2011 Exhibition of School Planning and Architecture

Slides:



Advertisements
Similar presentations
Project Name Location Category of Entry Award Type Firm Name 2011 CEFPI North East Region Exhibition of School Planning and Architecture.
Advertisements

Monroe Elementary Everett, Washington Project of Distinction Award- New Construction Elementary School Dykeman, Inc. 2012Exhibition of School Planning.
TARVER ELEMENTARY SCHOOL Temple, Texas Elementary School New Construction Project SHW Group 2008 Exhibition of School Planning and Architecture.
Southwest High School Albuquerque, New Mexico High School Design Concept / Projects Under Construction Award Perkins+Will 2008 Exhibition of School Planning.
Austin, Texas 2013 CEFPI Southern Region Conference.
North Grove Elementary School Sycamore, Illinois New Construction Project of Distinction FGM Architects Inc Exhibition of School Planning and Architecture.
Druid Hills High School
2011 Exhibition of School Planning and Architecture
The University of Sacramento Design of New Campus Sacramento, California Design Concept Award Projects in the Design Phase Holabird & Root 2009 Exhibition.
Silver Crest Elementary School HERRIMAN, UTAH Project of Distinction – New Construction Elementary School VCBO Architecture 2010 Exhibition of School Planning.
Clark County School District Virtual High School and Vegas PBS Las Vegas, Nevada Project of Distinction New Construction JMA Architecture Studios 2010.
College of Southern Nevada Instructional Center – City of Las Vegas Fire Station Las Vegas, Nevada Project of Distinction New Construction JMA Architecture.
Rogers High School Spokane, Washington The Lee Brockway Award for Renovations High School NAC|Architecture 2010 Exhibition of School Planning and Architecture.
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
La Quinta High School Career Technical Education La Quinta, CA Projects in the Design Phase Design Concept Award Ruhnau Ruhnau Clarke 2010 Exhibition of.
Peachtree Charter Middle School Dunwoody, Georgia Project of Distinction – New Construction Middle/Junior High School Cooper Carry, Inc Exhibition.
Northeast Indiana Regional Public Safety Academy Fort Wayne, Indiana New Construction Project of Distinction SchenkelShultz Architecture 2008 Exhibition.
Bulverde Green Elementary School San Antonio, Texas Elementary School Design Concept Pfluger Associates Architects 2008 Exhibition of School Planning and.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture.
El Cerrito High School El Cerrito, CA New Construction Project of Distinction WLC Architects, Inc Exhibition of School Planning and Architecture.
Atrisco Heritage Academy Albuquerque, New Mexico High School Design Concept / Projects Under Construction Perkins+Will 2009 Exhibition of School Planning.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
Hillside Elementary School New Richmond, Wisconsin Elementary School Project of Distinction – New construction ATS&R Planners/Architects/Engineers 2009.
Troup Magnet Academy of Sciences New Haven, Connecticut Newman Architects LLC 2009 Exhibition of School Planning and Architecture.
Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning.
École secondaire catholique Jean-Robert-Gauthier - Phase II Ottawa, Ontario, Canada New Construction Project of Distinction Edward J. Cuhaci and Associates.
Osseo Adult Education Center Brooklyn Center, Minnesota Other: Adult Education Project of Distinction – New construction ATS&R Planners/Architects/Engineers.
Lansing Community College University Center Lansing, Michigan New Construction Project Project of Distinction SHW Group 2008 Exhibition of School Planning.
Little Cedars Elementary School Snohomish, Washington Elementary School Project of Distinction – New Construction NAC|Architecture 2008 Exhibition of School.
Westside Elementary School
