Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.

Slides:



Advertisements
Similar presentations
A 10 GeV, 4 MW, FFAG, Proton Driver at 50 Hz G H Rees, RAL.
Advertisements

CEPC BoosterDesign CEPC Booster Design FCC Week 2015, March, 2015 Marriot Georgetown Hotel Huiping Geng Presented for Chuang Zhang.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
20-50 GeV Muon Storage Rings C. Johnstone and G. Rees MuTAC Meeting Fermilab March 16, 2006.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
FFAG Concepts and Studies David Neuffer Fermilab.
Neutrino Factory,  ± Decay Rings C Johnstone, FNAL, F Meot, CEA, & G H Rees, RAL.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
Neutrino Factory International Scoping Study Machine Group Chris Prior RAL/ASTeC and University of Oxford.
A 3 Pass, Dog-bone Cooling Channel G H Rees, ASTeC, RAL.
HF2014 Workshop, Beijing, China October 9 th -12 th, 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Neutrino Factory,  ± Decay Rings C Johnstone, FNAL, F Meot, CNRS, & G H Rees, RAL.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
First Thoughts on IDS G H Rees, RAL. Topics 1.Two-way, μ ± injection chicane for the dog-bone RLA. 2.Injection energy & efficiency for a first dog-bone.
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
Cold versus Warm, parameters impacting LC reliability and efficiency contribution to the discussion on risk factors Giorgio Bellettini, Seul ITRP meeting,
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
New Gantry Idea for H + /C 6+ Therapy G H Rees, ASTeC, RAL 4 th September, 2008.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
4 MW, 50 Hz, 10 GeV, 1 ns (rms), FFAG Proton Driver Study G H Rees, RAL.
Synchronization Issues in MEIC Andrew Hutton, Slava Derbenev and Yuhong Zhang MEIC Ion Complex Design Mini-Workshop Jan. 27 & 28, 2011.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
3 GeV, 1.2 MW, RCS Booster and 10 GeV, 4.0 MW, NFFAG Proton Driver G H Rees, ASTeC, RAL.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
ISS Muon Bunch Structure Convenors: S Berg, BNL, and G H Rees, RAL.
Lecture17(Course Summary).PPT - E. Wilson - 3/3/ Slide 1 COURSE SUMMARY A Design Study of a Compressor ring for A Neutrino Factory MT 2009 E. J.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
, UKNF Meetin, Imperial College J. Pasternak Status and Recent Progress in the Muon FFAG Designs J. Pasternak, Imperial College, London / RAL.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Large Booster and Collider Ring
Isochronous, FFAG Rings with Insertions for Rapid Muon or Electron Acceleration G H Rees, RAL.
1- Short pulse neutron source
Meson Production Efficiencies
Design Study of the CEPC Booster
LHC (SSC) Byung Yunn CASA.
ILC 3.2 km DR design based on FODO lattice (DMC3)
Collider Ring Optics & Related Issues
ILC 3.2 km DR design based on FODO lattice (DMC3)
A Design Study of a Compressor ring for
Negative Momentum Compaction lattice options for PS2
Kicker and RF systems for Damping Rings
Negative Momentum Compaction lattice options for PS2
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL

Current Storage Ring Designs Ring(s) T(GeV) Beam Detcs P.dr(Hz,N,MW) Circ(m) Eff(%) US2a(2) 20  ,  ─ 1 3, 5, (31) J-Parc(1) 20   , 8, (?) Keil (1T) 50   2 50, 140, x28 (?) Racetrack detector Triangle detector detector

Features of Designs 1. Tilting of the rings relative to the horizontal plane. 2. Very different proton drivers (24, 50 and 2.2 GeV). 3. Muon injection fillings in each storage cycle (n= 1). 4. Merging of the   and  ─ beams in one of designs. 5. Long straights reduced if weak dipoles are added. 6. RF systems needed to retain bunch structures. 7. High reactive beam loading of the RF cavities. 8. Muon beam powers large ( ≈ 0.25 and 1.25 MW).

Muon Storage Ring Issues 1. Design for 20 or for 50 GeV rings, or for both? 2. Design Triangle & 2 detectors, or Racetrack &1? 3. Possibility of an Isosceles Triangle design? 4. Merging of   and  ─ beams in straights or not? 5. Cooling of warm bore of S/C magnets & straights. 6. S/C magnet shielding, and the effects of e  & e ─. 7. Protection from muon beam loss on the walls. 8. Influence of n and length of the muon bunch train. 9. Designs for lattice, RF, injection, diagnostics, etc. 10. Optimisation of the ring designs.

