Implanting a Computer Control System in Accelerators Oded Heber Department of Particle Physics Weizmann Institute of Science 76100, Rehovot ISRAEL May.

Slides:



Advertisements
Similar presentations
DAQMASTER Features and Benefits
Advertisements

P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Supervisory Control & Data Acquisition DAQ Networking.
Gelu M. Nita NJIT. Noise Diode Control Day/Night Attn. Ctrl. Solar Burst Attn. Ctrl. V/H RF Power Out Attn. Ctrl. Temperature Sensors.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
SCADA SYSTEM CLASSIFICATION
Open-source SCADA systems Denis Ulybyshev SCADA Open Source Solutions By Denis Ulybyshev.
ADAM-4572 Ethernet To Modbus Solution Ethernet to Modbus Data Gateway
Introduction to wind parks SCADA systems
Building an Application Server for Home Network based on Android Platform Yi-hsien Liao Supervised by : Dr. Chao-huang Wei Department of Electrical Engineering.
UW Clinical Neutron Therapy Program. CNTS Engineering Staff Dave Reid Rob Emery Ruedi Risler James Kuan Eric Dorman Stefani.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
LabView Users Group Meeting June 20 th, 2006 Process Control Using Compact Field Point/Labview Real-time Michael Tockstein Microelectronics Technology.
Ethernet Data Gateway EDG Enables Information Boundary-less Over Ethernet.
Hall C’s HMS PLC Controls by Steven Lassiter. What Constituents a PLC System PLC (processors) Programming. I/O modules. Field Device Signals (sometimes.
SCADA and Telemetry Presented By:.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
Single Board Computers and Industrial PC Hardware at the CLS
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
Distributed Control System Group D Louay Sirwi Abdallah Jafar Dr. H. Shabaik SE – 401.
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
1 Introduction of COACK to the HIBP Control NIFS - National Institute for Fusion Science H. Ogawa, T.Inoue, Q.Tsukada, M.Yokota, M.Kojima, J.Kodaira, H.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Topics of presentation
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Marketing Department Industrial Automation Business Headquarters Yokogawa Electric Corporation ISD-MASP-S05043 Copyright © Yokogawa Electric Corporation.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
ADAM-4000 Modbus I/O Market Focus Mark Lin eAutomation Div. PSM Industrial Automation Group
Prepared: March 2000 / PANORAMA System Architecture for SC ELECTRIC.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
ICALEPCS 2007 The Evolution of the Elettra Control System The evolution of the Elettra Control Sytem C. Scafuri, L. Pivetta.
Connecting LabVIEW to EPICS network
Computing at SSRL: Experimental User Support Timothy M. McPhillips Stanford Synchrotron Radiation Laboratory.
60kW Thermosiphon control system
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
TS workshop 2004U. Epting, M.C. Morodo Testa - TS department1 Improving Industrial Process Control Systems Security Uwe Epting (TS/CSE) Maria Carmen Morodo.
Top 10 Differentiators.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Accelerator control at iThemba LABS
Presented by Li Gang Accelerator Control Group
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
Brief Introduction to ELBE
CV PVSS project architecture
ATF/ATF2 Control System
LabVIEW EPICS Client I/O Server
How SCADA Systems Work?.
Project Members: M.Premraj ( ) G.Rakesh ( ) J.Rameshwaran ( )
DarkSide-50 Distributed Control System Towards DarkSide-20k
by Prasad Mane (05IT6012) School of Information Technology
Programmable Logic Controllers (PLCs) An Overview.
Measurement & Automation Explorer
EPICS: Experimental Physics and Industrial Control System
Presentation transcript:

Implanting a Computer Control System in Accelerators Oded Heber Department of Particle Physics Weizmann Institute of Science 76100, Rehovot ISRAEL May 30, 2006 Bucharest, ROMANIA

OUTLINE General Introduction to Weizmann Institute Introduction to Accelerators Computer Control Systems Upgrading and new system concepts 1.New System (in new accelerator) 2.Upgrading an existing system 3.Installing new system in an old accelerator The WI Pelletron system and other labs. Summary

Weizmann – Facts and Figures Established on people 250 research groups 1000 MSc, PhD students and postdocs 850 scientific support staff 80 buildings on 1.2 sq. km. Budget (2005): about $185 Million/year (32% by the government).

Nature 430, (15 July 2004) 25% of the country Science is done at WI

Yeda – WI technology transfer company Yeda became a world leader in Technology Transfer Tens of products from Weizmann on the market. Total annual royalty-generating sales in 2004: $6,000,000,000. Over 40 new companies where established around Yeda’s technologies (some already public), 18 in the last 5 years.

