of workshop u contacts established, discussions re-launched and we have learnt to know each other. u 1st milestone has been achieved