Kanban/Pull System As Part of the Continuous Improvement Process at Whirlpool Corporation - Findlay.

Slides:



Advertisements
Similar presentations
Introducing, Launching QSEC: Innovative Statewide Educational Initiative In Quality Systems Quality Systems Education Collaboration Dr. John W. Sinn, Professor.
Advertisements

Quality Management Training Quality circles Bench Mark Kaizen.
Team Phase II Short Form - Fall 2004 Phase II Short Form “Statistical Process Control, Six Sigma, Improvement for Lean Systems" Assessment of the.
QS 702 Summer 2004 Clark Halfrey, Larry Roman, Mark Chandler, Jim Bossert, Glenn Gee, Timothy Chow, Roger Newhouse, & Garret Kaess.
Team Swirly Presents Whirlpool’s Dishwasher Rack’s Clips and Coating: Maintaining Quality Though ISO9000 and Six Sigma.
NAIT 2001: Integrated Manufacturing Systems 1 Ernest B. Ezell,Jr., Associate Professor and John W. Sinn, Professor Bowling Green State University College.
Phase II Short Form Pencil Slat Cost Reduction Initiative Industrial Technologists' Toolkit For Technical Management QS 327 Team 2: Scott Sowders, Pam.
Supplier Development Kaizen Implementation Kit
Six Sigma Green Belt: Overview Robert Setaputra. What is Six Sigma? Six Sigma is the relentless and rigorous pursuit of the reduction of variation in.
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved June 26, 2002 BEYOND SIX SIGMA: A HOLISTIC.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Assessment Overview: Orientation Tutorial Presentation 4 1. Explanation of this presentation,
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment,
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
QS 726 – Quality Systems Organization and Implementation of a New Quality System using LSSQTT Fall 2006 Phase II.
Lean Six Sigma: A Vision
Lean Six Sigma A Methodology for Cultural Change and Continuous Process Improvement (CPI)
Lean Six Sigma Executive Introduction. Copyright OpenSourceSixSigma.com Competition Every morning in Africa, a gazelle wakes up; it knows it must run.
Overview of Lean Six Sigma
Quality Improvement Systematic approach to reduction or elimination of waste, work-back flow, rework, and losses in production process.
ITTTM Short Form Tool 1 Tool 1 Short Form “Technical Foundations For Industry And technology” Topics 1. Background on the toolkit 2. Kaizen defined and.
How to Effectively Implement Set-up Reduction in Any Organization.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Introduction, Process, Communication Overview 1.ITTTM Toolkits, CD courseware context.
QS 702 Phase II: Encouraging the Integration of Technology Into Higher Education.
Short Form Tool 13 ITTTM Tool #13 Short Form “Statistical Foundations For Data-based Improvement, Lean, Six Sigma Solutions” Topics 1. Focus and benefits.
Team 2 Portfolio Review Qs 327 Fall 2004 Dr. John Sinn.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Driving and Sustaining Quality & Innovation in Manufacturing Processes Thursday, January 19, 20121Quality Presentation - EFY.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
TQM TECHNIQUES BENCHMARKING Target key areas for improvement within operations – Increase productivity, competitiveness, and quality – Quality results.
Welcome to Lean Six Sigma Green Belt Training
Quality Control Concepts. Outline 1.Introduction 2.Quality Control 3.Quality Assurance 4.Total Quality Management 5.Quality Tools 6.Summary.
Program Participants: This program is designed for the managers, engineers and professionals working in the service / transactional environment, who want.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Content Overview: Orientation Tutorial Presentation 2 1. Explanation of the presentation,
Phase I & II Short Form Presented to : Dr. John Sinn Prepared by: Team One – QS 327 Due: October 19, 2005.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
1. Problem Statement 2. Problem Objective 3. Primary Metric 4. ‘BACK STOP’ Metric Six Sigma Foundations Continuous Improvement Training
Philips Salvage Team 627 Industrial Productivity Analysis Fall 2002.
Quality Systems Education Partnership (QSEP). Overview of QSEP – What is it? EEducational partnership LLocal company & Bowling Green State University.
Quality Management.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Introduction, Overview: Orientation Tutorial Presentation 1 1. Explanation of this presentation,
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
TECHIES Team #2 Phase II Toolkits: 9, 10, 11, 13, 14, 15 Tech 302 Dr. John W. Sinn.
1 Lecture #1: PD - Ch 1. Introduction Ref: Product Design and Development by Karl T. Ulrich and Steven D. Eppinger, McGRAW-Hill
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Process Overview: Orientation Tutorial Presentation 3 1. Explanation of this presentation,
Niblock & Associates, LLC ©2010 Niblock & Associates, LLC Christian M. Paulsen 1.
Chapter 27 The Engineering Design Process. Learning Objectives Describe the various factors that are changing the design process Discuss the steps in.
Short Form Tool 19 ITTTM Tool #19 Short Form “Kaizen Documentation Foundations For Data Driven Process Variation, Waste Reduction, Lean, Six Sigma” Topics.
Phase II QS 627/727 Documentation-based Process Improvement.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Kenneth J. Andrews EMP Final Exam  Closed book – no ‘cheat sheets’ or other reference material  Translation devices are OK  Duration will.
10 TOTAL PRODUCTIVE MAINTENANCE (TPM) Zulfa Fitri Ikatrinasari, Dr.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Lean Manufacturing Series
Kaizen Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka
Enterprise Improvement LEAN Initiative Presentation
Quality Management Six Sigma
6 Six Sigma Basics GEOP 4316.
Measure Phase Wrap Up and Action Items
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Kanban/Pull System As Part of the Continuous Improvement Process at Whirlpool Corporation - Findlay

