Alok Roy. UHV/EHV Level HV/MV Level LV Level The Concept of a power grid.

Slides:



Advertisements
Similar presentations
Demand Side Management: Concept, Need and scenario in West Bengal Saroj Sarkar Engineer (Retd.) WBSEDCL 1.
Advertisements

Peter Chung (ID: pwc140030) Class: EMS in Software Engineering Course: Advanced Requirements Engineering (CS/SE 6361), Fall 2014.
Sistan & Balouchestan Electric Power Distribution Company
CHALLENGES IN DEVELOPMENT OF INDIAN POWER SYSTEM Mr. V. Ramakrishna Member (Power System), CEA.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Generation Peak Demand : 132 GW Growth Rate: 9 – 10 % (per annum) India - Present Power Scenario Total Installed Capacity – GW (As on )
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
© ABB Group August 7, 2015 | Slide 1 Variable Shunt Reactors Optimize Transmission Systems Dr. Claes Bengtsson, Global Product Manager, Reactors. PowerGen.
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
(Associate Professor)
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
Presentation on Over view of Indian Transmission Grid
Year 2006 Report “Better” Managed and Controlled Transmission Grids using Advanced Technological Concepts Aty Edris EPRI Power Delivery & Markets
1 TECHNOLOGICAL CONSIDERATION ON ENERGY COOPERATION OF N-E ASIA OCTOBER, 18, 2002 SUNWOO, HYUN-BUM.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Transmission System in India
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 Electrical Energy Transmission by High-voltage Direct Current (HVDC) and Prospects for an Electrical Market Mohamed Lakhdar HABIB and Rime BOUAROUDJ.
HARVEST GROUP Smart Grid Harvest Power Technologies 30 th Aug 2014.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
DEVELOPMENT OF SOUTH ASIAN GRID. WHY SOUTH ASIAN GRID ? Optimal Utilization of Natural Resources Opportunity of Energy Trading Economy of Scale Advantage.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
W E L C O M E Power Grid Corporation of India Limited.
Sanjay Garg General Manager PGCIL/ Ministry of Power
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
RELATIONSHIP BETWEEN COMPETATIVE POWER MARKETS AND GRID RELIABILITY PJM RTO EXPERIANCE vis – a – vis PRACTICES FOLLOWED IN INDIAN GRIDS.
W E L C O M E Power Grid Corporation of India Limited.
Evolution of Indian Power Grid Phenomenal expansion since Independence  Generation : 1349 MW 101,866 MW (in 1947) (in 2001)  Grid : Local grid – at.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Presentation on Capacity Addition targets for X th Plan MINISTRY OF POWER 2 nd May 2002.
Overall National Grid Development: Constraints & Options
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
1 CLASS technical Andrew Howard. 2 Back to school for a moment… This fundamental relationship is at the heart of CLASS But how will it change over time.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
INSTITUTE OF POWER ENGINEERING GDAŃSK DIVISION Some Results of the Study „ Integration Possibilities of Wind Energy with the Polish.
Introduction to Electric Power System and A. C. Supply
SIMULATION AND IMPLEMENTATION OF FC-TCR
REGIONAL GRIDS IN INDIA – QUICK FACTS
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
Economic Operation of Power Systems
Reactive Power and Voltage Control
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Mid-Continent Area Power Pool
POWER GRID INTERCONNECTIONS IN CHINA
HVDC Transmission Systems:
Presentation transcript:

Alok Roy

UHV/EHV Level HV/MV Level LV Level The Concept of a power grid

Evolution of IndianPower Grid Evolution of Indian Power Grid Phenomenal expansion since Independence  Generation : 1349 MW 101,866 MW (in 1947) (in 2001)  Grid : Local grid – at the time of Independence. State Grids – emerged in 1960s. Regional Grids – in 1970s. Five Regional Grids – Northern, Western, Southern, Eastern & North-eastern National Grid – under progress.

Power Scenario – at a Glance Existing Installed capacity - 101,866 MW Coal – 71%  Hydro – 25 Nuclear & others – 4% Peak demand  Peak power - 78,000 MW  Energy (average) MU/day Availability  Peak power - 68,000 MW  Energy (average) MU/day Shortage  Peak power - 10,000 MW (12.8%)  Energy MU/day (7.7%)

OPERATION OF LARGE INTERCONNECTED SYSTEM W.R.T. INDIAN CONTEXT OPERATION OF LARGE INTERCONNECTED SYSTEM W.R.T. INDIAN CONTEXT Indian Power System is ‘Large’ geographically and very wide-spread in terms of generation and load locations Various electrical regions characteristically different w.r.t. the generation mix, system size, load factors, grid parameters etc.

Evolution from state level entities to the present regional system still has inadequacies in true sense of ‘power system’ Almost ‘Stiff’ power system elements (e.g. most Indian generators) do not rise to occasion at the time of parameter variation or contingency. In absence of higher order control (in terms of hierarchy) such as the AGC and near-absence of parameter based local variations in our control techniques, technical solution can not be ensured presently for steady-state operation. Dynamic and transient modes shall continue to be vulnerable areas.

BIGGER CHALLENGE TO SYSTEM OPERATORS compared to that for operators of perfect or near-perfect power system in developed countries WHAT NEXT? COMMERCIAL MECHANISM IS THE ONLY ANSWER Result ??

