Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.

Slides:



Advertisements
Similar presentations
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Advertisements

The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Preparing for the Rainy Season SFWMD Operations & Actions.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
® Cumberland River Basin 2007 Hydrologic & Hydraulic Drought Joy Broach – Aquatic Biologist Planning Branch - Environmental Section SWPBA Tennessee November.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
US Army Corps of Engineers BUILDING STRONG ® Skiatook Lake Drought Issues and Management.
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Management Group Water Supply Planning.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Drought and the Central Valley Project August 2014.
Colorado River Overview February Colorado River Overview Hydrology and Current Drought Management Objectives Law of the River Collaborative Efforts.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
NRCS Watershed Rehabilitation
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
Water Conservation, Reuse & Storage Grant Program Application Review Team Meeting November 7, 2013.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
US Army Corps of Engineers BUILDING STRONG ® Savannah River Basin Drought Workshop October 24-25, 2012.
Jason King, P.E. State Engineer WSWC/NARF Symposium on the Settlement of Indian Reserved Water Right Claims August 25-27, 2015 Pyramid Lake Paiute Tribe’s.
Planning and Community Development Department Housing Element City Council February 03, 2014.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Advisory Committee on Water Information Streamgaging Task Force Charge: Determine the streamflow information needs of the Nation, identify the optimal.
Water Supply at Beaver Lake, Arkansas Little Rock District US Army Corps of Engineers ® One Corps Serving The Army and the Nation.
Modeling Development CRFS—Technical Meeting November 14, 2012.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
US Army Corps of Engineers BUILDING STRONG ® Understanding Sedimentation and Land Use Cover Relationships in the Lake Sidney Lanier Watershed Russell A.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
WATER RESOURCES ORSANCO Technical Committee October 9-10, 2012.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Water Quality Certification for hydropower licensing in Wisconsin.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Department of Public Works Submittal of Comments to the County of Los Angeles on the Draft Environmental Impact Report and Proposed Alternatives for the.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Reclamation and Hoover Dam It’s All About The Water.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
3 Old Dominion University Lake Gaston Project Field Trip November 1, 2014 Thomas M. Leahy, P.E. Director of Public Utilities.
Wyoming Association of Rural Water Systems Harry LaBonde Jr, P.E. Director Wyoming Water Development Office April 19, 2016.
Water Resource Management Planning Update
Department of Environmental Quality
Albeni Falls Dam Operations
Water Resource Management Planning Update
Summary of Chesdin Reservoir Reliability
October 29, 2018 Terry Lauritsen, P.E.
Presentation transcript:

Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.

Uncontrolled Area controlled by Youghiogheny Lake 434 square miles

Youghiogheny River Watershed Drainage areas Total Basin = 1,764 square miles Total Basin = 1,764 square miles Youghiogheny River Lake = 434 square miles Youghiogheny River Lake = 434 square miles Controls 25% of total basin Controls 25% of total basin Connellsville = 1,326 square miles Connellsville = 1,326 square miles Percent controlled = 33% Percent controlled = 33%

Youghiogheny River Lake In 1936, was authorized for the purposes of: Reducing flood stages (flood control) and Low water regulation for water quality control along the Youghiogheny, lower Monongahela, and upper Ohio Rivers

Youghiogheny River Lake Storage Schedule Full Pool Summer Pool Minimum Pool Pool Elevation J F M A M J J A S O N D Months Winter Pool

After Youghiogheny dam was placed in operation, Congress granted general authority to all Corps reservoirs for the following limited purposes: Recreation Fish and wildlife conservation Threatened & endangered species preservation However, no storage was allocated or reallocated to these purposes Youghiogheny River Lake

In 1988, downstream (whitewater rafting) and upstream recreation was added as an authorized project purpose. No storage was allocated or reallocated to this purpose. “… operated in such manner as will protect and enhance recreation associated with such project” and to the extent that recreation is compatible with other project purposes.

Youghiogheny River Lake In 1989, commercial hydropower was added to the facility. The hydropower that is currently being generated, however, does not require any change from the previous operational procedures, and as a result is not a project purpose.