Bowling Green State University College of Technology QS 327 Process and Productivity Documentation Fall Semester, 2002 Dr. John W. Sinn Team 327 Phase II - Short From Presentation

Overview n Toolkits Phase I Phase II n Toolkits Initial n Team Members n Initial Team n Team Goals/Expectations n Team Communications n Team Growth

Team Members

Initial Team n Only one team formed from 9 class members n Chat time was established so all team members could be present n Team Selected “Kanban/Pull System” as its project n Team leader and assistant leader were appointed n Team completed start-up assessment

Team Goals/Expectations n To follow and analyze the implementation of a Kanban/pull system in the spray arm work station on the lower dishrack line at Whirlpool Corporation - Findlay Division. n To develop the necessary documentation through critique and phase portfolios. n To use team members, chats, courseware, tools/documentation of Whirlpool, and additional outside resources to construct a grand portfolio that can be utilized to assess the project.

Team Communication n Chats developed the focus and improved team members understanding n Formats were discussed and improved through communication n Team members learned more about Lean Manufacturing applied at Whirlpool n Team members were delegated responsibilities for each toolkit and expected to post at a specified time n Dr. Sinn assessed the toolkits as they were posted

Team Growth n Team has developed a good foundation in lean manufacturing and the required documentation as it relates to ISO 9000 n Each member has gained applicable knowledge for possible future employment in industry n Team has learned the fundamentals for creating a portfolio n Team pulled together and reduced and eliminated problems with data collection and format n Members have obtained knowledge from this phase presentation to help improve their skills for creating future portfolios

Phase I Toolkits 22-24

Phase Portfolio n RCA’s n Regular Critique Assessments n Allows team members to research material, input information, compile and review the work of others n 5 RCA’s that progress toward a phase portfolio during each critique portfolio n SDA’s n Standard Dedicated Audits n Applies technical content of Toolkits to project objectives n gathers the research and analysis of all team members n 24 SDA’s will be compiled for a Final Phase Portfolio

Toolkit #22 "Kaizen Documentation Foundations For Data Driven Process Variation, Waste Reduction, Lean Six Sigma"

Toolkit #22 Objectives n ISO 9000: Basis for Quality Systems n Kaizen, Six Sigma, Lean Process n Traditional Productivity Tools n Using Charts, Data n Tying the Process Together n Evaluation

Relation of Toolkit #22 to Project RCA - Kaizen Documentation - Lean Six Sigma SDA - Documentation of Process Variation - Determining Waste Reduction

Toolkit #23 "Basic Economic Considerations, Cost Related Documentation For Kaizen, Lean Systems, Quality Relationships"

Toolkit #23 Objectives n Quality Cost and Waste n Purpose of Business n P and L, Operating Statement n Economic Tools n Kaizen Cost Analysis, Value Added n Break Even and Capital Investment n Material Planning

Relation of Toolkit #23 to Project RCA - Profit is the Reason for Business - Being Successful at Business SDA - Analyzing Cost - Determining Value Added - Investments

Toolkit #24 "Ongoing Process Control Plan (OPCP), Standard Operating Procedures (SOP) For Lean: Infrastructure For Understanding Process"

Toolkit #24 Objectives n n Ongoing Process Control Plan (OPCP) n n Standard operating procedures (SOP) n n Team Problem Solving, Documentation, Variation Reduction for Lean n n 8-D Overviewed for Solving Problems n n Roles, Ongoing Improvement, Broader Issues Traditional Productivity Tools, Documentation for Improvement

Relation of Toolkit #24 to Project RCA - Being efficient at solving problems in the future - Ongoing improvement SDA - Ongoing Process Control Plan - Standard Operating Procedures

Phase II Toolkits 25-27

Toolkit #25 "Synchronous Production: Enhanced Best Practices For Change, Lean, Variation Reduction"

Toolkit #25 Objectives n n Synchronization n n Lean Systems Applied: Kanban, Takt, SMED n n Total Productive Maintenance n n Failsafing and Poka Yoke Design n n Best Practices, Bench Marking, Auditing n n Applied Technical Research for Synchronous, Lean, Kaizen n n DOE n n Auditing Our Quality

Relationship of Toolkit #25 to Project RCA - Synchronous Production - Lean and Best Practices SDA - Operation Capacity Analysis - Failsafing - Benchmarking

Toolkit #26 "Failure Mode And Effects Analysis (FMEA), Quality Function Deployment (QFD), Reliability For Robust Problem Solving"

Toolkit #26 Objectives n n Failure Mode and Effects Analysis (FMEA) n n The Design Process n n Design, Product, and Process FMEA n n FMEA Steps and Procedures n n Product Liability, FMEA, Reliability, Finite Element Analysis (FEA) n n General Reliability Issues, Kaizen and FMEA n n Quality Function Deployment (QFD) for Lean Introduced

Relationship of Toolkit #26 to Project RCA - Design, Product, and Process Failure Mode and Effects Analysis - Quality Function Deployment - Finite Element Analysis SDA - Failure Mode and Effects Analysis - Corrective Action - Planning Assessment and Potential Problem Analysis

Toolkit #27 "Total Productive Maintenance, Safety And Ergonomics: Re-engineered Lean Environment"

Toolkit #27 Objectives n n Maintenance Requirements and Lean Service n n Types of Maintenance n n TPM, Synchronous Quality for Lean n n Safety, Human Factors, Quality Objectives n n Safety and Ergonomic Management n n Controlling Physical Conditions for Ergonomic Enhancement

Relationship of Toolkit #27 to Project RCA - Types of Maintenance - Total Productive Maintenance - Safety and Ergonomics SDA - Maintenance Tracking - Safety Procedures/Inspections - Pareto Charting

Phase II Portfolio Short Form End