1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
ACE Diversity Interchange (ADI)
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Public Service Company of New Mexico
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Montana Energy Summit Transmission Planning Process April 22, 2008.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Presentation to WECC Market Interface Committee March 24, 2015
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Debra Lew NREL WestConnect Planning Meeting Western Wind and Solar Integration Study Update.
1 Integration of Variable Generation into the Grid: Need for TVLs (Transfer Variability Limits) Gordon Dobson-Mack (Chair) Dynamic Transfer Capability.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
1 The Northwest Wind Integration Action Plan Status Update December 14, 2010.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
1 Joint Initiative Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010 WECC VGS--REC Impacts Work Team Update Paul F Arnold—VP ColumbiaGrid.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Generation Adequacy Task Force Update to WMS November 18, 2009.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
Northwest Wind Integration Action Plan Jeff King Northwest Power & Conservation Council June 27, 2007.
Demand Forecast Deviations Working Group Presented to: Stakeholder Advisory Committee Presented by: Pat Doran January 24, 2007.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
Energy Imbalance Market (EIM) Dan Dettmer Board Meeting February 16, 2011.
Dynamic Transfer Limits Study WIST Update 12/17/09 Brian Tuck, BPA.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Dan Beckstead Associate Staff Engineer TEPPC 2026 Common Case Load.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
Study Plan Development & Approach May 5, 2010 Conference Call & Webinar “To ensure efficient, effective, coordinated use & expansion of the members’
Visibility Ramu Ramanathan 10/1/2007.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
ColumbiaGrid Summary of: COI Utilization Report dated May 4, 2011
Overview of Northwest Wind Integration Action Plan
MIT tour of the California ISO Control Center March 31, 2015
PCM (Production Cost Model) Data Work Group Webinar
PCM (Production Cost Model) Data Work Group Webinar
Presentation transcript:

1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich Bayless - NTTG

2 Assignments from the Northwest Wind Integration Forum’s Wind Integration Action Plan –Assignment 1 –Assignment 1 – Determination of Dynamic Transfer Limits (DTLs) on NW Flowgates: Along with the Joint Initiative for sub-hourly scheduling, NWIF asked that CG & NTTG jointly assess technical impacts & cost effectiveness of increasing dynamic scheduling capabilities across –Key NW Balancing Authority interfaces, –Northern & Southern Interties –Internal BPA Flowgates –Assignment 2 –Assignment 2 – Evaluate development of Remote versus Local wind: NTAC (subsequently CG & NTTG) should propose a methodology to assess developing wind on a more broad geographic basis versus close in –Identify full delivered costs including the costs of balancing & transmission –Assignment 3 –Assignment 3 – Transmission Planning Methodology for Variable Generation CG & NTTG should develop & apply a Variable Resource Transmission Planning Methodology for the Northwest WIST is a technical committee facilitated by CG & NTTG –Open to all interested parties –Monthly meetings, –Volunteered labor and time –Large & varied participation –Kick off meeting March 5, 2009 –Liaison with WECC VGS WIST Assignments

3 Assignment 1 – Dynamic Schedule Limits Staged analysis plan –Initiated from PowerEx Northern Intertie Study - method and results –Study Plan Schedule to align with Joint Initiative DSS implementation schedule DTLs for key flowgates still on track Coordination with DSS operating protocols BPA performing analysis, –BPA developing the method and analysis automation –Study Team review of methods, assumptions, overall results –Review and analysis of specific BA flowgate results by involved transmission owners PSE, NWE, BCTC, PowerEx, IPC Initial DTLs Conservative –To meet timeline Unknown territory –Goal to increase DTLs down the road Test and modify assumptions, refine methodology Determine, implement system fixes DSL Coordination with other Western Interconnection areas WestConnect, WECC VGS CaISO Dynamic Transfer initiative

4 Dynamic Schedule Limit Analysis Paths/Flowgates under study: California-Oregon Intertie (COI) Northern Intertie West of Garrison NW-to-Idaho (LaGrande) West of Cascades – North West of Cascades - South North of Hanford North of John Day South of Allston West of McNary West of Slatt Voltage Support Equip Response

5 Preliminary Conclusions - DTLs COI 4800 MW Example (preliminary) –Calculated Variability Limit = 531 MW –If used for Dynamic Transfers then ATC = 4800 – 531 MW = 4261 MW for other scheduled transfers North Of Hanford Example (preliminary) (Calc Variability Limit) – (Historical Use) – (Reliability Margin) –DTL = (Calc Variability Limit) – (Historical Use) – (Reliability Margin) –DTL = 500 MW – 200 MW – 100 MW = 200 MW Outages or other system conditions could reduce the DTL, as real-time reliability concerns demand

6 Assignment 2 - Remote Versus Local Wind Development –Collection & comparison of wind characteristics for NW various wind zones ColumbiaGrid, BPA, IPC provided analysis using NREL and BPA data Energy and Capacity Factors –Diversity & correlation with loads Regulation and Load Following Characteristics –Ramp rates, frequency, magnitude –Identification of technical & operational issues Energy and capacity Regulation requirements & costs Transmission operating effects and Costs –Assessment of models & methods to calculate full delivered costs IPC simplified model Production Cost Models, Plexos, Promod, PNNL Projects WECC TEPPC & Garrison Pumped Storage Study, TransCanada Compressed Air Energy Storage GE NREL West Connect Study WREZ model & studies

7 IPC Model & Analysis July Load vs Wind Wind MW Load MW January Load vs Wind 12 month analysis showed: For 1000 MW load addition served by 1000 MW wind additions, 970 MW of fast responding additional generation would be needed (4x greater than historic reg requirements) to meet LOLP and reliability requirements NREL 10 min wind data IPC Load shape -Diverse Wind generation: 1/3 Gorge, 1/3 Wyo, 1/3 Mont

8 WREZ Model & LBNL Analysis

9 Prelim Conclusions – Remote vs Local Diversity does exist between NW wind areas –Eastern NW wind has better capacity factors –Wind capacity not well correlated with coastal loads –Within hour Ramp frequency and magnitudes are similar in all areas Regulation and balancing requirements similar Resource expansion solely by wind to meet new load growth will likely require substantial new supplemental energy resources. Preliminary indications are that Local Wind development is more economical than Remote generation even with remote storage. Extremely dependent on: Transmission cost is a big factor Location, cost, and other uses of transmission Supplemental fuel prices Renewable policies, Tax Credits, other subsidies & requirements

10 Going Forward –WIST to continue to develop DTL limits to meet DSS Schedule - Summer/Fall 2010, and continue other DTL activities –Change WIST Assignment Two on Remote versus Local Generation Further analysis on Assignment 2 (Remote vs Local) requires additional resources –Modeling tools and studies –Additional volunteering of staff resources and $$. Other Similar Studies Underway –BPA, WREZ, National Labs, and WECC VGS –DOE grants for Remote versus Local and Regulation Requirements studies WIST functions well as an open review forum –WIST should change to become an Open Stakeholder Technical Review Forum to review and critique ongoing technical studies regarding renewables effecting the NW. Relationship to other NW Work Groups –Assignment 3 - Will be deferred until after results from Assignments 1 & 2 –Recommendations or direction from the NWIF SC?