REACTIVE POWER CONTROLB.1 REACTIVE POWER CONTROL LOW VOLTAGE Accountability of Load Power factor missing at present Severe inadequacy in compensation at the point of drawal No or low redundancy in transmission and sub- transmission levels Overloading of distribution circuits in part or full Lumping of capacitive compensation, sometimes at higher voltages rather than at distribution levels ‘Mental block’ of generation engineers to generate MVAR upto rated value of machines

Movement of reactive power over long distances - physically and electrically Low voltages, sometimes severe, even on EHV sub-stations, more accentuated when coupled with low grid frequency Fall-out: Low output and in-efficient working of voltage sensitive equipment including certain generating station auxiliaries, high system losses, tripping of healthy transmission lines on distance-relay load encroachment at times, burning of certain equipment due to over- current etc.

Capability Curve of a typical 210 MW BHEL Generator

Capability Curve of a typical 500 MW BHEL Generator

REACTIVE POWER CONTROLB 2. REACTIVE POWER CONTROL (Contd......) HIGH VOLTAGE: Though not encountered as frequently and as severely as Low Voltage cases/spreads in the country, but are caused mainly due to Underloaded system/sub-system elements Non-switched capacitors/banks resulting in lumped surplus MVAR in case of load drop Even bigger ‘Mental Block’ of generation engineers to absorb MVAR upto machine rating, usually ‘stiff’ AVR for cross-over to left. Non-provision of certain switched/non-switched shunt reactors on EHV/UHV lines or bus reactors

High Voltages in the affected pockets, sometimes even at EHV/UHV Levels, more accentuated when coupled with high frequency conditions in the grid. Fall-out:Tripping of overvoltages-sensitive elements including trunk EHV/UHV Lines, dielectric failures/accelerated ageing of equipment, avoidable power loss, common failure of heating elements etc.

Power Scenario – at a Glance All figs. are in MW RegionPeakInstalled Peak DemandCapacity Surplus/Deficit Northern21,00027, ,100 Western25,00030,800- 4,500 Southern20,40024,800- 2,600 Eastern 7,80015, ,000 North-eastern 950 1, Limited exchange of power between Regions --- Main reasons: –Inadequate interconnectors, especially from Eastern Region –Lack of proper Commercial and administrative mechanisms

Demand-Availability Scenario – by Assumptions: Demand – as per 16 th Electric Power Survey Report (EPS). Capacity addition – as per information available from MoP & CEA. Generation availability (average) – 75%. All figs. are in MW Region Demand Installed Availability Deficit/ Capacity Surplus Northern Western Southern Eastern+ North-east

Power Transfer Envisaged from ER and NER by 2012

Back

NeedforNationalGrid Need for National Grid Uneven disposition of energy resources  Major Hydro resources in NER & NR  Coal reserves mostly in Bihar/Orissa/West Bengal  Cost of power transmission (1.11 cents/kwh) lower than cost of fuel transportation (3.33 cents/kwh). Some Regions are no longer Self-sufficient  Major resources in SR exhausted  In NR, mainly hydro resources having long gestation period Unbalanced Growth of different Regions  Some regions are surplus and some are deficit. Optimisation of generation capacity addition  Utilising time diversity  Spinning reserve optimisation

Development of National Grid – Major Considerations Development in a phased manner – commensurate with generation/ load growth Conservation of Right-of-Way - especially in areas with scarcity of ROW ---- viz. area near hydro, chicken-neck area, forest area, town etc.  In forest area with rich flora & fauna, construction of line with high towers ---- no forest cutting required. Minimisation of transmission cost - immediate as well as long-term basis. Flexible enough to accommodate change in load- generation pattern.

Plan for National Grid PHASE-I (By 2002):  Interconnection through HVDC Back-to-Back links- P North – West: 500MW Vindhyachal Back-to-Back Under P West – South: 1000MW Chandrapur Back-to-Back Opera- P East – South: 500MW Gazuwaka Back-to-Back tion P East – North: 500MW Sasaram Back-to-Back – expected by (AC line of this project in operation transferring 350 MW in radial mode) With the completion of Sasaram HVDC Back-to-back link, framework of National Grid would be completed.

Plan for National Grid PHASE-II (By 2007): High capacity “Transmission highways” envisaged alongwith major generation projects- East-South  2000 MW HVDC bipole between Talcher-Kolar  Augmentation of Gazuwaka HVDC back-to-back by 500MW East – North  High capacity 400 kV link from Tala to Delhi  2500 MW HVDC bipole between Hirma – Jaipur East – West  400kV AC link between Rourkela and Raipur –2003  400kV AC link between Hirma and Raipur & Sipat MAP

Plan for National Grid PHASE-III (By 2012): Establishment of a ring of 765kV lines traversing across Northern, Western and Eastern Regions Construction of various sections of Ring progressively along with major generation projects viz. Barh, Kahalgaon, North Karanpura etc. Strengthening of East-South interconnection through another 2500MW bipole MAP

National Grid: Cost-benefit analysis Cost  Investment required  Rs. 23,000 crores Benefits  Reduction in capacity addition requirement by about MW--- hence saving on investment of Rs. 55,000 crore. (due to peak time diversity and saving in spinning reserve)  Transmission highway would enable setting up of large pit head stations having lower cost of energy  Savings on account of this - Rs crores per annum.  In addition, Nation’s investment towards fuel transportation infrastructure could be avoided.  Better overall hydro-thermal mix  Very low for ER and WR ( ER – 15 : 85, WR - 17 : 83 ) – affecting grid operation  With National Grid, it would become 33 : 67 on all India basis..