Yough River Lake Water Management & Reallocation Study Chronology A severe drought occurred during the year. For the first time, the MAWC exceeded the 20-MGD for 30-days average withdrawal rate criteria of their PADEP water supply permit at their Connellsville plant. Per this permit, the MAWC is required to identify an upstream water source for withdrawals between 28 MGD and 42 MGD. The MAWC requests assistance from Congress to secure the federal portion of funding for the USACE to complete a water management and storage reallocation study for Youghiogheny River Lake.

Yough River Lake Water Management & Reallocation Study Chronology An Initial Assessment (IA) phase of the study (100% federally funded) was completed by the USACE. The conclusion of the IA was that the potential exists to reallocate a small portion of Youghiogheny River Lake storage to water supply. The Reconnaissance phase of the study (100% federally funded) was completed by the USACE. The study defined a possible alternative, a public interest, and a cost sharing partner (MAWC) for the detailed Feasibility phase

Yough River Lake Water Management & Reallocation Study Chronology The Feasibility phase of the study (50-50 cost shared) is conducted by the USACE and the MAWC, including full public involvement.

Key Study Authorities Section 216 of Public Law Under this section the Corps can review the operation of Youghiogheny River Lake and report to Congress with recommendations on the advisability ot making a modification in the overall public interest. Public Law This law requires that any change to a water control plan, regardless of purpose, must be developed with full public involvement. National Environmental Policy Act (NEPA) of 1969 This act addresses environmental impacts as interpreted by 40 CFR (CFR is Code of Federal Regulations)

Purpose of Study: Determine if we can accommodate a request for an additional 25 cfs (17MGD) from MAWC Determine if we can accommodate a request for an additional 25 cfs (17MGD) from MAWC Determine if we can improve the current operating schedule at Youghiogheny River lake Determine if we can improve the current operating schedule at Youghiogheny River lake Evaluate impacts of proposed changes Evaluate impacts of proposed changes

Youghiogheny River Lake MAWC needs an additional 25 cfs (17mgd) to meet the their future projected water supply needs. Corps is willing to change how water is released during average to wet years to better meet the current needs of the Corps stakeholders.

How Much Water Are We Talking About? Average flow rate at Connellsville ( ): = 2,620 cubic feet per second (cfs) = 4,061 million gallons per day (MGD) Average stage at the Connellsville gage = 3.87 feet (‘)

How Much Water Are We Talking About? MAWC water withdrawal 20 MGD = 31 cfs 28 MGD = 44 cfs 44 MGD = 69 cfs

What Happens at Connellsville? Q 7-10 (Current)= 460 cfs Q 7-10 (Proposed)= 490 cfs

Current MAWC Withdrawal at Connellsville Under Average Flow Conditions Average Flow 2,620 cfs MAWC Withdrawal 2 % Water continuing downstream 98 %

Proposed MAWC Full Withdrawal at Connellsville Under Average Flow Conditions Average Flow 2,620 cfs MAWC Withdrawal 3 % Water continuing downstream 97 %

Contribution of Youghiogheny River Lake to Flow at Connellsville under Low Flow Conditions Total Flow 460 cfs Natural flow 100 cfs Flow from storage 360 cfs

Current MAWC Withdrawal at Connellsville Under Low Flow Conditions Low Flow 460 cfs MAWC Withdrawal 10% Water Continuing Downstream 90% (415 cfs)

Proposed MAWC Withdrawal at Connellsville Under Low Flow Conditions Low Flow 490 cfs MAWC Withdrawal 14% Water Continuing downstream 86% (420 cfs)

1997 Reconnaissance Study Looked at 1991 (extremely dry year) and 1992 (wet year)Looked at 1991 (extremely dry year) and 1992 (wet year) Two alternatives:Two alternatives: #1 - meets MAWC water supply request only#1 - meets MAWC water supply request only #2 - meets MAWC water supply request and reduces lake drawdowns during average and wet years#2 - meets MAWC water supply request and reduces lake drawdowns during average and wet years

Current Feasibility Study Looked at the entire period of recordLooked at the entire period of record Refined alternative #1 = Alternative #5Refined alternative #1 = Alternative #5 Refined alternative #2 = Alternative #6Refined alternative #2 = Alternative #6 Included public inputIncluded public input