Beam Power Levels Proton driver (50 Hz?): 4 MW (with potential of 8 MW) 8-20 GeV Muon ring: ≈ 1 MW (combined   and  ─ ) 20 GeV Storage rings: ≈ 0.5 MW (separate   and  ─ ) GeV Muon ring: ≈ 2.5 MW (combined   and  ─ ) 50 GeV Storage rings: ≈ 1.25 MW (separate   and  ─ ) Peak beam loading at the fundamental ring RF frequency: 8-20 GeV,16-turn, ring: ≈ 50 MW (50 Hz, n = 5, C = 900 m) (1 bunch train at a time) ≈ 1000 MW (25 Hz, n = 1, C = 450 m) Storage rings: n (   or  ─ ) bunch trains injected per cycle. Reactive loading of cavities (402 MHz?) scales as 1/(2CF).

Effect of Length of Muon Bunch Train CERN design: proton and muon bunch number = 140 length of muon bunch train ≈ 900 m US bunch rotation scheme: muon bunch number = 90 length of n bunch trains ≈ n x 180 m Here, n is the number of bunches in the proton driver; length for five bunch trains ≈ 900 m A 4 MW driver with 1 ns rms bunches needs n > ≈ 4 So, minimum length for muon storage rings ≈ 900 m (short length of US2a is for a 20 GeV, 1 MW driver)

Storage Ring Filling Repetition rate is that of the muon rings (50 Hz?) The number of muon fillings per pulse = n (> 4?) Interval between each of the “n” fillings ≈ 50  s (holding time in the proton driver (target shock) & acceleration time in 16 turn, 8-20 GeV, muon ring) Injection of   and  ─ beams into separate rings (to prevent extension of the bunch train length) Rise and fall time for injection kickers ≈ 150 ns Multiple (x n) pulsing of kickers at ≈ 50  s intervals

Lattice Design for the Arcs Allow 0.4 m for the ends of the S/C magnet cryostats. Allow 1.4 m ( m) in between arc magnets. Minimize arc length by using combined function units. Adopt a FODO type for the lattice cell (BF O BD O). Choose 6 T fields for the central orbits ( ≈ 5 to 7 T). Circumference of 50 GeV rings of similar efficiencies: Racetrack ≈ 0.9 km, ∆ ≈ 1.5 km, Isosceles ∆ ≈ 1 km. cf 0.36/0.8 km (20GeV, 1MW), 2.1 km (50GeV, 4MW)

Lattice Design for the Straights Use weak dipoles (1.8°) at ends of production region. Match with the (1.8°) dipoles to have zero dispersion and a reduced variation of β in the production region. Length of the production region(s) is ≈ 230 to 360 m. RF, loss protection & cooling easier if separate rings. Best to inject the   and  ─ beams into separate rings. Circumference larger & efficiency less if rings merge. So, avoid merging the rings at the straight sections?

Possibility of Isosceles Triangle Design Production straight (1.8° end dipoles) Production straight (1.8° end dipoles) Straight for loss protection, RF, Q-control and 1.8° end dipoles 97° arc of 10 cells (97 x 1.6)° arc of 16,  =72° cells, (ξ correction over groups of 5 cells) Injection

Beam Loss Protection Losses are from  ± decay,  ± and e ± interception and synchrotron radiation on outer wall of magnet bores. About ⅓ of the  ± beam power appears in e ± beams. Power loss in the arcs will be approximately uniform, but the density may be high in regions of the straights. Effect of high energy e ± at inner walls of the magnets? Loss protection proposed at downstream end of non- production straight to limit  ± interceptions in the arcs. Primary and secondary collectors over three cells, to contain direct  ± losses (up to approx ½ % level).

Cooling and Shielding Cooling is needed for average power losses of: ≈ 420 kW per ring for the 50 GeV   &  ─ rings, ≈ 170 kW per ring for the 20 GeV   &  ─ rings. Average loss in 0.9km racetrack: 467,189 W/m. Design for 5 x these levels after weak dipoles. Design for 2 kW/m for the beam loss collectors. Shielding is needed for S/C magnets in the arcs High density material, eg tungsten, is proposed.

Plans (prior to feedback from talk)  Liaise with proton driver & muon ring designs  Liaise with detector group on ring orientations  Design 20 and GeV  ± racetrack rings  Design 20 and GeV  ± triangular rings  Study possibility of an isosceles triangle ring  Study e ± effects, ring shielding and cooling  Study injection, loss protection & tunnel safety  Study chromaticity correction and RF issues  Optimise and provide parameters for costing