What is a computer control system for accelerator ? The ability to control and maintain a full process using computers: Industrial - manufacture floor, fab Civil, Public – traffic control, electricity Scientific oriented facility – accelerators, nuclear reactor

Definition: SCADA Acronym for supervisory control and data acquisition, a computer system for gathering and analyzing real time data Sensors – I/O points PLC and I/O cards server clients Field bus Control bus Communication bus hardware

SCADA Software Control of many ( ) I/O points Continues communication with many busses (RS485, GPIB, Ethernet, modbus…) and PLCs (usually OPC server). Data logging – data bases Security Process control (PID) Alarms Graphical interface Flexibility Connectivity to nonstandard and scientific instruments

What is special in SCADA for accelerators (for basic science) ? Research facility – flexible Many nonstandard and prototype equipments Timing - synchronization (bunching, coincidence) Physicist proof system

Computer Control Accelerator Hardware (Software) Trends Home made instruments Off the shelf instruments Home made controller CAMAC - VME Industrial PLC “large” computers PDP, IBM Mini computers VAX Personal computers Fortran, Assembler EPICS Industrial scada

Example Case 1: a system for new accelerator SARAF 40 MeV super conductor LINAC at Soreq NRC ISRAEL Accelerator purchased from Accel GmbH, Bergisch-Gladbach, Germany

SARAF Main Control System (MCS) – General Architecture User ClientsSoreq ClientsDevelopment Clients Client Network Ethernet Radiation Safety System (RSS) S7-F Cryogenics S7 Building and General Safety S7 Applications FP, VME Server for: Backup, Data Logging Beam Lines S7, FP Operator Clients I/O Network Ethernet Servers located in Server Room Clients located in MCR and throughout facility and Soreq Servers for: Accelerator, Beam Lines, RSS, Cryogenics, Building, Applications Accelerator S7, FP, PXI Servers and Client computers running LabVIEW + DSC + OPC

Main Control System (MCS) Choose Commercial Software –Established companies –Widely used software in control applications –No need to write custom drivers Choose Commercial Hardware –Hardware incorporating OPC standard –Companies that produce both hardware and software Minimize types of Hardware and Software –Optimize with sub-contractor constrains –Settle for several types if inter-communication possible Realization Guidelines (1)

Choose Server-Client architecture Improves reliability May provide redundancy Consider backup server with a smooth automatic transition in case of main server crash Client crash should not affect server or other clients Computers and Hardware on one network Use Fiber Optics in EM-noisy environments Main Control System (MCS) Realization Guidelines (2)

SoftwareSoftware - LabVIEW with DSC module and OPC server LabVIEW is flexible and scientific oriented Client licenses are not so expensive and do not depend on number of I/O channels HardwareHardware – FieldPoint, PXI from NI and S7, S7-F from Siemens All types are chosen due to sub-contractor constraints All types are OPC compatible S7-F compatible with international safety standards Network and BusesNetwork and Buses – Ethernet Realization Decisions Main Control System (MCS)

A Possible LabVIEW DSC Main Screen Main selection Functional panel Main panel Alarm panel Sub selection

Case 2: Upgrading existing CC system Change I/O points ? Change PLCs ? (CAMAC to Industrial) Change software or upgrading (experience) Change computers ?(VAX to PC) Change OS ? (VMS, Unix to Linux, Windows) Money? Shutdown time?

Case 3 : Installing a system for the first time Example: 14UD Pelletron ( and VDG) Goal: All the controls and indicators should be integrated in the CC system. Changing accelerator parameters (different masses different energies) in a minute time scale with high stability (AMS requirements).

constrains Money Manpower Continue normal operation + maintenance Controls in high voltages high pressure environment (14 MV terminal, 120kV source, SF 6 gas).

solution Bottom up philosophy - first select the I/O point R/W solution. Connect first the points that are already at the old control room, afterwards the “easy points” and the most important ones. Select Hardware that are most common used in electrostatic accelerators and easy to expand.

Group3 Control Features Fiber Optics - high voltage isolation – noise immunity. Small Size - easy mounting - keep wiring short to minimize noise pickup. High Resolution - 16 bit analogs High Update Rate - scan rates of up to 32,000 channels per second High channel Density - several thousand channels per computer slot Diagnostic Port - on device interfaces for system development and debugging.

5 loops 1000 I/O GPIB, RS232 DAQ 1 loop 100 I/O 1 loop 200 I/O RS232 DAQ 19 PLC’s RS485

Software and OS LabVIEW by NI (start at version 3.1) Computer PC + windows (start with WIN 3.11 on one 486 machine) Few Upgrades to LabVIEW DSC (7.0 and 8.0 – full SCADA) 15 P-IV computers in server client architecture.

Laser room Ion sources Source control Linear trap Bent trap control room

SUMMARY Computer control system is a crucial part for any accelerator. SCADA selection depends on many constraints such as money, manpower, laboratory expertise and third party constructors. The trend is to use industrial hardware, PC computers and commercial SCADA software.