CMS Tracker Week, CERN, 26-29 April 2005 27 Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.

Slides:



Advertisements
Similar presentations
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
Advertisements

CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
CMS Tracker Week, CERN, July July 2003Tracker Week - Bonding WGSalvatore Costa - Catania Bonding-DB Usage or lack thereof.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
1 JD.Berst, U. Goerlach, CMS TRK APR 2003 Status of Hybrid Qualification and Tender Final Technical Specifications –Hybrid types –Quality control, intermediate.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
22 Jan 2002Tracker Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
A Look at DCU Temperature Data August 4, 2008 Ryan Kelley Matthew LeBourgeois.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Status report of test procedures for the readout pixel chips in Catania F.Riggi ITS Meeting, June 2002.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Status Report on Bonding at Catania
Bonding web site, renovated
Hybrid & Module Testing Status
UCSB Testing Status Anthony Affolder
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
Vienna Module Production
Module Production Status in Florence
CMS Perugia Modules Production Review
Module production in Italy
TEC Module Production Overview
Bari production centre resp. M. de Palma
CMS Perugia Gantry Status Report
L.Fiore Gantry Meeting during the CMS TK week
FNAL Hybrid Testing Status
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Salvatore Costa Università di Catania and INFN – Sezione di Catania

27 Apr 2005CMS TrackerWeek - Module Production2 Salvatore Costa - Catania Outline 1.Global info on production bonding of the Modules 2.Global review of Module bonding quality indicators 3.Open issues 4.Selected highlights from individual Center reports

CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Global review of Module bonding quality that is, Module Pull Test results

27 Apr 2005CMS TrackerWeek - Module Production4 Salvatore Costa - Catania # Modules Pull Tested

27 Apr 2005CMS TrackerWeek - Module Production5 Salvatore Costa - Catania Mean pull forces

27 Apr 2005CMS TrackerWeek - Module Production6 Salvatore Costa - Catania Mean pull forces

27 Apr 2005CMS TrackerWeek - Module Production7 Salvatore Costa - Catania StDev/Mean of pull forces

27 Apr 2005CMS TrackerWeek - Module Production8 Salvatore Costa - Catania StDev/Mean of pull forces

CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Open issues

27 Apr 2005CMS TrackerWeek - Module Production10 Salvatore Costa - Catania Hybrid-related issues 1.Bonding problems on PA encountered while bonding APV’s to PA in some TIB hybrids [mentioned by Alan/Gabriella]  Display additional warning in Pre-bonding section of DB Interface Faulty hybrids, with intermittent FHIT errors, erroneously sent to CERN from HAS, then to Gantry Centers and some already built into modules. [mentioned by Gabriella]  All Gantry and Bonding/Testing Centers alerted  I plan to generate from DB and distribute affected Module list

27 Apr 2005CMS TrackerWeek - Module Production11 Salvatore Costa - Catania ModProd DB Browser Tool At Gian Mario’s request, non-prod quality objects (modules, sensors, hybrids) now excluded:

27 Apr 2005CMS TrackerWeek - Module Production12 Salvatore Costa - Catania Jigs for TEC Module bonding TEC Center Module Types to bond (# Mod) Who made jigs (# jigs) Backup center for this Ring’s Modules Who makes additional jigs (# jigs) AachenR6Aachen (1)R3,R5p,R5sAachen (2) HamburgR1p,R1s, R3Hamburg (2/2/2)R7 Hamburg (2) Told Didier they can make jigs for other centers KarlsruheR5p,R5R3in preparation StrasbourgR7Strasbourg (1)R6Karlsruhe (1) ViennaR2p,R2sVienna (1)Not decided yet Can make R2 jigs for other centers ZurichR4 (1100)Karl./Zurich (2)R6, R7? Karl./Zurich (1+1) Has R7 jig on loan from Strasbourg We are continuing to monitor the preparation of attidional jigs for Center backup in TEC. This is a table already showed at last Meeting, but with updates added yesterday.

CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Selected highlights from individual Center Reports

27 Apr 2005CMS TrackerWeek - Module Production14 Salvatore Costa - Catania Catania: new facilities New bonding machine: Delvotec 6400 (100 kHz) –Since March 8 th –Oldest of 2 Hughes dismissed –Now in clean room: Delvotec, newest of 2 Hughes –Bonding times down: TIB34: 8’ 10” vs. 45’ + x TIB12: 12’ 15” vs. 65’ + x Backs: 15” vs. 1’ + x –Reliability improved: Machine failure rate: negligible Bonding failures: negligible PHL- (DEAD) channels: none so far –Experience: 45 modules bonded w/ new machine Programs for all module types ready: TIB34, TIB12, TIB12sl, TIB12sr (back/front/pulltest/after_pulltest) –Usable bonding parameters window narrower than in Hughes –Best Pull forces achieved: ~10g New operators –2 nd operator fully trained since last meeting already. –3 rd operator: Russian engineer with temporary contract.

27 Apr 2005CMS TrackerWeek - Module Production15 Salvatore Costa - Catania Catania’s Delvotec 6400

27 Apr 2005CMS TrackerWeek - Module Production16 Salvatore Costa - Catania Other Center’s highlights FNAL: Last 2 weeks found problems related to excessive flex of PA ends. Had to ask assemblers to move glue points. This helped but not yet satisfactory. Firenze: In some latest TIB modules dirty area of PA near end (but not at end) made bond difficult there. Padova: Uploaded pull test data after shipping modules to Pisa  usual DB problem: pull test appears performed in Pisa  recommendation: upload all of your data before shipping modules to another center Torino: Due to share with Alice had to change Delvotec’s U/S frequency from 100 to 60 kHz. New parameters. Similar performance. Vienna: Bonded 25 modules with new Delvotec 6400 (140 kHz). Pull forces were marginally better than 100kHz. Observes whiskers on 2 nd bond (on PA). Zurich: Machines now equipped with additional USB camera (+ PC) to ease the strain of looking all the time through microscope during bonding. Model details available.