© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name What Lean Means to Printers Young.

Slides:



Advertisements
Similar presentations
Implementing a Behavior Based Safety Process at Rockwell Automation
Advertisements

© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
Airbus Production System
Reengineering and streamlining government services since We believe… If you don’t have knowledge of your business processes and don’t manage them.
Plate Mounting Minimise press downtime Latest developments in mounting.
 Truths About Change  Work Smarter, Not Harder  Lean Processing  Wants and Needs  How do we begin?
IR Dryers – Productivity and Safety ACCCSA Technical Presentation Cartagena, Columbia 2014.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
Going Lean Can it work for the Medical University? Jennifer Hooks MBA Manager, Performance Improvement Six Sigma Master Black Belt Lean Sensei.
McGraw-Hill/Irwin Copyright © 2009 by the McGraw-Hill Companies, Inc. All rights reserved.
Chapter 3 Planning for Production. Objectives Product oriented manufacturing systems versus people oriented manufacturing systems. Manufacturing smaller.
Lars Holm, Sales Director, Flexo Wash By Lars Holm, Sales Director, Flexo Wash Anilox Rolls and Plates - Keep them Clean!
Employee Motivation Student Name. Finding Ways to Motivate With minimal sales growth, the company must consider other methods to motivate employees.
V i s i o n ACCOMPLISHED ™ Portfolio Management Breakthroughs Shelley Gaddie President Project Corps Pacific Northwest Portfolio Management Roundtable.
October 15, 2012 Jose Chavez Jr, Quality & Technical Services Engineer.
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Benefits of the new EAM release QAD West Coast Users Group Presenter: Kate Fenello EAM 12.8.
Lean Accounting and Value Stream Costing
Just-in-Time and Lean Systems
MSE507 Lean Manufacturing
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Hilton Maher Selto. Activity-Based Management McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Lean Manufacturing Chris Poteet Scott Carroll.
Material Handling. Materials Handling Materials handling is a non-value activity that your customer is unwilling to pay for. Constantly question material.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean Organizational Structure Lean Leadership Series.
Retailing Management 8e© The McGraw-Hill Companies, All rights reserved. 9 - CHAPTER 2CHAPTER 1 CHAPTER 9 McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Total Productive Maintenance (TPM)
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
Freeleansite.com The Lean Enterprise Why Change ? Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Chapter 1 Enterprise Wide View.
Testing and Cost / Benefit Tor Stålhane. Why cost / benefit – 1 For most “real” software systems, the number of possible inputs is large. Thus, we can.
Paul Macdonald Sales Manager Mark Andy UK Advancements in Flexo Technology.
Financial benefits of lean improvement
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Toyota Production System (TPS) MGMT- E5060 Operations Management.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
© 2009 Capaccio Environmental Engineering, Inc. “Helping Industry and the Environment Prosper” Pollution Prevention Saves Money By Reducing Operational.
Lean Basics Dewey Warden.
Expense Reduction: the timing has never been better! Lycia Rettig, Director Expense Reduction Analysts
May 13, 2009 First Quarter 2009 Earnings Review. Highlights  First quarter 2009 net sales of $46.6 million -- within the Company’s forecasted range 
© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Set Up and Waste Reduction Young.
Managing by value stream
Philosophy and Key Concepts
JUST IN TIME Operational Systems for Manufacturing… JIT and Lean Production.
IGCSE Business Studies
Lean Manufacturing Chapter 15 pp June 29, 2012.
Chapter 17 Purchasing & Quality Copyright 2006 Prentice Hall Publishing Company 1 Purchasing, Quality Control, and Vendor Analysis.
Chapter 4 Product Costing for Management Decisions: Activity-Based Costing and Activity-Based Management.
Total Productive Maintenance (TPM)
“Without the Cost of Waste …”
Starter. Objectives Recap key CPA items Define lean production Using two examples explain how CPA can be used to achieve Lean Production.
HOME Copyright EASE Inc Tutorials© The “5S” Philosophy An EASEworks® Manufacturing Tutorial START Ver 6.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
CONFIDENTIAL & PROPRIETY | ALL RIGHTS RESERVED INNOVATION IN FAMILY BUSINESS OKEILI & CO 1 Session 2: Governance in Family Businesses: The Innovative Role.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
© BMA Inc All rights reserved. The Value Stream Managing by value stream.
Cloud solutions for growing entrepreneurial companies EXACT SOFTWARE.
Introduction to OEE (Overall Equipment Effectiveness)
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
Dave Vedder October 2012 Thank you to all Sponsors!
© 2014 GS1 US ALL RIGHTS RESERVED Making a Difference 1.
Benefits REVO BOBST FI is part of the REVO team REVO Privilege
Lean and Quality Management Kaizen and lean
Quick Changeover Techniques
Quick Set-Up Technique
Presentation transcript:

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name What Lean Means to Printers Young Leaders Development Organization – TLMI Annual Meeting 2012

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Value of Lean Kelly Ferrara Project Engineer Whitlam Label Company

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name The Real Value of Lean Lean at the Core… 1.Focus on Customer Value & Employee Development 2.Ways to better run the business 3.Pursue continuous improvement, just-in-time production 4.Minimize waste 5.Develop a framework of Innovation Reducing setups and make ready is just the beginning.