Eastern Guilford High School Guilford County, NC New Construction Project of Distinction SFL+A Architects 2009 Exhibition of School Planning and Architecture.
Grant Community High School District 124 Fox Lake, Illinois High School Additions OWP/P | Cannon Design 2010 Exhibition of School Planning and Architecture.
Advanced Technology Center Blue Ridge Community College New Construction Project of Distinction Moseley Architects 2012 Exhibition of School Planning and.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Swiftwater Elementary Center Swiftwater, Pennsylvania Project of Distinction Elementary School Gilbert Architects Inc Exhibition of School Planning.
Marco Antonio Firebaugh High School Lynwood, California High School Project of Distinction - New Construction Projects LPA, Inc Exhibition of School.
West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.
Lawrence High School Lawrence, Massachusetts High School New Construction Project of Distinction Flansburgh Architects 2008 Exhibition of School Planning.
Groton-Dunstable Regional High School Groton, Massachusetts High School Project of Distinction Submission HMFH Architects, Inc Exhibition of School.
New High School 2013 Waldorf, MD Project in the Design Phase Design Concept Award SHW Group LLP 2010 Exhibition of School Planning and Architecture.
Roosevelt and Jackson Elementary Schools
Malibu High School/Middle School Modernization and Reconstruction Malibu, CA Design Concept Award HMC Architects 2008 Exhibition of School Planning and.
2009 Exhibition of School Planning and Architecture
Fabyan Elementary School
DePauw University Judson and Joyce Green Center for the Performing Arts Greencastle, Indiana New Construction Project of Distinction Institutions of Higher.
Samuel Brighouse Elementary School
Quincy High School Quincy, Massachusetts Design Concept Award High School Symmes, Maini & McKee Associates 2010 Exhibition of School Planning and Architecture.
2009 CEFPI Exhibition of School Planning and Architecture Mountain Green Elementary School Mountain Green, Utah Project of Distinction Elementary School.
Columbus Signature Academy New Tech Campus – Phase 1 Columbus, Indiana Lee J. Brockway Award Renovations High School CSO Architects 2009 Exhibition of.
Catherine Kolnaski Elementary School
Atrisco Heritage Academy Albuquerque, New Mexico High School Project of Distinction – new construction Perkins+Will 2010 Exhibition of School Planning.
Eastgate Elementary School Bellevue, Washington Elementary School Design Concept Awards – Projects in the Design Phase NAC|Architecture 2008 Exhibition.
Bothell High School Phase I - III Bothell, WA Project of Distinction – New Construction DYKEMAN Architects 2010 Exhibition of School Planning and Architecture.
Bow Lake Elementary School SeaTac, Washington Elementary School New Construction BLRB Architects, p.s Exhibition of School Planning and Architecture.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
don r. roberts elementary school
Blue Springs High School Blue Springs, MO Project in the Design Phase Design Concept Award Hollis + Miller Architects 2009 Exhibition of School Planning.
CHURCH HILL MIDDLE SCHOOL New Braunfels, Texas Middle School Lighthouse Award SHW Group 2008 Exhibition of School Planning and Architecture.
Glacier High School Kalispell, Montana High School Project of Distinction (New) CTA Architects Engineers 2008 Exhibition of School Planning and Architecture.
Issaquah High School Issaquah, Washington High School Design Concept Award Mahlum Architects 2008 Exhibition of School Planning and Architecture.
2017 Exhibition of School Planning and Architecture
2008 Exhibition of School Planning and Architecture
Silver Lake Regional High School
Glacier View Junior High
Location Category of Entry Award Type
2016 Exhibition of School Planning and Architecture
2019 Exhibition of School Planning and Architecture
2011 Exhibition of School Planning and Architecture
Presentation transcript:

