HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013.

Slides:



Advertisements
Similar presentations
D. Cheng Sept 23, 2013 Instrumentation Trace Material Selection.
Advertisements

May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
CM20 Meeting April 9, 2013 D.R. Dietderich, LBNL1 Insulation Status for QXF Cables D.R. Dietderich, LBNL LARP-CERN Collaboration meeting April 9, 2013.
Proposal for HQ Coil 27 Miao Yu, Steve Krave. What to do with the coil Laser sintering end parts with accordion slits Plasma coating these end parts Demonstrate.
Electric Circuit A path on which electrons move continuously is called an electric circuit.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
HQ Coil 18 Test Impregnation LARP Video Meeting November 21, 2013 Dan Cheng.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
Electrical Wiring Three-Way Switches. Three-Way Switch.
Ph.No.: / E- Mail: Electrical and Thermal Insulation Tapes Offered by Tape-Rite.
1 QXF heater proposal M. Marchevsky, H. Felice, T. Salmi, D. Cheng, G. Sabbi, LBNL.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
1 QXF heater design: current status and the path forward M. Marchevsky (LBNL) 03/06/2014 D.W. Cheng, H. Felice, G. Sabbi (LBNL), G. Ambrosio (FNAL)
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
Design optimization of the protection heaters for the LARP high-field Nb 3 Sn quadrupoles M. Marchevsky, D. W. Cheng, H. Felice, G. Sabbi, Lawrence Berkeley.
1 QXF heater parameters G. Chlachidze, M. Marchevsky March 13, 2014.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
QXF instrumentation trace development
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
Dan Cheng Mar 6, 2014 QXF Instrumentation Trace Fabrication Update.
Dan Cheng 6/11/2015 QXF coil measurements plan at LBNL.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
D. Cheng Feb 11, 2014 QXF Instrumentation Trace Update.
1 Quench Protection Workshop - 04/29/2014 QXF heater design M. Marchevsky, D.W. Cheng (LBNL) E. Todesco (CERN) T. Salmi (Tampere UT) G. Chalchidze, G.
Electric Circuit A continuous pathway that can carry an electric current: The lights in your home are on an electric circuit.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
Spacing of Cu clamp = 10” Clamp plate width = 2.5”, thickness = 0.375” Thickness of conductor insulation = 0.03” Thickness of coil ground wrap = 0.03”
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)
LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
 Nonmetallic sheathed cable: copper or aluminum wire covered with paper, rubber, or vinyl for insulation  Armored cable: flexible metal sheath with.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
1 MQXF(S) Magnet Interface Document MQXF(S) magnet interface document will describe electrical connection between the magnet and the header assembly Scope.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
Heaters for the QXF magnets: designs and testing and QC M. Marchevsky (LBNL)
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
Possible QXF v2 Fabrics E.F. Holik, Steve Krave, Miao Yu, Lucas Zimmerman QXF coil WG meeting 8/19/2015.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
Phone: / Teflon™ Electrical Tapes.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Stator Plan & Schedule Chris Booth 2nd March 2009
Superconductng cable for CBM magnet
HQ Coil 19 Test Impregnation
DESIGN FINDINGS FOR THE CONSOLIDATION OF THE DIODE BUS BAR INSULATION
Voltage tap layout and quench antenna options for the long QXF magnet
Characterization Update
Presentation transcript:

HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013

(LBNL) HQ-Style Splice Insulation.001” adhesive backed Kapton tape to cover Red (A2/B2) Vtap wire.001” adhesive backed Kapton tape to close box.005” thick Kapton “box” August 22, 2013 D.W. Cheng - Coil WG Meeting2

HQ Coil 23 Splices August 22, 2013 D.W. Cheng - Coil WG Meeting3

HQ Coil 23 Splices August 22, 2013 D.W. Cheng - Coil WG Meeting4

HQ Coil 23 Splices August 22, 2013 D.W. Cheng - Coil WG Meeting5

HQ Coil 23 Splices August 22, 2013 D.W. Cheng - Coil WG Meeting6

HQ Coil 23 Splices August 22, 2013 D.W. Cheng - Coil WG Meeting7

HQ Coil 23 Splices August 22, 2013 D.W. Cheng - Coil WG Meeting8 Occasionally we fill a gap with G10 to protect the Vtap

HQ Coil 23 Splices August 22, 2013 D.W. Cheng - Coil WG Meeting9

HQ Coil 23 Splices August 22, 2013 D.W. Cheng - Coil WG Meeting10