What Does the Reallocation of Storage Mean? Minimum Pool Summer Pool Currently, Youghiogheny River Lake has 146,760 acre-feet of water for low flow regulation for water quality enhancement. This volume exists between the summer pool elevation of feet and the minimum pool elevation of feet. Reallocating is re-defining the use for this water to water quality “and” water supply. Water for Low flow regulation

How Much Water Will Be Reallocated For Water Supply? Minimum Pool Summer Pool Full Pool Flood Control (summer)= 39% to 39% Water Quality (summer)= 59% to 55% Water Supply= 0% to 4% Inactive (Below Minimum Pool)= 2% to 2% Current to Proposed

Why Doesn’t the Corps Raise the Lake? Summer Pool Space Available for Flood Control Full Pool Encroachment into this space decreases the lake’s capability to store flood waters. The space above Summer Pool is for Flood Control. To maintain the same Flood Control Space and amount of Low Water Regulation, the dam would have to be raised. This study did not change the project’s Flood Control capability.

Reallocation of Storage Current Release Schedule 1997 Recon. Study Alternative # Feas. Study Alternative # Uncontrolled Flow

What Is the Impact to the Youghiogheny River at Connellsville During Periods of Low Water? Sample Cross Section at Connellsville 460 cfs = 1.89 ft (Current) 490 cfs = 1.93 ft (Proposed) Difference =.04 foot = 0.5 inch

“Water Quantity” Summary The proposed release schedule change (Alternative #6). Provides the projected water supply needs. Provides reduced lake drawdowns during average and wet years. Provides a slightly more stable river.

Water Quality Impacts Slight Change in Water Temperature Benefits from Increased Base Flows CONCLUSION: No Significant Impacts

What Was Done in the Feasibility Study? Evaluated various alternatives to provide quantity needed Evaluated various alternatives to provide quantity needed Evaluated alternatives to determine potential impacts Evaluated alternatives to determine potential impacts Solicited input from other agencies, local interest groups, and the general public during past meetings, via mail, etc. Solicited input from other agencies, local interest groups, and the general public during past meetings, via mail, etc.

List of Stakeholder Meetings June 3, 1999 Study Initiation (Public) Meeting Connellsville Municipal Building Outlined Feasibility Study Plan Informed Stakeholders Identified Steering Committee members July 13, 1999 Briefing for Fayette Forward Environmental Action Committee Fayette Forward Conference Room Uniontown, PA

List of Stakeholder Meetings December 3, 1999 First Steering Committee (Public) Meeting PSU, Fayette Campus – Uniontown, PA Presented water quantity analysis Solicited stakeholder feedback Solicited public input to identify potential environmental impacts Beginning of water quality analysis phase

List of Stakeholder Meetings January 31, 2000 Briefing for Youghiogheny River Outfitters Federal Building – Pittsburgh, PA June 5, 2000 Meeting with Pennsylvania Fish and Boat Commission (PAFBC) Federal Building – Pittsburgh, PA Presented draft of water quality findings

List of Stakeholder Meetings June 23, 2000 Briefing for Youghiogheny River Council Fireman’s Park – Sutersville, PA September 7, 2000 Meeting with technical sub-committee of the Steering Committee Federal Building – Pittsburgh, PA Reviewed water quantity analysis Presented water quality findings Solicited feedback

List of Stakeholder Meetings February 7, 2001 Public and Steering Committee Meeting - Connellsville, PA Reviewed water quantity analysis Reviewed water quality findings Began NEPA Compliance Solicited feedback

Most Recent Activity Draft feasibility report and environmental assessment was completed in November Public review period December 2002 – January Completed Feasibility Report and associated NEPA requirements completed and signed by the District Commander in October Prepared and negotiated a water supply agreement between the MAWC and the US government

What’s Next ? Submit documents through our chain for approval Approve the implementation of the Feasibility Study recommendation (including the execution of the water supply agreement). Implement sometime in 2004.

Lessons learned Keep it simple – A huge challenge for technical people. Keep it simple – A huge challenge for technical people. Be careful with the words that you use Be careful with the words that you use (MGD vs CFS, Q 7-10) Don’t under-estimate the damage caused by those who use the public forum for posturing. Don’t under-estimate the damage caused by those who use the public forum for posturing.