2011 Exhibition of School Planning and Architecture L.B. Landry High School New Orleans, Louisiana High School Project of Distinction Eskew+Dumez+Ripple

L.B. Landry High School Photography by Timothy Hursley

L.B. Landry High School Main Site Diagram

Community Environment: L.B. Landry School has been significant in the history of the West Bank community for seventy years, and the new facility is designed to promote cultural connectivity. The siteplan recalls patterns of the old school, centered around a courtyard containing a large remnant magnolia. The design de-institutionalizes the school by using the building perimeter, rather than fencing, for security and opening the courtyard to provide communal greenspace. The clinic, library, gym and auditorium are configured for after-hours use separate from school operations. In response to the climate, the building is "hardened“ against severe weather events and designed to function as a place of disaster refuge.

Community Outreach Planning supports communal use of facilities - clinic, library, gym, auditorium, and adult learning Siteplan contributes greenspace and promotes community connectivity Facility is designed to act as a place of disaster refuge

Learning Environment: The planning of the school establishes an academy system - comprehensive groupings of classrooms, labs and support spaces. The core learning spaces are configured "horizontally", one academic house per grade, including classrooms and science labs. Complementing these are "vertical" mixed-age houses in faculty-selected specialty areas: construction technology (carpentry, welding, masonry, electrical and plumbing labs); fine arts (2D and 3D media and scene building studios), performing arts (band, choir, drama, dance and recording studios) and professional careers (CAD, health sciences, and business labs).

“Main Street” An open, multi-level commons area designed to promote student interaction connects the core academic wings at the second and third levels. At the first level, “main street” connects the cafeteria and library to the courtyard. A monumental stair connects the first level to a large gathering space at the second level, which functions as a lobby for the auditorium and gymnasium.

Physical Environment: Environmental sustainability was a primary goal from the onset, and LEED Silver certification is anticipated. The exterior skin is composed of storm-resistant materials - masonry, insulated metal panels, impact-resistant glazing - that also contribute to energy efficiency. Locally-sourced interior materials such as terrazzo flooring and glazed masonry units were selected for durability, low emissions and high recycled content. Partitions and mechanical equipment respond to best practices for speech recognition and acoustics in learning spaces. Daylighting is employed significantly in classrooms and common areas. As part of the sustainable strategies employed on the project, stormwater management design includes rainwater harvesting using underground cisterns to store water for irrigation use.

Physical Environment: … A monumental stair leads students to a large gathering space at the second level, from which classroom wings are accessed. This space also serves as a break out area for the auditorium and gymnasium and is animated by an overhead “ribbon” of inspirational quotes, lit by a clerestory skylight above the perforated metal ceiling.

Planning Process: This post-Katrina project was commissioned by the Louisiana Recovery School District as part of the "Quick-Start" construction program to accelerate the replacement of five storm-damaged schools within an aggressive timeline - six months for programming, design and construction documents and twenty months for bidding, permitting and construction. The planning process featured an intensive series of workshops led by the A/E team involving stakeholder representatives from the critical fields of education, administration, maintenance, security, technology, health and counseling, nutrition, athletics, cultural arts, environmental sustainability, and disaster preparedness. This culminated in a community presentation of the design four weeks after the kickoff.

Floor plan

Floor plan

Floor plan

Exhibition of School Planning and Architecture 2010 Project Data Submitting Firm : Eskew+Dumez+Ripple Project Role Architect of Record Project Contact Steve Dumez, FAIA Title Design Director Address 365 Canal Street, Suite 3150 City, State or Province, Country New Orleans, LA U.S. Phone 504-561-8686 Associate Firm: SHW Group LLP Project Role Provided Program Development, Interior Planning & Design Consulting Services Project Contact Mark Lam Title Project Manager Address 20 East Greenway Plaza, Suite 200 City, State or Province, Country Houston, TX U.S. Phone 713-877-0900 Other Firm: CSRS, Inc. Project Role Program Manager Project Contact Walter Aertker Title Project Manager Address 909 Poydras Street, Suite 1200 City, State or Province, Country New Orleans, LA 70112 Phone 504-592-0150 Construction Firm: Satterfield and Pontikes Construction Project Role General Contractor Project Contact Derek Murphy Title Project Manager Address 2400 Veterans Memorial Blvd City, State or Province, Country Kenner, LA U.S. Phone 504-620-3660

Exhibition of School Planning and Architecture 2010 Project Details Project Name  L.B. Landry High School City New Orleans  State Louisiana  District Name Recovery School District  Supt/President  Paul Vallas, Superintendent Occupancy Date August 2010  Grades Housed 9th-12th     Capacity (Students)  950 Site Size (acres)  4.03 Gross Area (sq. ft.)  236,000 Per Occupant (pupil)  248.4 square feet gross/net please indicate Design and Build?  No If yes, Total Cost: Includes: If no, Site Development:  $3,100,000 Building Construction:  $51,700,000 Fixed Equipment:  (equipment & furnishings included in construction cost) Other: Total:  $54,800,000

L.B. Landry High School

L.B. Landry High School

L.B. Landry High School The design promotes connection between inside and outside with expansive windows. Exterior glazing is protected by means of a variety of shading devices where necessary for light and solar control.

L.B. Landry High School