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Be For Real Lean is a simple concept, but complex to implement and sustain. It took Toyota several decades to refine their ideas It is about human capital development It is about building a culture of curiosity and continuous improvement It is about leveraging the eyes, ears, and brains of the people “on the floor” Alternatives to “the way it has always been done” Your culture will make or break the success of Lean

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Issues We Deal With **Just Averages** Company Size:$10,000,000 Employees:50 Material Purchases:$4,000,000 Total Compensation:$2,500,000 Healthcare:$300,000 Total:$6,850, % Annual Increase$171,250 How do you currently plan to offset the $171,250 cost increase, or 1.7% in lost profit?

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Non-Value Added Items See things through the customer’s eyes – is your estimating group a value added? Some other non-chargeable items to consider: –Waiting for substrate –Waiting for plates/cylinders –Waiting for ink –Waiting for customer –Waiting for quality approval –Waiting for maintenance –Shift clean up –Routine maintenance –Unplanned maintenance –Repairs –Rework –And a bunch of others! Difficult economic times are the right times to reinforce the importance of Lean.

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Quick Changeover Steve Schulte Vice President, Sales & Marketing Mark Andy Inc.

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Optimal Change Overs All market segments report that run lengths are getting shorter Shorter run lengths are driven by several factors –Customer Lean initiatives – reduction of inventories at customer facilities. –Regionalized promotions – causing variations in high running brands –Increase in brand types - more flavors within the same brand family

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Are you looking to get the most out of your team and equipment? Are your change over times higher than expected? Do you even know what your target and actual performance are? Ask Yourself There can be no information without data There can be no improvement without information How Performance Improves with Management Information Improvement Measurement Data There can be no measurement without information There can be no data without shop-floor involvement

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Basic pressure sensitive label, 8-color, UV ink, 50,000 label run Based on 50 weeks per year, 2 shifts, 80% run time per shift What if you save 1 minute per station? Current ProcessOptimized Process Difference Number of jobs1,9822, Direct profit margin potential - annual $636,844$706,143$69,299 Job margin30%30.5%0.5% pts. Change Over Impact

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Basic pressure sensitive label, 8-color, UV ink, 50,000 label run Based on 50 weeks per year, 2 shifts, 80% run time per shift What if you save 2 minutes per station? Current ProcessOptimized Process Difference Number of jobs1,9822, Direct profit margin potential - annual $636,844$789,521$152,677 Job margin30%30.9%0.9% pts. Change Over Impact

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Current ProcessOptimized Process Difference Number of jobs1,9822, Direct profit margin potential - annual $636,844$838,206$201,362 Job margin30%31.2%1.2% pts. Basic pressure sensitive label, 8-color, UV ink, 50,000 label run Based on 50 weeks per year, 2 shifts, 80% run time per shift What if you save 2 min. per station and 3 min. on die change? Change Over Impact

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Current data (change over times, downtime, footage per shift, etc..) Press operators and support staff – measure and report on training Time for the improvements to take place Extra set of aniloxes, ink pans, metering rollers, doctor blade assemblies, print cylinders and change over cart Ownership of the process changes Commitment and willingness to change Standard work Things to Ensure Success

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Options: 1. Create a team and do it yourself 2. Seek outside experts and find solutions to your challenges Where do you start? Prepare your team in the right way!

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Some Benchmarking Ideas Video taping Spaghetti Mapping Stop watch time trails Activity logs Standard work instructions (plate mounting example)

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Create Standard Work

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name New Technology Can Help… But economics of a press have everything to do with consumables, waste, time, and labor.

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Low waste reduction between job changes Traditional or ‘older’ technology can easily take feet of material to set up a single job With new flexo, put job into register with in a few meters per color About 30 feet of material from last good label to first good label Even shorter when running versions of a label – which makes up a significant amount of short run work New Flexo Technology - Example Last good label Next job - first good label

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Teamwork The key is getting everyone to work together! 1.There are 19 operations in a standard pit stop 2.Every second saves equates to about 279 feet of track position at 190 miles per hour 3.Team is measuring their performance – constantly challenging themselves 4.Share the Profit – pay bonuses on improvement

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Helpful Calculator Tool Richie Muniak I.D. Images, LLC

© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name TLMI: Partnering to Grow Through Knowledge and Education Thank you!